Tender Details
Particulars | Details |
---|---|
Title |
Installation Of Pump Motor With Rcc Structure 2 Nos And Allied Works With Existing Rig Bore Tube Well And Electrification Etc. I. Near Kolyan Sangha Ii. Netaji Subhas Park At Ward No 2 Under Suri Municipality For The Year Of 2023 24 Out Of Rs. 193.05
|
Description |
Installation Of Pump Motor With Rcc Structure 2 Nos And Allied Works With Existing Rig Bore Tube Well And Electrification Etc. I. Near Kolyan Sangha Ii. Netaji Subhas Park At Ward No 2 Under Suri Municipality For The Year Of 2023 24 Out Of Rs. 193.05
|
Organisation | MUNICIPAL AFFAIRS DEPARTMENT | State Govt. and UT |
Tender Id | 2024_MAD_684867_2 |
Reference Number |
WBMAD/ULB/SURI/NIeT/28/2023-24 (2nd Call) |
Tender Fee | 0 |
EMD | 3378 |
Tender Value | |
Place | SURI |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1491954 |
Start Date | March 13, 2024 23:30 |
End Date |
30/03/2024 ( Expired 388 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Jjm scheme under kathalia block/ sh construction of 8 (eight) nos. small bore deep tube well (sbdtw) (125mm x 100mm dia) along with installation of pump set, distribution of pipe line system and other allied work etc. within the jurisdiction of dws
Jjm scheme under kathalia block/ sh construction of 8 (eight) nos. small bore deep tube well (sbdtw) (125mm x 100mm dia) along with installation of pump set, distribution of pipe line system and other allied work etc. within the jurisdiction of dws
Read moreJjm scheme under kathalia block/ sh construction of 8 (eight) nos. small bore deep tube well (sbdtw) (125mm x 100mm dia) along with installation of pump set, distribution of pipe line system and other allied work etc. within the jurisdiction
Jjm scheme under kathalia block/ sh construction of 8 (eight) nos. small bore deep tube well (sbdtw) (125mm x 100mm dia) along with installation of pump set, distribution of pipe line system and other allied work etc. within the jurisdiction
Read moreDrilling of 08 nos. hp bore holes and installation of india mark ii extra deep well hand pump with installation at various villages of block rajsamand and railmagra under jurisdiction of division rajsamand
Drilling of 08 nos. hp bore holes and installation of india mark ii extra deep well hand pump with installation at various villages of block rajsamand and railmagra under jurisdiction of division rajsamand
Read moreProviding, installation and commissioning of submersible pumping machinery along with allied electro-mechanical works for newly sunk tube well of pump house no. ii under jaulia piped water supply scheme, block- bharatpur-ii and kharsa piped water s
Providing, installation and commissioning of submersible pumping machinery along with allied electro-mechanical works for newly sunk tube well of pump house no. ii under jaulia piped water supply scheme, block- bharatpur-ii and kharsa piped water s
Read moreWork of const and comm of 03 nos bore hole by dth/rotary/ combination/odex rig of 200 mm dia, supply and installation of energy efficient submersible pump sets, panels cables including commissioning and testing of tube well under sub div virat nagar
Work of const and comm of 03 nos bore hole by dth/rotary/ combination/odex rig of 200 mm dia, supply and installation of energy efficient submersible pump sets, panels cables including commissioning and testing of tube well under sub div virat nagar
Read moreConstr of mini tube well 05 nos. with 2.0 h.p. submersible motor pump and s/f of 05 nos. water cooler with accessories an s/f and repairing of led street light, repairing of 01 no. high mast with old led flood light driver acces works at n.m.y. gkp
Constr of mini tube well 05 nos. with 2.0 h.p. submersible motor pump and s/f of 05 nos. water cooler with accessories an s/f and repairing of led street light, repairing of 01 no. high mast with old led flood light driver acces works at n.m.y. gkp
Read moreEstimate for approach road rcc with ratio-1 2 4 from main gate to power transformer foundation size20x3mtr digging of 150 mm dia tube well including casing running mtr providing and fixing 5hp submersible pump with 2 year warranty at malhargarh
Estimate for approach road rcc with ratio-1 2 4 from main gate to power transformer foundation size20x3 mtr digging of 150 mm dia tube well including casing running mtr providing and fixing 5hp submersible pump with 2 year warranty at malhargarh
Read moreDrilling of bore hole by dth combination rig of 150 mm dia supply and installation of energy submersible pump sets panels cables other allied works including comm and testing of tube well at rural and urban scheme under jurisdiction div malpura
Drilling of bore hole by dth combination rig of 150 mm dia supply and installation of energy submersible pump sets panels cables other allied works including comm and testing of tube well at rural and urban scheme under jurisdiction div malpura
Read moreDrilling of bore hole by dth combination rig of 150 mm dia supply and installation of energy submersible pump sets panels cables and allied works including commissioning and testing of tube well at rural and urban scheme under jurisdiction div tonk
Drilling of bore hole by dth combination rig of 150 mm dia supply and installation of energy submersible pump sets panels cables and allied works including commissioning and testing of tube well at rural and urban scheme under jurisdiction div tonk
Read moreReplacement of non functioning existing non clog dry pit centrifugal pump motor no. 1 of gr ii at indraprastha under gap phase i with allied electromechanical works under medb, phe dte. in murshidabad.
Replacement of non functioning existing non clog dry pit centrifugal pump motor no. 1 of gr ii at indraprastha under gap phase i with allied electromechanical works under medb, phe dte. in murshidabad.
Read moreof your Industry type