Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Complete Rewinding Of Alternator Assy
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2025/B/6534847 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | August 05, 2025 15:47 |
| End Date |
Expired
16/08/2025
Expired 422 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Procurement of alternator and starting motor for bhupalpalli area -reg.
Procurement of alternator and starting motor for bhupalpalli area -reg.
Read moreRepairing and reconditioning of blade assy and both sides blade arm assy of bd355 dozers p12028 and p11978, deployed at sonepur bazari projec.
Repairing and reconditioning of blade assy and both sides blade arm assy of bd355 dozers p12028 and p11978, deployed at sonepur bazari projec.
Read moreProcurement of delaval nozzle assy of 200nb size for ahp nkstpp
Procurement of delaval nozzle assy of 200nb size for ahp nkstpp
Read moreComplete cleaning and waste collection work for all wards in area of municipality phulera
Complete cleaning and waste collection work for all wards in area of municipality phulera
Read moreRewinding of lt motor and restacking of stator and rotor core, replacement of rotor aluminum bars of abb make 110kw, 415v dust extraction motor, pertaining to lt/em/chp for the year 2026 - 27
Rewinding of lt motor and restacking of stator and rotor core, replacement of rotor aluminum bars of abb make 110kw, 415v dust extraction motor, pertaining to lt/em/chp for the year 2026 - 27
Read moreTggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Tggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Read moreSupply of new mahindra bolero pik-up 1.5 fitted with bathla vehicle-mounted telescopic ladder, complete with winch, pulley, self-locking mechanism, mounting arrangement, rto registration, road tax and insurance.
Supply of new mahindra bolero pik-up 1.5 fitted with bathla vehicle-mounted telescopic ladder, complete with winch, pulley, self-locking mechanism, mounting arrangement, rto registration, road tax and insurance.
Read moreRepairing of walkways and platform of boom pulley assy. of 7820 dragline and fabrication and fitment of side collars of drag and hoist rope drum of 7820 dragline.
Repairing of walkways and platform of boom pulley assy. of 7820 dragline and fabrication and fitment of side collars of drag and hoist rope drum of 7820 dragline.
Read moreSupply of relay, ac immune, plug-in-type, style qbat, aci, dc biased track relay 9 ohms, 2f-2b contacts, front and back contacts metal to carbon, complete with plug board, retaining clip and connectors conforming as per rdso/spn/84 ver 2.0 or latest if any interlocking code is abejx.
Supply of relay, ac immune, plug-in-type, style qbat, aci, dc biased track relay 9 ohms, 2f-2b contacts, front and back contacts metal to carbon, complete with plug board, retaining clip and connectors conforming as per rdso/spn/84 ver 2.0 or latest if any interlocking code is abejx.
Read moreUnder the bettiah municipal corporation (ward no. 18), the project involves the renovation and construction of drains—complete with covering slabs—along two stretches: from behind the late ramprasad malik's house to behind bablu malik's house, and from behind jwala malik's house to bagad malik's house. additionally, culverts are to be constructed at three locations: near bablu malik's house and near chudihar pandit ji's house.
Under the bettiah municipal corporation (ward no. 18), the project involves the renovation and construction of drains—complete with covering slabs—along two stretches: from behind the late ramprasad malik's house to behind bablu malik's house, and from behind jwala malik's house to bagad malik's house. additionally, culverts are to be constructed at three locations: near bablu malik's house and near chudihar pandit ji's house.
Read moreof your Industry type