Particulars | Details |
---|---|
Title |
Electrical Worksfor Upgradation Of Bio Fertilizer Quality Testing Laboratory
|
Description |
Electrical Works (Switch Board Complete Fittings Etc.) For Upgradation Of Bio Fertilizer Quality Testing Laboratory
|
Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
Tender Id | 2025_WBPWD_848553_1 |
Reference Number |
WBPWD/AE-ECSD/e-NIT-01/2025-26 |
Tender Fee | 0 |
EMD | 3285 |
Tender Value | |
Place | SARI Buildng |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1895032 |
Start Date | May 26, 2025 21:30 |
End Date |
03/06/2025 ( Expired 19 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply of hydraulic insulator testing jig for tensile load testing of 25kv porcelain and composite insulator as per rdso spec. no. ti/spc/ohe/instest/0090/(02/2009) rev o or latest.
For complete deion and other details, please refer to tender
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreDetailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Read moreUpgradation, improvement and augmentation of the existing 160 mld salauli water treatment plant upto 240 mld.
Upgradation, improvement and augmentation of the existing 160 mld salauli water treatment plant upto 240 mld.
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreSupply, installation, testing, commissioning and training of electrical, plumbing and fire protection works for 19 underground stations from madhavaram milk colony station to royapettah govt hospital
Station including bored tunnel between stations (ch 76.000 to ch 17250.000) for corridor 3 of chennai metro rail project phase ii.
Read moreRehabilitation and upgradation of armori to gadchiroli section of nh 353c from km 77-900 to 114-800 to four lane standards in the state of maharashtra on ham mode (length -36.900 km).
Rehabilitation and upgradation of armori to gadchiroli section of nh 353c from km 77-900 to 114-800 to four lane standards in the state of maharashtra on ham mode (length -36.900 km).
Read moreRehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).
Rehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).
Read moreRehabilitation and upgradation of shegaon to maharashtra-mp border section of nh 161g from km 55-000 to km 118-000 (length - 63.00 km) to 2lps configuration in the state of maharashtra on epc mode
Rehabilitation and upgradation of shegaon to maharashtra-mp border section of nh 161g from km 55-000 to km 118-000 (length - 63.00 km) to 2lps configuration in the state of maharashtra on epc mode
Read moreRehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Read moreof your Industry type