Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Darauli Renovation Of Boosting Station And Laying Of Pipeline With Fhtc Balance Work Of Rohrai With Water Works I.E V Notch, Ceramic Tiles, Painting , Centering And Shuttering Brick Work Cement Plaster, Polythin Sheet Etc Complete In All Respcect.
|
Description |
Darauli Renovation Of Boosting Station And Laying Of Pipeline With Fhtc Balance Work Of Rohrai With Water Works I.E V Notch, Ceramic Tiles, Painting , Centering And Shuttering Brick Work Cement Plaster, Polythin Sheet Etc Complete In All Respcect.
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2024_HRY_420061_1 |
Reference Number |
10111-10982 dt. 20.12.2024 |
Tender Fee | 1680 |
EMD | 9980 |
Tender Value | |
Place | PHED Kosli |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=496735 |
Start Date | December 26, 2024 22:30 |
End Date |
02/01/2025 ( Expired 183 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Renovation and construction of new toilets and aluminium partition at academic building of nlu tripura in old tit campus and security room with toilet at girls hostel/sh construction of rcc, brick work, ceramic tiles, aluminium works etc.
Renovation and construction of new toilets and aluminium partition at academic building of nlu tripura in old tit campus and security room with toilet at girls hostel/sh construction of rcc, brick work, ceramic tiles, aluminium works etc.
Read moreConstruction of shopping complex at indapur chowk part 3 (additional two floor balance work i.e third floor -flooring, painting etc. finishing work and fourth floor construction with facad and canopy at terrace floor.) , baramati, dist. pune
Construction of shopping complex at indapur chowk part 3 (additional two floor balance work i.e third floor -flooring, painting etc. finishing work and fourth floor construction with facad and canopy at terrace floor.) , baramati, dist. pune
Read more1st class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410) km of pastaur pump canal, raibareli including all cost of material,
1st class brick work for lining of canal with 40 percent new brick alongwith cement plaster on both side of brick wall and cc work in bed of main canal from chainage (0.00 to 0.410) km of pastaur pump canal, raibareli including all cost of material
Read moreReplacement of existing wooden cupboard, damaged by termite with termite proof cupboards by using non wooden items i.e. ceramic wall tiles on walls, granite partitions and iron sheet steel cupboard shutters, distempering and painting of 72 rooms and
Replacement of existing wooden cupboard, damaged by termite with termite proof cupboards by using non wooden items i.e. ceramic wall tiles on walls, granite partitions and iron sheet steel cupboard shutters, distempering and painting of 72 rooms and
Read moreBrick relaying work with new 1st class brick, new brick linning with new 1st class brick, cc on bed with glass strip, cement plaster with all cost of material including labour and tool and plant etc at gokulpur pump canal in district sitapur
Brick relaying work with 40 percent new 1st class brick from chainage (0.010 to 0.200) km new brick linning with 100 percent new 1st class brick from 0.200 km to 0.600 km cc on bed with glass strip from 0.00 km to 0.600 km cement plaster from 0.00 to
Read moreSpecial repair of various s...
Repairing of cement plaster, brick work providing and laying of floor and wall tiles providing and fixing of sanitary and electric works etc
Read more1st class brick lining work with 100 percent new brick from chanage (0.00 to 0.700) km along with cement plaster on both side and cc work on bed with glass strip from (0.00 to 0.700)km at adaura pump canal in district barabanki including all cost of
1st class brick lining work with 100 percent new brick from chanage (0.00 to 0.700) km along with cement plaster on both side and cc work on bed with glass strip from (0.00 to 0.700)km at adaura pump canal in district barabanki including all cost of
Read moreInviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Inviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Read moreReplacement of existing wooden cupboard, damaged by termite with termite proof cupboards by using non wooden items i.e. ceramic wall tiles on walls, granite partitions and iron sheet steel cupboard shutters, distempering and painting of 72 rooms an
Replacement of existing wooden cupboard, damaged by termite with termite proof cupboards by using non wooden items i.e. ceramic wall tiles on walls, granite partitions and iron sheet steel cupboard shutters, distempering and painting of 72 rooms an
Read moreConstruction of support wall(one side) and compound wall (two sides) ,gate for the newly constructed village office varkala
Demolishing brick work, clearing jungle,earth work excavation,pcc, random rubble,filling available excavated earth,centering and shuttering,rcc work,steel work, hollow block masonry ,12mm cement plaster,pvc weep holes,steel work etc
Read moreof your Industry type