Tender Details
Particulars | Details |
---|---|
Title |
Darauli Renovation Of Boosting Station And Laying Of Pipeline With Fhtc Balance Work Of Rohrai With Water Works I.E V Notch, Ceramic Tiles, Painting , Centering And Shuttering Brick Work Cement Plaster, Polythin Sheet Etc Complete In All Respcect.
|
Description |
Darauli Renovation Of Boosting Station And Laying Of Pipeline With Fhtc Balance Work Of Rohrai With Water Works I.E V Notch, Ceramic Tiles, Painting , Centering And Shuttering Brick Work Cement Plaster, Polythin Sheet Etc Complete In All Respcect.
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2024_HRY_420061_1 |
Reference Number |
10111-10982 dt. 20.12.2024 |
Tender Fee | 1680 |
EMD | 9980 |
Tender Value | |
Place | PHED Kosli |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=496735 |
Start Date | December 26, 2024 22:30 |
End Date |
02/01/2025 ( Expired 125 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Inviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Inviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Read moreReplacement of existing wooden cupboard, damaged by termite with termite proof cupboards by using non wooden items i.e. ceramic wall tiles on walls, granite partitions and iron sheet steel cupboard shutters, distempering and painting of 72 rooms an
Replacement of existing wooden cupboard, damaged by termite with termite proof cupboards by using non wooden items i.e. ceramic wall tiles on walls, granite partitions and iron sheet steel cupboard shutters, distempering and painting of 72 rooms an
Read moreBalance work under jjm at village saleha block gunnor based on tw. i.c pipeline, oht etc i/c cost of all material and labour with 90days trialrun commissioning period of entire scheme.
Balance work under jjm at village saleha block gunnor based on tw. i.c pipeline, oht etc i/c cost of all material and labour with 90days trialrun commissioning period of entire scheme.
Read moreRepair maintenance of chequered tiles, interlocking tiles, plain cement concrete, brick work, and plaster work for foot path, hard standing culvert and painting to kerb stone work in sagar and varuna residential complex at npol kochi
Repair maintenance of chequered tiles, interlocking tiles, plain cement concrete, brick work, and plaster work for foot path, hard standing culvert and painting to kerb stone work in sagar and varuna residential complex at npol kochi
Read moreDarauli renovation of boosting station and laying of pipeline with fhtc balance work of rohrai with water works i.e v-notch, ceramic tiles, painting , centering and shuttering brick work cement plaster, polythin sheet etc complete in all respcect.
Darauli renovation of boosting station and laying of pipeline with fhtc balance work of rohrai with water works i.e v-notch, ceramic tiles, painting , centering and shuttering brick work cement plaster, polythin sheet etc complete in all respcect.
Read moreSpecial repair work in water supply boosting station and ess at bharti nagar providing and laying water proofing work at terrace repair of plaster in ceiling and walls replacement of tiles doors painting work exterior and interior wall and ceiling an
Special repair work in water supply boosting station and ess at bharti nagar providing and laying water proofing work at terrace repair of plaster in ceiling and walls replacement of tiles doors painting work exterior and interior wall and ceiling an
Read moreWater treatment plant all type of work including sub station painting, metal filling, drainge line cleaning, sedimentation tank cleaning, pipeline leakage repairing etc, complete labour with material r and m work
Water treatment plant all type of work including sub station painting, metal filling, drainge line cleaning, sedimentation tank cleaning, pipeline leakage repairing etc, complete labour with material r and m work under pgwss
Read moreBalance work under jjm at village rajapur and simri madaiyan block panna based on tw. i.c pipeline, etc i/c cost of all material and labour with 90days trialrun commissioning period of entire scheme.
Balance work under jjm at village rajapur and simri madaiyan block panna based on tw. i.c pipeline, etc i/c cost of all material and labour with 90days trialrun commissioning period of entire scheme.
Read moreBalance work under jjm at village looka and bhitari block gunnor based on tw. i.c pipeline, etc i/c cost of all material and labour with 90days trialrun commissioning period of entire scheme
Balance work under jjm at village looka and bhitari block gunnor based on tw. i.c pipeline, etc i/c cost of all material and labour with 90days trialrun commissioning period of entire scheme
Read moreBalance work under jjm at village gukhor block panna based on tw. i.c pipeline, oht etc i/c cost of all material and labour with 90days trialrun commissioning period of entire scheme.
Balance work under jjm at village gukhor block panna based on tw. i.c pipeline, oht etc i/c cost of all material and labour with 90days trialrun commissioning period of entire scheme.
Read moreof your Industry type