Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
State Plan Wss To Mallappaly, Anicad And Kottangal(part) Panchayaths. Balance Work Arranged On Risk And Cost Pipeline Work
|
| Description |
State Plan Wss To Mallappaly, Anicad And Kottangal(part) Panchayaths. Balance Work Arranged On Risk And Cost Pipeline Work
|
| Organisation | Kerala Water Authority | State Govt. and UT |
| Tender Id | 2025_KWA_782386_1 |
|
Reference Number |
01/2025-26/KWA/PHC/TVLA (RT-2) |
| Tender Fee | 19518 |
| EMD | 5 Lakh |
| Tender Value | - |
| Place | Mallappally |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1283831 |
| Start Date | August 04, 2025 23:30 |
| End Date |
Expired
12/08/2025
Expired 429 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Jal jeevan mission (jjm) - phase ii-wss to mallapally,anicad and kottangal panchayath- construction of 3mld wtp plant in malampara scheme (kottangal panchayath)
Jal jeevan mission (jjm) - phase ii-wss to mallapally,anicad and kottangal panchayath- construction of 3mld wtp plant in malampara scheme (kottangal panchayath)
Read moreBalance work of conversion of p t to piped water supply scheme of rwss sodhwali on the risk and cost under jjm
Balance work of conversion of p t to piped water supply scheme of rwss sodhwali on the risk and cost under jjm
Read moreExecution of balance punchlist item and maintenance works at risk n cost of 6 laning of bhubaneswar jagatpur chandikhole of nh 16 in the state of odisha
Execution of balance punchlist item and maintenance works at risk n cost of 6 laning of bhubaneswar jagatpur chandikhole of nh 16 in the state of odisha
Read moreBalance work for const of western side spur of rampur rudrapur sec connecting nh24 to nh 87 bypassing rampur town at risk and cost of contractor on epc mode in uttar pradesh
Balance work for const of western side spur of rampur rudrapur sec connecting nh24 to nh 87 bypassing rampur town at risk and cost of contractor on epc mode in uttar pradesh.
Read moreConstruction of 350 qtrs for port employees and also to facilitate and reserve land for the future expansion of the port in nuabazar area_1st phase 91 qtrs balance work risk and cost
Construction of 350 qtrs for port employees and also to facilitate and reserve land for the future expansion of the port in nuabazar area_1st phase 91 qtrs balance work risk and cost
Read moreExecution of balance work and maintenance work of the itarsi- betul section of nh-46 from ch. 63.00 to km 137.000 except tiger corridor section at the risk and cost of contractor
Execution of balance work and maintenance work of the itarsi- betul section of nh-46 from ch. 63.00 to km 137.000 except tiger corridor section at the risk and cost of contractor
Read moreBalance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for proper
Balance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for
Read moreJjm phase ii 6th slssc mallappally anicad kottangal panchayat laying balance distribution system and fhtcs in kottangal panchayat
Jjm phase ii 6th slssc mallappally anicad kottangal panchayat laying balance distribution system and fhtcs in kottangal panchayat
Read moreJjm phase ii 6th slssc mallappally anicad kottangal panchayats laying balance distribution system and providing fhtcs in mallappally panchayat.
Jjm phase ii 6th slssc mallappally anicad kottangal panchayats laying balance distribution system and providing fhtcs in mallappally panchayat
Read moreJjm- phase ii - wss to mallappally, anicad and kottangal (part) panchayt (perumpara scheme)-recast-construction of 2ll capacity ohsr at kunnanoli and s/l 100mm di k9 cwpm in kottangal panchayath
Jjm- phase ii - wss to mallappally, anicad and kottangal (part) panchayt (perumpara scheme)-recast-construction of 2ll capacity ohsr at kunnanoli and s/l 100mm di k9 cwpm in kottangal&#x0d panchayath.
Read moreof your Industry type