Tender Details

Particulars Details
Title
Darauli Renovation Of Boosting Station And Laying Of Pipeline With Fhtc Balance Work Of Rohrai With Water Works I.E V Notch, Ceramic Tiles, Painting , Centering And Shuttering Brick Work Cement Plaster, Polythin Sheet Etc Complete In All Respcect.
Description
Darauli Renovation Of Boosting Station And Laying Of Pipeline With Fhtc Balance Work Of Rohrai With Water Works I.E V Notch, Ceramic Tiles, Painting , Centering And Shuttering Brick Work Cement Plaster, Polythin Sheet Etc Complete In All Respcect.
Organisation Haryana Government | State Govt. and UT
Tender Id 2024_HRY_420061_1
Reference
Number
10111-10982 dt. 20.12.2024
Tender Fee 1680
EMD 9980
Tender Value
Place PHED Kosli
Link https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=496735
Start Date December 26, 2024 22:30
End Date

02/01/2025 ( Expired 125 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Inviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe

Inviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe

Read more
Replacement of existing wooden cupboard, damaged by termite with termite proof cupboards by using non wooden items i.e. ceramic wall tiles on walls, granite partitions and iron sheet steel cupboard shutters, distempering and painting of 72 rooms an

Replacement of existing wooden cupboard, damaged by termite with termite proof cupboards by using non wooden items i.e. ceramic wall tiles on walls, granite partitions and iron sheet steel cupboard shutters, distempering and painting of 72 rooms an

Read more
Balance work under jjm at village saleha block gunnor based on tw. i.c pipeline, oht etc i/c cost of all material and labour with 90days trialrun commissioning period of entire scheme.

Balance work under jjm at village saleha block gunnor based on tw. i.c pipeline, oht etc i/c cost of all material and labour with 90days trialrun commissioning period of entire scheme.

Read more
Repair maintenance of chequered tiles, interlocking tiles, plain cement concrete, brick work, and plaster work for foot path, hard standing culvert and painting to kerb stone work in sagar and varuna residential complex at npol kochi

Repair maintenance of chequered tiles, interlocking tiles, plain cement concrete, brick work, and plaster work for foot path, hard standing culvert and painting to kerb stone work in sagar and varuna residential complex at npol kochi

Read more
Darauli renovation of boosting station and laying of pipeline with fhtc balance work of rohrai with water works i.e v-notch, ceramic tiles, painting , centering and shuttering brick work cement plaster, polythin sheet etc complete in all respcect.

Darauli renovation of boosting station and laying of pipeline with fhtc balance work of rohrai with water works i.e v-notch, ceramic tiles, painting , centering and shuttering brick work cement plaster, polythin sheet etc complete in all respcect.

Read more
Special repair work in water supply boosting station and ess at bharti nagar providing and laying water proofing work at terrace repair of plaster in ceiling and walls replacement of tiles doors painting work exterior and interior wall and ceiling an

Special repair work in water supply boosting station and ess at bharti nagar providing and laying water proofing work at terrace repair of plaster in ceiling and walls replacement of tiles doors painting work exterior and interior wall and ceiling an

Read more
Water treatment plant all type of work including sub station painting, metal filling, drainge line cleaning, sedimentation tank cleaning, pipeline leakage repairing etc, complete labour with material r and m work

Water treatment plant all type of work including sub station painting, metal filling, drainge line cleaning, sedimentation tank cleaning, pipeline leakage repairing etc, complete labour with material r and m work under pgwss

Read more
Balance work under jjm at village rajapur and simri madaiyan block panna based on tw. i.c pipeline, etc i/c cost of all material and labour with 90days trialrun commissioning period of entire scheme.

Balance work under jjm at village rajapur and simri madaiyan block panna based on tw. i.c pipeline, etc i/c cost of all material and labour with 90days trialrun commissioning period of entire scheme.

Read more
Balance work under jjm at village looka and bhitari block gunnor based on tw. i.c pipeline, etc i/c cost of all material and labour with 90days trialrun commissioning period of entire scheme

Balance work under jjm at village looka and bhitari block gunnor based on tw. i.c pipeline, etc i/c cost of all material and labour with 90days trialrun commissioning period of entire scheme

Read more
Balance work under jjm at village gukhor block panna based on tw. i.c pipeline, oht etc i/c cost of all material and labour with 90days trialrun commissioning period of entire scheme.

Balance work under jjm at village gukhor block panna based on tw. i.c pipeline, oht etc i/c cost of all material and labour with 90days trialrun commissioning period of entire scheme.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise