Tender Details
Particulars | Details |
---|---|
Title |
Welding And Co Axial Boring Of 3rd Intermediate Shaft Outer Bearing Housing And 3rd Intermediate Shaft Bearing Housing And 2nd Intermediate Shaft Bearing Housing Both Side Of 2 Nos. Propel Gear Box Assembly.
|
Description |
Welding And Co Axial Boring Of 3rd Intermediate Shaft Outer Bearing Housing And 3rd Intermediate Shaft Bearing Housing And 2nd Intermediate Shaft Bearing Housing Both Side Of 2 Nos. Propel Gear Box Assembly.
|
Organisation | Northern Coalfields Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 3100 |
Tender Value | |
Place | Bina Project, NCL |
Link |
AAAAAAAAAA Login to view |
Start Date | April 26, 2025 14:30 |
End Date |
07/05/2025 ( 2 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Complete repairing / overhauling of both side (lhs and rhs), 02 nos. propel gearbox assembly (part no. 4106002575) with providing of spares of be-195, 10 m3 rope shovel working at bina project.
Complete repairing / overhauling of both side (lhs and rhs), 02 nos. propel gearbox assembly (part no. 4106002575) with providing of spares of be-195, 10 m3 rope shovel working at bina project.
Read moreRepairing of (a) propeller shaft bearing housing, its foundation and prg box foundation (b) cracked and bended rh stand of hoist drum in ekg 5a shovel sl. no. 596 of jharkhand ocp.
Repairing of (a) propeller shaft bearing housing, its foundation and prg box foundation (b) cracked and bended rh stand of hoist drum in ekg 5a shovel sl. no. 596 of jharkhand ocp.
Read moreWelding and co-axial boring of 3rd intermediate shaft outer bearing housing and 3rd intermediate shaft bearing housing and 2nd intermediate shaft bearing housing both side of 2 nos. propel gear box assembly.
Welding and co-axial boring of 3rd intermediate shaft outer bearing housing and 3rd intermediate shaft bearing housing and 2nd intermediate shaft bearing housing both side of 2 nos. propel gear box assembly.
Read moreRepairing/co-axial line boring/machining work of a frame bearing housing, steering cylinder and steering tie rod mounting eye, rear suspension mounting eye, hoist jack mounting eye of 10 nos cat 777d/e 100t dumpers at nws for a period of 01 years.
Repairing/co-axial line boring/machining work of a frame bearing housing, steering cylinder and steering tie rod mounting eye, rear suspension mounting eye, hoist jack mounting eye of 10 nos cat 777d/e 100t dumpers at nws for a period of 01 years.
Read moreRepairing/re-welding and co-axial line boring/machining of bogie/trackpad eye holes of komatsu d475a model dozers sl. no-30539, 30542, 30545, 30550 and 30553 of khadia project for a period of 365 days.
Repairing/re-welding and co-axial line boring/machining of bogie/trackpad eye holes of komatsu d475a model dozers sl. no-30539, 30542, 30545, 30550 and 30553 of khadia project for a period of 365 days.
Read moreRepairing/rebuilding of worn out housing of arm(02 no.), boom (02 nos. ) boom cylinder foot pin ( 02 nos.), arm cylinder eye (04 nos.), boom foot housing (02 no.) and bucket cylinder eye (02 nos.) and then co-axial line boring to its original size i
Repairing/rebuilding of worn out housing of arm(02 no.), boom (02 nos. ) boom cylinder foot pin ( 02 nos.), arm cylinder eye (04 nos.), boom foot housing (02 no.) and bucket cylinder eye (02 nos.) and then co-axial line boring to its original size i
Read moreRepairing/co-axial boring of supporting wheel shaft housing and replacementandfitment of all 16 nos. supporting wheel assembly of both sides (lhsandrhs) of undercarriage in respect of wk-20 tyhi shovels (marutiandmahaveer) working at nigahi project
Repairing/co-axial boring of supporting wheel shaft housing and replacementandfitment of all 16 nos. supporting wheel assembly of both sides (lhsandrhs) of undercarriage in respect of wk-20 tyhi shovels (marutiandmahaveer) working at nigahi project
Read moreRepairing of input shaft and intermediate pinion shaft (worn out teeth) of gear box of c4 conveyor in all respect, repairing of the fluid coupling t12-12 and removal of the bearing and gear coupling of the drive shaft including shifting of all the ma
Repairing of input shaft and intermediate pinion shaft (worn out teeth) of gear box of c4 conveyor in all respect, repairing of the fluid coupling t12-12 and removal of the bearing and gear coupling of the drive shaft including shifting of all the ma
Read moreRequirement of single span drive shaft made from advanced composite material carbon fiber reinforced epoxy resin for idct fan with matching coupling for both ends at motor and gear box shaft unit 1 to 4 ctpp chhabra
Requirement of single span drive shaft made from advanced composite material carbon fiber reinforced epoxy resin for idct fan with matching coupling for both ends at motor and gear box shaft unit 1 to 4 ctpp chhabra
Read moreRepairing / re-conditioning of damaged / worn-out teeth of 02 nos. 3rd intermediate pinion shaft and 2 nos. tumbler gear of propel gear box system for be-195 shovel working at bina project.
Repairing / re-conditioning of damaged / worn-out teeth of 02 nos. 3rd intermediate pinion shaft and 2 nos. tumbler gear of propel gear box system for be-195 shovel working at bina project.
Read moreof your Industry type