Tender Details
About Tender
🏗️ Construction Bid: G Plus1 At Bop Pattamari For Bsf 🌞 The Directorate General, Bsf, Under The Ministry Of Home Affairs, Invites Bids For The Construction Of G Plus1 At Bop Pattamari, Within The Area Of Responsibility (Aor) Of 19 Bn Bsf, Under The Supervision Of Shq Bsf Dhubri. The Project Also Includes The Provision And Fixing Of A 1 Kwp Solar System And Solar Lights. 📅 Bid Submission Deadline: April 29, 2024, 12:00 Pm Interested Contractors Are Required To Submit A Tender Security Of Inr 44,14. No Tender Fee Is Payable. Bidders Must Demonstrate Expertise In Construction Projects, Particularly In Remote Locations, And Provide Detailed Proposals, Including Cost Estimates, Timelines, And Compliance With Environmental And Safety Regulations. Keywords: Construction, Bsf, Dg Bsf, Mha, G Plus1, Bop Pattamari, Solar System, Solar Lights, Government Tender, Aor, Bsf DhubriParticulars | Details |
---|---|
Title |
Construction Of G Plus1 At Bop Pattamari In Aor Of 19 Bn Bsf Under Shq Bsf Dhubri Sh Providing And Fixing Of 1 Kwp Solar System And Solar Lights
|
Description |
Construction Of G Plus1 At Bop Pattamari In Aor Of 19 Bn Bsf Under Shq Bsf Dhubri Sh Providing And Fixing Of 1 Kwp Solar System And Solar Lights
|
Organisation | DG,BSF,MHA | Central Govt. Ministry/Department |
Tender Id | 2024_BSF_804524_2 |
Reference Number |
3308-64 DATED 19 AP 2024 |
Tender Fee | 0 |
EMD | 4414 |
Tender Value | |
Place | SHQ BSF DBR |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=845698 |
Start Date | April 22, 2024 23:00 |
End Date |
29/04/2024 ( Expired 405 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of rrm protection wall at new tower no.: 04
Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge
Read moreConstruction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Construction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Read moreA/r and m.o to residential builiding under division no-3 at nabha estate shimla (sh -providing and fixing cupboard, pvc flooring,wall and floor tiles , painting and distempering etc in no. b-3-10 at nabha estate shimla )
A/r and m.o to residential builiding under division no-3 at nabha estate shimla&#x0d (sh -providing and fixing cupboard, pvc flooring,wall and floor tiles , painting and distempering etc in no. b-3-10 at nabha estate shimla )&#x0d
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreConstruction of c.c road in gali no. 05 and 06
Construction of c.c road in gali no. 05 and 06&#x0d at kot mohalla under ward 31
Read moreWork of dismantling, providing and fixing of razor barbed wire fencing for providing extra security precaution of s/s emergency spares at store of 400/220/132kv switchyard boundary wall and construction of security hut in 220/132kv s/y 400kv sub-stat
Work of dismantling, providing and fixing of razor barbed wire fencing for providing extra security precaution of s/s emergency spares at store of 400/220/132kv switchyard boundary wall and construction of security hut in 220/132kv s/y 400kv sub-stat
Read moreConstruction work of drain, culvert and 115 m cc road from the house of piyush srivastava to the houses of dinesh sharma, balendra sharma and jagdish sharma rupapur to strengthen the drainage system in district pratapgarh under infrastructure fund.
Construction work of drain, culvert and 115 m cc road from the house of piyush srivastava to the houses of dinesh sharma, balendra sharma and jagdish sharma rupapur to strengthen the drainage system in district pratapgarh under infrastructure fund.
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at dhrupdanga zone-13 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at dhrupdanga zone-13 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreof your Industry type