Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Under State Sector In Assembly Constituency Dhanaulti Block Jaunpur Of District Tehri Garhwal, Construction Work Of 12 Meter Span Single Lane Steel Plate Garder Motor Bridge In Km 03 Of Dhana Lagdasu Motor Road.
|
| Description |
Under State Sector In Assembly Constituency Dhanaulti Block Jaunpur Of District Tehri Garhwal, Construction Work Of 12 Meter Span Single Lane Steel Plate Garder Motor Bridge In Km 03 Of Dhana Lagdasu Motor Road.
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2024_pwd_78758_1 |
|
Reference Number |
2922/Nivida Date 07-12-2024 |
| Tender Fee | 4720 |
| EMD | 1.26 Lakh |
| Tender Value | - |
| Place | THATYUR |
| Link |
View Original Tender Notice
https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=93985 |
| Start Date | December 13, 2024 21:20 |
| End Date |
Expired
03/01/2025
Expired 653 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction work of 125m span 2-lane class-a loading motor bridge at km 35 of kamad dhauntari chamiyala budhakedar ayarkhal motor road (sh-73) in district tehri garhwal under epc mode
Construction work of 125m span 2-lane class-a loading motor bridge at km 35 of kamad dhauntari chamiyala budhakedar ayarkhal motor road (sh-73) in district tehri garhwal under epc mode
Read moreConstruction of 2-lane class-a loading motor bridges of span 42m and 36m and 1.5-lane class-a loading motor bridges of span 20m and 24m on various kms of lambgaon motana rajakhet ghansali sendul motor road (sh-69) in district tehri garhwal (epc)
Construction of 2-lane class-a loading motor bridges of span 42m and 36m and 1.5-lane class-a loading motor bridges of span 20m and 24m on various kms of lambgaon motana rajakhet ghansali sendul motor road (sh-69) in district tehri garhwal (epc)
Read moreRenovation of 02 no canals (bonga canal and kothiyada canal) damaged by motor roads in bhilangana block of district tehri garhwal under nabard
Renovation of 02 no canals (bonga canal and kothiyada canal) damaged by motor roads in bhilangana block of district tehri garhwal under nabard
Read moreConstruction of 66m span 2-lane class-a loading motor bridge at km-4 and 36m span 2-lane class-a loading motor bridge at km-6 of thalisain bhungidhar deghat manila dotiyal marchula motor road (sh-52) in district pauri garhwal under epc mode.
Construction of 66m span 2-lane class-a loading motor bridge at km-4 and 36m span 2-lane class-a loading motor bridge at km-6 of thalisain bhungidhar deghat manila dotiyal marchula motor road (sh-52) in district pauri garhwal under epc mode.
Read moreDesign and cost estimation for construction of single span 400 meter two lane class a loading motor bridge
Design and cost estimation for construction of single span 400 meter two lane class a loading motor bridge (design and drawing of bridge, vetting of design and drawing, preparation of dpr and forest proposal in distt. champawat uttarakhand india
Read moreConstruction of total six no. 2-lane class-a loading motor bridges of span 36m, 42m, 20m, 15m, 18m and 36m on various kms of marchula saraikhet baijro pokhra satpuli pauri motor road (sh 32) in district pauri garhwal under epc mode.
Construction of total six no. 2-lane class-a loading motor bridges of span 36m, 42m, 20m, 15m, 18m and 36m on various kms of marchula saraikhet baijro pokhra satpuli pauri motor road (sh 32) in district pauri garhwal under epc mode.
Read moreConstruction of 30 meter span (1.5 lane) p.s.c. girder bridge over bangla nala in ward no. 3 of gram sabha bhattowala, rishikesh constituency, dehradun district under the state sector.
Construction of 30 meter span (1.5 lane) p.s.c. girder bridge over bangla nala in ward no. 3 of gram sabha bhattowala, rishikesh constituency, dehradun district under the state sector.
Read moreUnder the state plan, construction of a damaged causeway and scupper, along with surface improvement using interlocking tiles over a 250-meter stretch, on the jyolikot-sadiyatal motor road within the nainital assembly constituency of nainital distri
Under the state plan, construction of a damaged causeway and scupper, along with surface improvement using interlocking tiles over a 250-meter stretch, on the jyolikot-sadiyatal motor road within the nainital assembly constituency of nainital distri
Read moreNew construction (hillside cutting) thangdhar thauldhar motor road dhanaulti constituency of ditt. tehri garhwal under state sector.
New construction (hillside cutting) thangdhar thauldhar motor road dhanaulti constituency of ditt. tehri garhwal under state sector.
Read moreRemaining work of construction of chemistry biology laboratory and children toilet room in g.i.c. dhanaulti block jaunpur tehri garhwal
Remaining work of construction of chemistry biology laboratory and children toilet room in g.i.c. dhanaulti. block jaunpur tehri garhwal
Read moreof your Industry type