Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Heat Shrinkable Tube Part No Phz20048 Bn0,Heat Shrinkable Tube Part No Phz20095 Bn0,Heat Shrinkab
|
| Description |
|
| Organisation | Bangalore Metro Rail Corporation Limited | Ministry of Housing & Urban Affairs (MoHUA) |
| Tender Id | GEM/2025/B/6049980 |
|
Reference Number |
|
| Tender Fee | |
| EMD | |
| Tender Value | |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | March 12, 2025 18:44 |
| End Date |
Expired
03/04/2025
Expired 474 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | SR INDUS ELECTRO SYS PRIVATE LIMITED | - | 19-03-2025 14:56:00 | MII | Qualified |
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreNit no 01 work no 01
Door to door collection of waste in all wards 1 to 25 for three years iot based door to door coolection of waste from all residential establishment and commerical establishemnt in both day and night shift of municipal board asind bhilwara rajastahn
Read moreBeautification works at digiana ashram ward no 58
Beautification works at digiana ashram ward no 58
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreUnder district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreProvision of 50 bedded crisis ward and additional alteration upgradation of building no p-7/6 operation theatre at mh in military station pithoragarh
Provision of 50 bedded crisis ward and additional alteration upgradation of building no p-7/6 operation theatre at mh in military station pithoragarh
Read moreWork of development of infrastructure facilities in shri ram janaki temple located in ward no. 12 sardar bhagat singh nagar of nagar panchayat mathauli district kushinagar.
Work of development of infrastructure facilities in shri ram janaki temple located in ward no. 12 sardar bhagat singh nagar of nagar panchayat mathauli district kushinagar.
Read moreLicensing of co-branding and inside advertising rights of nine no. metro stations of corridor-1 (taj east gate - rbs college) of agra metro rail project in upmrc network.
Licensing of co-branding and inside advertising rights of nine no. metro 
 stations of corridor-1 (taj east gate - rbs college) of agra metro rail project in 
 upmrc network.
Read moreof your Industry type