Tender Details
Particulars | Details |
---|---|
Title |
Nctps I Operation Ca Rwph Dismantling The Existing Worn Out Damaged Reject Water Ms Erw Pipe Line 100 Nb And Erection Of Mild Steel Electric Resistance Welded 100 Nb New Ms Erw Pipes And Bend From Ro Stream To Reject Water Tank Dismantling The Existin
|
Description |
Nctps I Operation Ca Rwph Dismantling The Existing Worn Out Damaged Reject Water Ms Erw Pipe Line 100 Nb And Erection Of Mild Steel Electric Resistance Welded 100 Nb New Ms Erw Pipes And Bend From Ro Stream To Reject Water Tank Dismantling The Existin
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 8400 |
Tender Value | |
Place | NCTPS - I |
Link |
AAAAAAAAAA Login to view |
Start Date | June 06, 2025 00:00 |
End Date |
19/06/2025 ( 12 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Nctps i operation ca rwph dismantling the existing worn out damaged reject water ms erw pipe line 100 nb and erection of mild steel electric resistance welded 100nb new ms erw pipes and bend from ro stream to reject water tank dismantling the existin
Nctps i operation ca rwph dismantling the existing worn out damaged reject water ms erw pipe line 100 nb and erection of mild steel electric resistance welded 100nb new ms erw pipes and bend from ro stream to reject water tank dismantling the existin
Read moreNctps i operation circle ca dn rwph dismantling fabrication rubber lining and erection of msrl pipe bend and reducer in service water pump a b and c and raw water pump
Nctps i operation circle ca dn rwph dismantling fabrication rubber lining and erection of msrl pipe bend and reducer in service water pump a b and c and raw water pump
Read moreTtps operation circle cad acwph unit i annual overhauling dismantling and renewal of worn out and punctured pipes of bearing cooling water supply header 600 nb ms pipe line of unit i acw system near repair bay area
Ttps operation circle cad acwph unit i annual overhauling dismantling and renewal of worn out and punctured pipes of bearing cooling water supply header 600 nb ms pipe line of unit i acw system near repair bay area
Read moreTtps operation circle cad acwph unit i annual overhauling dismantling and renewal of worn out and punctured pipes of bearing cooling water return header 600 nb ms pipe line of unit i acw system near repair bay area
Ttps operation circle cad acwph unit i annual overhauling dismantling and renewal of worn out and punctured pipes of bearing cooling water return header 600 nb ms pipe line of unit i acw system near repair bay area
Read moreNctps i operation circle ca dn dm plant fabrication and erection of reject water line 80 nb and 50nb ms erw pipe and ms bend from reject water tank to overhead tank
Nctps i operation circle ca dn dm plant fabrication and erection of reject water line 80 nb and 50nb ms erw pipe and ms bend from reject water tank to overhead tank
Read moreTtps operation circle cad renewal of worn out and damaged 600 mm dia storm water discharge pipe line by erection of new 600 nb m.s pipes with 12 mm thick standard length 4 to 6 mtr from north side compound wall peripheral road to seashore compoun
Ttps operation circle cad renewal of worn out and damaged 600 mm dia storm water discharge pipe line by erection of new 600 nb m.s pipes with 12 mm thick standard length 4 to 6 mtr from north side compound wall peripheral road to seashore compoun
Read moreMtps i m ii oahs ash slurry lines dismantling of existing heavily worn out ash slurry ms pipes and erection of old used 350 nb ms erw pipes
Mtps i m ii oahs ash slurry lines dismantling of existing heavily worn out ash slurry ms pipes and erection of old used 350 nb ms erw pipes&#x0d &#x0d
Read moreNctps i operation circle ca dn rwph attending to leaks and puncture breakdown works in rwph to service water over head tank for fill line drawal line over flow line overhead tank to ichs line and reject water line by welding in the worn out
Nctps i operation circle ca dn rwph attending to leaks and puncture breakdown works in rwph to service water over head tank &#x0d &#x0d for fill line drawal line over flow line overhead tank to ichs line and reject water line by welding in the worn out
Read moreNctps i operation circle ca dn dm and ro plant dismantling of damaged peel off rubber lining pipe 200nb and erection of new fabricated msrl pipe 200nb from psf tank to permeate water tank in raw water by pass line dismantling and erection o
Nctps i operation circle ca dn dm and ro plant dismantling of damaged peel off rubber lining pipe 200nb and erection of new fabricated msrl pipe 200nb from psf tank to permeate water tank in &#x0d raw water by pass line dismantling and erection o
Read moreDismantling of existing worn out/ damaged stainless liners/ms plates, fabrication and erection of new ss liners and mother plate for pre weigh hopper and surge bin hopper of rapid loading system at chp, bina project.
Dismantling of existing worn out/ damaged stainless liners/ms plates, fabrication and erection of new ss liners and mother plate for pre weigh hopper and surge bin hopper of rapid loading system at chp, bina project.
Read moreof your Industry type