Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Excavation, Loading & Transportation And Staking Of Old Dump Fines At Kalta Irin Mine, Sail, Kalta
|
| Description |
Excavation, Loading & Transportation And Staking Of Old Dump Fines At Kalta Irin Mine, Sail, Kalta
|
| Organisation | Steel Authority of India Ltd | Public Sector Undertakings |
| Tender Id | 102637 |
|
Reference Number |
160/EE/PaWD-I/2024-25 |
| Tender Fee | 0 |
| EMD | 1 Lakh |
| Tender Value | - |
| Place | Rourkela Steel Plant |
| Link |
View Original Tender Notice
https://sailtenders.co.in/Home/TendDetails?hTend=102637 |
| Start Date | August 07, 2025 17:45 |
| End Date |
Expired
22/08/2025
Expired 420 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Loading and transportation of coal from ntpc talaipalli mine to any
Loading and transportation of coal from ntpc talaipalli mine to anyprivate freight terminal and loading in railway wagons for onwardtransportation to ntpc mouda.
Read moreHandling and transport on lumpsum basis - contract for excavation, loading of pond ash from ash dyke of ntpc mouda and transportation and unloading at stone mine at khasra no 495/1 at village panchgaon nagpur
Handling and transport on lumpsum basis - contract for excavation, loading of pond ash from ash dyke of ntpc mouda and transportation and unloading at stone mine at khasra no 495/1 at village panchgaon nagpur
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreCustom bid for services - loading & transportation of 150 mtrs belt conveyor 330 mtrs belt conveyor 1000mm belt drivehead from surface and unloading, transportation & installation of same at 35le by 54 by 55 re seam v at saoner mine no 1 of saone..
Custom bid for services - loading & transportation of 150 mtrs belt conveyor 330 mtrs belt conveyor 1000mm belt drivehead from surface and unloading, transportation & installation of same at 35le by 54 by 55 re seam v at saoner mine no 1 of saone..
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreWork contract for excavation, loading, transportation and unloading of the ash from ash dyke ii of sgtps, birsinghpur, distt. umaria m.p. to private land no. 1130 s owned by shri sanjeev khandelwal, ward no.11 birsinghpur pali for filling subsid
Work contract for excavation, loading, transportation and unloading of the ash from ash dyke ii of sgtps, birsinghpur, distt. umaria m.p. to private land no. 1130 s owned by shri sanjeev khandelwal, ward no.11 birsinghpur pali for filling subsid
Read moreHandling and transport on lumpsum basis - transport service, transportation charges for pond ash from the ash dyke of bltps to nearby mines voids abandoned stone quarries,handling and transport on lumpsum basis - excavation, excavation of pond ash,handling and transport on lumpsum basis - mine void filling work including ramming and watering,handling and transport on lumpsum basis - lump sum cost toward various activities required to be carried out for necessary approval permission compliance for utilisation of ash in mine quarry
Handling and transport on lumpsum basis - transport service, transportation charges for pond ash from the ash dyke of bltps to nearby mines voids abandoned stone quarries,handling and transport on lumpsum basis - excavation, excavation of pond ash,handling and transport on lumpsum basis - mine void filling work including ramming and watering,handling and transport on lumpsum basis - lump sum cost toward various activities required to be carried out for necessary approval permission compliance for utilisation of ash in mine quarry
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreof your Industry type