Tender Details

Particulars Details
Title
(1) Ctr/S 14.489 Tkms On Various Loop Line Under Sr. Den (N) Bsl Jurisdiction. (2) Through Sleeper Renewal On Touts (1:8.5 1 Nos. And 1:12 5 Nos. Total 6 Nos.) In Pc Bsl Section.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 77470340
Reference
Number
DRMWBSL352024t7
Tender Fee 0
EMD 3.45 Lakh
Tender Value -
Place Mumbai CST
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/102024/77470340/viewNitPdf_4718718.pdf

Start Date September 19, 2024 15:53
End Date
Expired 21/10/2024

Expired 726 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Standardisation of turnouts (total 200 nos.) - sleeper spacing, casual sleeper and fittings renewal, plate screw renewal, casual rail renewal for gapless crossing, deep screening, tamping and other miscellaneous works in the jurisdiction of assistant engineer/ballygunge under divisional engineer/hq/sealdah.

Standardisation of turnouts (total 200 nos.) - sleeper spacing, casual sleeper and fittings renewal, plate screw renewal, casual rail renewal for gapless crossing, deep screening, tamping and other miscellaneous works in the jurisdiction of assistant engineer/ballygunge under divisional engineer/hq/sealdah.

Read more
Open e-tender for complete track renewal/through sleeper renewal work of 53.9 tkm with own pqrs machine & 5.72 tkm by manual, total= 59.62 tkm.(under senior divisional engineer/i/malda- manual ctr(p)- 4.252 tkm, by machine-1 tkm; senior divisional engineer/ii/malda- ctr(p) by machine- 13 tkm, manual ctr(p) 0.375 tkm, tsr(p) by machine-3.200 tkm manual tsr(p) 0.3 tkm and senior divisional engineer/iii/malda- ctr(p) by machine- 8 tkm, manual ctr(p) 0.398 tkm, tsr(p) by machine- 28.7 tkm,

Open e-tender for complete track renewal/through sleeper renewal work of 53.9 tkm with own pqrs machine & 5.72 tkm by manual, total= 59.62 tkm.(under senior divisional engineer/i/malda- manual ctr(p)- 4.252 tkm, by machine-1 tkm; senior divisional engineer/ii/malda- ctr(p) by machine- 13 tkm, manual ctr(p) 0.375 tkm, tsr(p) by machine-3.200 tkm manual tsr(p) 0.3 tkm and senior divisional engineer/iii/malda- ctr(p) by machine- 8 tkm, manual ctr(p) 0.398 tkm, tsr(p) by machine- 28.7 tkm,

Read more
Complete track renewal (p) 60 kg = 31.475 tkm and through sleeper renewal(p)=11.444 tkm. total=43.019 tkm by using any track laying equipment (tle) in sdah division of eastern railway

Complete track renewal (p) 60 kg = 31.475 tkm and through sleeper renewal(p)=11.444 tkm. total=43.019 tkm by using any track laying equipment (tle) in sdah division of eastern railway

Read more
(i) through rail renewal (primary) {trr(p)} for 37.353 tkm in rksn-pdph & pdph-nyg section & (ii) through turnout renewal {ttr(tws)} for total 269 sets in different yards of rksn-pdph, pdph-nyg, pdph-byx & bjmd-gx section under the jurisdiction of sr. den (south)/ckp.

(i) through rail renewal (primary) {trr(p)} for 37.353 tkm in rksn-pdph & pdph-nyg section & (ii) through turnout renewal {ttr(tws)} for total 269 sets in different yards of rksn-pdph, pdph-nyg, pdph-byx & bjmd-gx section under the jurisdiction of sr. den (south)/ckp.

Read more
1) bortalao-kachewani-ttr (fs/tws/ecms) - 10 sets & ttr (ds)-01 sets. 2) durg-nagpur-through turnout sleeper renewal of point and crossings-105 sets. 3) durg-bortalao-ttr (fs+tws+wcmsc)-6 sets & ttr (ds)-2 sets. 4) turnout renewal - 11 sets (ds-04 sets, wcmsc -07 sets) in connection with the improvement and upgradation of running loop line under aden/gondia. 5) through turnout sleeper renewal at various yards in the jurisdiction of sr.den(east)/nagpur. 6) ttr-tws+wcmsc-40 sets &a

1) bortalao-kachewani-ttr (fs/tws/ecms) - 10 sets & ttr (ds)-01 sets. 2) durg-nagpur-through turnout sleeper renewal of point and crossings-105 sets. 3) durg-bortalao-ttr (fs+tws+wcmsc)-6 sets & ttr (ds)-2 sets. 4) turnout renewal - 11 sets (ds-04 sets, wcmsc -07 sets) in connection with the improvement and upgradation of running loop line under aden/gondia. 5) through turnout sleeper renewal at various yards in the jurisdiction of sr.den(east)/nagpur. 6) ttr-tws+wcmsc-40 sets &a

Read more
Electrical trd portion of works in connection with 1) daund - wadi tftr-3.00km. 2) solapur division-ttr(tsr) - 35nos (1 in 12-29 & 1 in 8.5-6) & ttr (tws+wcms) - 29nos.(1 in 12-4 & 1 in 8.5-25set). 3) daund - wadi - tbr - 57.80km. 4) solapur - wadi - tsr(p) - 24.61km. 5) daund - wadi - trr (p)-22.40km 6) solapur division - ctr(p) - 8.042tkm, trr(p) - 6.816tkm & trr(s) - 2.95tkm (passenger running loop lines) 7) daund - wadi (up) - twr - 8.800tkm. 8) daund - wadi tsr(p) - 31.3 7

Electrical trd portion of works in connection with 1) daund - wadi tftr-3.00km. 2) solapur division-ttr(tsr) - 35nos (1 in 12-29 & 1 in 8.5-6) & ttr (tws+wcms) - 29nos.(1 in 12-4 & 1 in 8.5-25set). 3) daund - wadi - tbr - 57.80km. 4) solapur - wadi - tsr(p) - 24.61km. 5) daund - wadi - trr (p)-22.40km 6) solapur division - ctr(p) - 8.042tkm, trr(p) - 6.816tkm & trr(s) - 2.95tkm (passenger running loop lines) 7) daund - wadi (up) - twr - 8.800tkm. 8) daund - wadi tsr(p) - 31.3 7

Read more
(a)part-i-detailed estimate of(a)ttr(fs+tws+wcmsc)=26 nos (1 in 8.5=17 nos, 1 in 12=9 nos) (b) ttr(ds)=16 nos, g.total =42 nos in itarsi-narkher section & part-ii-miscellaneous items in connection yard improvement up gradation work of passenger loop in 3 nos. barsali, dharakhoh and barbatpur yard in nagpur division. (b)nagpur division casual renewal of cs, cmsc, tws, ds & ttr(tfr). (c)nagpur division-casual renewal of rails=3.33 kms & casual renewal of sleepers=3.33 kms. (d)nagpur

(a)part-i-detailed estimate of(a)ttr(fs+tws+wcmsc)=26 nos (1 in 8.5=17 nos, 1 in 12=9 nos) (b) ttr(ds)=16 nos, g.total =42 nos in itarsi-narkher section & part-ii-miscellaneous items in connection yard improvement up gradation work of passenger loop in 3 nos. barsali, dharakhoh and barbatpur yard in nagpur division. (b)nagpur division casual renewal of cs, cmsc, tws, ds & ttr(tfr). (c)nagpur division-casual renewal of rails=3.33 kms & casual renewal of sleepers=3.33 kms. (d)nagpur

Read more
Through sleeper renewal (p) by agency s track laying (pqrs/sqrs/qrs/tle) portal and material (except rail) complete at purulia jn. - chandil jn. - tsr(p) (dn)- 20.281 tkm., purulia jn. - chandil jn. - tsr(p) ( up) - 16.289 tkm, kharagpur - bhadrak (up & dn) - tsr(p) - 49.619 tkm, (kgp & adra division) total tsr(p) =86.189 tkm. in ser

Through sleeper renewal (p) by agency s track laying (pqrs/sqrs/qrs/tle) portal and material (except rail) complete at purulia jn. - chandil jn. - tsr(p) (dn)- 20.281 tkm., purulia jn. - chandil jn. - tsr(p) ( up) - 16.289 tkm, kharagpur - bhadrak (up & dn) - tsr(p) - 49.619 tkm, (kgp & adra division) total tsr(p) =86.189 tkm. in ser

Read more
Howrah division -renewal of channel sleeper by h-beam sleeper total -3645 nos. in hwh division in following locations: -nh - bdc : dn 4.808 - 4.827 = 32 nos., 4.427 - 4.442 = 28 nos., 6.16 - 6.18 = 25 nos.; up 4.808 - 4.827 = 32 nos., 4.427 - 4.442 = 28 nos., 6.16 - 6.18 = 25 nos.; she - gogt : up 32.322 - 32.356 = 62 nos.;sl 66.044 - 66.076 = 58 nos., 67.951 - 67.984 = 60 nos., 62.031 - 62.494 = 842 nos.; up 0.931 - 0.953 = 38 nos.; dn 0.931 - 0.953 = 38 nos.;bdc - skg : dn 79.23 - 79.252 = 4

Howrah division -renewal of channel sleeper by h-beam sleeper total -3645 nos. in hwh division in following locations: -nh - bdc : dn 4.808 - 4.827 = 32 nos., 4.427 - 4.442 = 28 nos., 6.16 - 6.18 = 25 nos.; up 4.808 - 4.827 = 32 nos., 4.427 - 4.442 = 28 nos., 6.16 - 6.18 = 25 nos.; she - gogt : up 32.322 - 32.356 = 62 nos.;sl 66.044 - 66.076 = 58 nos., 67.951 - 67.984 = 60 nos., 62.031 - 62.494 = 842 nos.; up 0.931 - 0.953 = 38 nos.; dn 0.931 - 0.953 = 38 nos.;bdc - skg : dn 79.23 - 79.252 = 4

Read more
(1) ttr(wcmsc)- 02 sets in knhn-rtk d route & ttr (wcmsc)- 79 sets in kt-ngp a route under the jurisdiction of aden/tr./nagpur, (2) tbr 15.437 kms of passenger running loop lines of a route under the jurisdiction of aden/tr./nagpur, (3) nitr-kt-ttr (tws+wcmsc) - 37 sets & ds - 20 sets from 52 kg to 60kg under the jurisdiction of aden/tr./nagpur. and (4)through turnout sleeper renewal at various yards under the jurisdiction of aden/tr./nagpur.

(1) ttr(wcmsc)- 02 sets in knhn-rtk d route & ttr (wcmsc)- 79 sets in kt-ngp a route under the jurisdiction of aden/tr./nagpur, (2) tbr 15.437 kms of passenger running loop lines of a route under the jurisdiction of aden/tr./nagpur, (3) nitr-kt-ttr (tws+wcmsc) - 37 sets & ds - 20 sets from 52 kg to 60kg under the jurisdiction of aden/tr./nagpur. and (4)through turnout sleeper renewal at various yards under the jurisdiction of aden/tr./nagpur.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise