| Particulars | Details |
|---|---|
| Title |
Installation Of On Load Isolator For Provision Of Link Switch At 3.3 Kv Overhead Lines Through Which Supply Power Is Tapped To Supply Electric Shovel Under Religara Project, Argada Area.
|
| Description |
Installation Of On Load Isolator For Provision Of Link Switch At 3.3 Kv Overhead Lines Through Which Supply Power Is Tapped To Supply Electric Shovel Under Religara Project, Argada Area.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_331698_1 |
|
Reference Number |
PE(EnM)/Rel/e-NIT/24-25/26 |
| Tender Fee | 0 |
| EMD | 4600 |
| Tender Value | |
| Place | Religara |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=343843 |
| Start Date | March 08, 2025 20:30 |
| End Date |
Expired
17/03/2025
Expired 448 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Operation and maintenance of 33 11 0440 kv sub station overhead transmission lines within the mining lease and acquired land area and power supply systems to various installations therein at kasnau matasukh lignite mines district nagaur
Operation and maintenance of 33 11 0440 kv sub station overhead transmission lines within the mining lease and acquired land area and power supply systems to various installations therein at kasnau matasukh lignite mines district nagaur
Read moreWork for installation of 11kv rmu and other line work against business plan 2026-27 for quality power supply in aligarh city on semi turn-key basis under the area eudc, aligarh
Work for installation of 11kv rmu and other line work against business plan 2026-27 for quality power supply in aligarh city on semi turn-key basis under the area eudc, aligarh
Read moreInstallation of new 250kva distribution transformers against business plan 2026-27 for quality power supply in aligarh city on semi turn-key basis in the area of ae technical-i/iii under eudc, aligarh
Installation of new 250kva distribution transformers against business plan 2026-27 for quality power supply in aligarh city on semi turn-key basis in the area of ae technical-i/iii under eudc, aligarh
Read moreExtension of 3.3 kv o/h lines in 6 no quarry of religara colliery under argada area.
Extension of 3.3 kv o/h lines in 6 no quarry of religara colliery under argada area.
Read moreRepairing of 240 kw, 3.3 kv, 1487 rpm induction motor make marathon of religara colliery under argada area
Repairing of 240 kw, 3.3 kv, 1487 rpm induction motor make marathon of religara colliery under argada area
Read moreInstallation of double interposing gland bus in various switch gears, motors and transformers installed at religara colliery under argada area.
Installation of double interposing gland bus in various switch gears, motors and transformers installed at religara colliery under argada area.
Read moreRestoring alternate arrangement feeder i 3.3 kv power supply to 554 electric shovel and pumping station at mine to reduce the load of feeder ii at tapin north ocp under hazaribagh area.
Restoring alternate arrangement feeder i 3.3 kv power supply to 554 electric shovel and pumping station at mine to reduce the load of feeder ii at tapin north ocp under hazaribagh area.
Read moreInstallation n erection of station type lighting arrestor in 3 mva 11kv3.3kv power transformer circuit at religara main substation under argada area
Installation n erection of station type lighting arrestor in 3 mva 11kv3.3kv power transformer circuit at religara main substation under argada area
Read moreWork of dismantling, shifting, installation of 33 kv, 6.6 kv, 3.3 kv electrical overhead lines at different location of power supply and back-up chp for a period of 730 days
Work of dismantling, shifting, installation of 33 kv, 6.6 kv, 3.3 kv electrical overhead lines at different location of power supply and back-up chp for a period of 730 days
Read moreErection of poles, drawing of conductor and earth wire of 3.3 kv overhead line at extension at satkaria coal face of gidi c colliery under argada area.
Erection of poles, drawing of conductor and earth wire of 3.3 kv overhead line at extension at satkaria coal face of gidi c colliery under argada area.