Tender Details
Particulars | Details |
---|---|
Title |
Off Loading Work Towards Removal, Dismantling, Assembling And Fitment Of 37.00 X57,27.00 X49, 24.00 X35 And 18.00 X25 Size Otr Tyre For A Period Of 360 Days
|
Description |
Off Loading Work Towards Removal, Dismantling, Assembling And Fitment Of 37.00 X57,27.00 X49, 24.00 X35 And 18.00 X25 Size Otr Tyre For A Period Of 360 Days
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_ECL_318807_1 |
Reference Number |
GM/SBA/EXCV/e-Tender/24-25/85 |
Tender Fee | 0 |
EMD | 26406 |
Tender Value | |
Place | Sonepur Bazari Area,ECL |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330482 |
Start Date | October 15, 2024 22:30 |
End Date |
26/10/2024 ( Expired 203 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rewinding,repairing, dismantling and installation of ceiling fans and exhaust fans as and when required basis at different locations of bhubaneswari ocp for a period of 365 days
Rewinding,repairing, dismantling and installation of ceiling fans and exhaust fans as and when required basis at different locations of bhubaneswari ocp for a period of 365 days
Read moreDemounting and mounting work of 04 nos. engine and 04 nos. transmission of bd355 dozers of khadia project for a period of 365 days
Demounting and mounting work of 04 nos. engine and 04 nos. transmission of bd355 dozers of khadia project for a period of 365 days
Read moreDeployment of 01no.300mt capacity tyre mounted hydraulic crane for erection of higher size /heavy schedule pipes/piping spools in flare stack of iocl gujarat refinery and loading,unloading of higher size/heavy schedule pipes i.e.client issue material
Deployment of 01no.300mt capacity tyre mounted hydraulic crane for erection of higher size /heavy schedule pipes/piping spools in flare stack of iocl gujarat refinery and loading,unloading of higher size/heavy schedule pipes i.e.client issue material
Read moreOffloading the work of annual maintenance contract (amc) for repair and maintenance of air conditioning system fitted in operators cabin of 14 nos. beml machines of krishnashila project for period of 365 days.
Offloading the work of annual maintenance contract (amc) for repair and maintenance of air conditioning system fitted in operators cabin of 14 nos. beml machines of krishnashila project for period of 365 days.
Read moreAnnual work contract for cleaning of accumulated fly ash dust around the silo of phi phii phiii silo area roadsopen space near silo by hiring the jcb machine with sel and operator loading into the trucksdispose off into ash sump at 4x210mw silo
Annual work contract for cleaning of accumulated fly ash dust around the silo of phi phii phiii silo area roadsopen space near silo by hiring the jcb machine with sel and operator loading into the trucksdispose off into ash sump at 4x210mw silo
Read moreDay to day erection, reorganization, dismantling, shifting of 6.6kv and 3.3 kv ht overhead line ht cable at chhal ocm for a period of 01 year (365 days) at chhal ocm secl raigarh area .
Day to day erection, reorganization, dismantling, shifting of 6.6kv and 3.3 kv ht overhead line ht cable at chhal ocm for a period of 01 year (365 days) at chhal ocm secl raigarh area .
Read moreCleaning, loading, unloading and material handling works including cleaning of operator cabin of 02 nos. be-195b shovels (prakash and akash) of khadia project for a period of 313 days.
Cleaning, loading, unloading and material handling works including cleaning of operator cabin of 02 nos. be-195b shovels (prakash and akash) of khadia project for a period of 313 days.
Read moreWork of comprehensive annual maintenance contract (camc) of cooling appliances (air conditioners and refrigerators) at koyla nagar, karmik nagar and jagjivan nagar for the period of 02 years i.e. 730 days.
Work of comprehensive annual maintenance contract (camc) of cooling appliances (air conditioners and refrigerators) at koyla nagar, karmik nagar and jagjivan nagar for the period of 02 years i.e. 730 days.
Read moreArc for work of maintenance of existing pipe line irrespective of size including leakage repairing, pollution control and removal of choking, disconnection of illegal connections and inter connection at various schemes under dd-i jaipur
Arc for work of maintenance of existing pipe line irrespective of size&#x0d including leakage repairing, pollution control and removal of choking, disconnection of illegal connections and inter connection at various schemes under dd-i jaipur
Read moreDi /extension and dismantling of 6.6 kv power line of western part on as and when required basis for quarry section at gevra project for a period of 365 days
Di /extension and dismantling of 6.6 kv power line of western part on as and when required basis for quarry section at gevra project for a period of 365 days
Read moreof your Industry type