Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Link Road From Silmoo To Sharchay Phase 2nd. (Under Sdp)
|
| Description |
Construction Of Link Road From Silmoo To Sharchay Phase 2nd. (Under Sdp)
|
| Organisation | Public Works Department | State Govt. and UT |
| Tender Id | 2024_PWD_12478_1 |
|
Reference Number |
E-Tender 103 of PW(RnB) Div Kargil 2023-24 |
| Tender Fee | 5000 |
| EMD | 16.64 Lakh |
| Tender Value | - |
| Place | Silmoo |
| Link |
View Original Tender Notice
https://tenders.ladakh.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=31344 |
| Start Date | February 03, 2024 20:30 |
| End Date |
Expired
20/02/2024
Expired 967 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of earthen channel for diversion of snow melting water from musbar to sharchay
Construction of earthen channel for diversion of snow melting water from musbar to sharchay
Read moreP no 218 maliyekkal padipremadathupara road maintanence-2nd phase
P no 218 maliyekkal padipremadathupara road maintanence-2nd phase
Read moreSupply, installation, testing and commissioning for lt extension of single phase 3 phase to residential block and hostel block at gdc nubra under sdp for the fy 2026 27.
Supply, installation, testing and commissioning for lt extension of single phase 3 phase to residential block and hostel block at gdc nubra under sdp for the fy 2026 27.
Read moreConstruction of fmtec center (phase 2nd) at sanwant kua, baori, jodhpur
Construction of fmtec center (phase 2nd) at sanwant kua, baori, jodhpur
Read moreElectrical and mechanical components for lis phase 1st stage 2nd khudpora
Electrical and mechanical components for lis phase 1st stage 2nd khudpora
Read moreOperation and maintenance of lwss maharal dakhyora 1st phase and 2nd phase in tehsil barsar distt. hamirpur hp
Deployment of manpower for operation of scheme for 365 days
Read moreExecution of 2nd phase architectural illumination of netaji birth place museum, cuttack.
Execution of 2nd phase architectural illumination of netaji birth place museum, cuttack.
Read moreSdp nilackal-contructing open well for water supply arrangement and enclosing the terrace floor at executive engineer office, sdp pathanamthitta.
Sdp nilackal-contructing open well for water supply arrangement and enclosing the terrace floor at executive engineer office, sdp pathanamthitta.
Read moreDeposit-govt ayurveda college pariyaram animal house 2nd phase-electrification general electrical work
Deposit-govt ayurveda college pariyaram animal house 2nd phase-electrification general electrical work
Read morePro-50/26-27canal road concreting behind the mangode lokaparameswari temple 2nd phase ward 14
Pro-50/26-27canal road concreting behind the mangode lokaparameswari temple 2nd phase ward 14
Read moreof your Industry type