Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Flooring Of Washing Area And Gate In Front Of Block B In Girls Hostel No. 2 In Panjab University Campus, Sector 14, Chandigarh.
|
Description |
Construction Of Flooring Of Washing Area And Gate In Front Of Block B In Girls Hostel No. 2 In Panjab University Campus, Sector 14, Chandigarh.
|
Organisation | Government of Chandigarh (U.T) |
Tender Id | 2023_PU_76975_1 |
Reference Number |
6478/EE/Mtc |
Tender Fee | 0 |
EMD | 11000 |
Tender Value | |
Place | Const. Office, P.U. Campus, Sector-14, Chandigarh |
Link | https://etenders.chd.nic.in |
Start Date | October 10, 2023 21:30 |
End Date |
26/10/2023 ( Expired 606 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of supply and fixing of paving block in front of panchmukhi shiv mandir to omprakash chhipane to dayaram sahu in shashtri ward betul
Construction of supply and fixing of paving block in front of panchmukhi shiv mandir to omprakash chhipane to dayaram sahu in shashtri ward betul
Read moreConstruction of mountain museum and planetarium,under member of parliament local area development scheme in pauri constituency of pauri block of pauri garhwal
Construction of mountain &#x0d museum and &#x0d planetarium,under member of &#x0d parliament local area &#x0d development scheme in pauri &#x0d constituency of pauri block of &#x0d pauri garhwal &#x0d
Read moreAAAAAAAAAA
Login to viewConstruction of 800 bedded girls hostel (s plus g plus 10), kitchen and dining block (g plus 6) and hvac building (g plus 1) i/c internal water supply, sanitary installation, drainage, sewerage, water supply, u.g. tank (500000 liter), storm water drains, roads paths, internal e.i. fans, wet riser system, fire alarm system, ups system, cctv system, hydro pneumatic water supply system, substation equipment, central ac plant, illuminated signages, street lighting, lifts, horticulture landscaping and other development work bulk services (civil electrical) in main campus at iit(ism) dhanbad (package-i).
Read moreComp repair wks of b/r and e/m nature like joinery, plumbing, flooring, plastering, welcome maint alongwith repair/replacement of bldg security lights with all connected accessories in bldgs of zone v of chunabhatti area under age b/r-i at ns karanja
Comp repair wks of b/r and e/m nature like joinery, plumbing, flooring, plastering, welcome maint alongwith repair/replacement of bldg security lights with all connected accessories in bldgs of zone v of chunabhatti area under age b/r-i at ns karanja
Read moreComp repair wks of b/r and e/m nature like joinery, plumbing, flooring, plastering, welcome maint alongwith repair/replacement of bldg security lights with connected accessories in bldgs of zone e of navy nagar area under age b/r-i at ns karanja
Comp repair wks of b/r and e/m nature like joinery, plumbing, flooring, plastering, welcome maint alongwith repair/replacement of bldg security lights with connected accessories in bldgs of zone e of navy nagar area under age b/r-i at ns karanja
Read moreDesign and construction of overhead water tank of 15.0 mt staging 34 lacs litre capacity at scheme no. 151 and 169-b sector-a super corridor indore
Design and construction of overhead water tank of 15.0 mt staging 34 lacs litre capacity at scheme no. 151 and 169-b sector-a super corridor indore
Read moreCa no cwe/amb/south-19 of 2025-26 repair/resurfacing of roads including painting and replacement of road furniture in c-2 sector of age b/r-i under ge (south) ambala cantt
Ca no cwe/amb/south-19 of 2025-26 repair/resurfacing of roads including painting and replacement of road furniture in c-2 sector of age b/r-i under ge (south) ambala cantt
Read moreConstruction of boundary wall and pavers in front of adarsh nagar sulabh complex in ward no. 13
Construction of boundary wall and pavers in front of adarsh nagar sulabh complex in ward no. 13
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreCa no ge(u)/chm-30/2025-26 certain repairs to joinery, flooring, wall tiling, false ceiling, wall panelling work etc in ground floor and first floor of command hospital and other various location under age b/r (ch) of ge(u) chandimandir
Ca no ge(u)/chm-30/2025-26 certain repairs to joinery, flooring, wall tiling, false ceiling, wall panelling work etc in ground floor and first floor of command hospital and other various location under age b/r (ch) of ge(u) chandimandir
Read moreof your Industry type