Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Modification Of Base Structure Of Sump Pump At Drain Near Thickener No. 2, Rectification Of Base Structure Of Pump At Media Powder Hopper And At Zero Meter Along With Changing/ Repairing Of Connected Damaged Pipeline For Smooth Operation Of These Pum
|
| Description |
Modification Of Base Structure Of Sump Pump At Drain Near Thickener No. 2, Rectification Of Base Structure Of Pump At Media Powder Hopper And At Zero Meter Along With Changing/ Repairing Of Connected Damaged Pipeline For Smooth Operation Of These Pum
|
| Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
| Tender Id | 2025_BCCL_344118_1 |
|
Reference Number |
BCCL/PO/MND/EnM/E -Tender/2025-26/E 826 |
| Tender Fee | 0 |
| EMD | 4300 |
| Tender Value | - |
| Place | MOONIDIH WASHERY |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=356721 |
| Start Date | September 17, 2025 14:30 |
| End Date |
Expired
25/09/2025
Expired 386 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling, repairing and strengthening of base structure of vertical sump pump at zero mtr. level and repairing and changing of spray pipelines of washery building at moonidih coal washery.
Dismantling, repairing and strengthening of base structure of vertical sump pump at zero mtr. level and repairing and changing of spray pipelines of washery building at moonidih coal washery.
Read moreDismantling/ changing of all the pumps and motors base frame structure along with damaged suction and delivery pipelines under thickener no. ii of moonidih coal washery.
Dismantling/ changing of all the pumps and motors base frame structure along with damaged suction and delivery pipelines under thickener no. ii of moonidih coal washery.
Read moreDismantling and changing worn-out feed launder along with repairing/ changing of walkway, walkway support structure, rake arms etc. of thickener no.1 of moonidih coal washery.
Dismantling and changing worn-out feed launder along with repairing/ changing of walkway, walkway support structure, rake arms etc. of thickener no.1 of moonidih coal washery.
Read moreRepairing and strengthening of all pump and motor base frame structure along with changing of damaged suction and delivery pipelines near the pumps under thickener no. 1 of moonidih coal washery.
Repairing and strengthening of all pump and motor base frame structure along with changing of damaged suction and delivery pipelines near the pumps under thickener no. 1 of moonidih coal washery.
Read moreDismantling and repairing/ changing of base structure of slurry pump 655-2, 655-3 and sump pump at (-3) mtr. of washery building of moonidih coal washery.
Dismantling and repairing/ changing of base structure of slurry pump 655-2, 655-3 and sump pump at (-3) mtr. of washery building of moonidih coal washery.
Read moreDismantling, repairing and strengthening of base structure of power hopper structures and its pump and motor base frame behind washery building at moonidih coal washery.
Dismantling, repairing and strengthening of base structure of power hopper structures and its pump and motor base frame behind washery building at moonidih coal washery.
Read moreDismantling, fabrication and erection of steel structure work of b side grizzly and repairing / changing of gear box and motor base frame structure of a side shuttle in pch section of sawang washery.
Dismantling, fabrication and erection of steel structure work of b side grizzly and repairing / changing of gear box and motor base frame structure of a side shuttle in pch section of sawang washery.
Read moreFabrication/erection of steel structural and repairing of 44, 45 pump suction, delivery pipe line, replacement of feed pipe, flanges and pump base structure near 30 mtr. thickener in main plant at sawang washery.
Fabrication/erection of steel structural and repairing of 44, 45 pump suction, delivery pipe line, replacement of feed pipe, flanges and pump base structure near 30 mtr. thickener in main plant at sawang washery.
Read moreMtps i mill plant ac plant ac cooling tower stage i ii sump tank overflow water drain line laying rerouting to bottom ash hopper unit i trench for zero discharge of a zone area and providing an accessories of water level indicator for sump tanks
Mtps i mill plant ac plant ac cooling tower stage i ii sump tank overflow water drain line laying rerouting to bottom ash hopper unit i trench for zero discharge of a zone area and providing an accessories of water level indicator for sump tanks
Read moreReplacement of damaged under hopper feeding discharge liner,damaged/decayed supporting base frame arrangement of r,p gate after dismantling and re-installation of these gates and electromagnetic vibrofeeder alignment of raw coal bunker unit no. 120g
Replacement of damaged under hopper feeding discharge liner,damaged/decayed supporting base frame arrangement of r,p gate after dismantling and re-installation of these gates and electromagnetic vibrofeeder alignment of raw coal bunker unit no. 120g
Read moreof your Industry type