Tender Details
Particulars | Details |
---|---|
Title |
Fabrication Of Steel Racks 23 Nos. In West Section (15nos.) And Coal Section (08 Nos.) And Repairing Of Mast Support, Footstep, Cabin Repairing And Complete Painting Of Idm 30(2) Drill.
|
Description |
Fabrication Of Steel Racks 23 Nos. In West Section (15nos.) And Coal Section (08 Nos.) And Repairing Of Mast Support, Footstep, Cabin Repairing And Complete Painting Of Idm 30(2) Drill.
|
Organisation | Northern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_NCL_333588_1 |
Reference Number |
JNT/GM(Excv)/Etender/24-25/106 |
Tender Fee | 0 |
EMD | 6500 |
Tender Value | |
Place | Jayant Project |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345799 |
Start Date | April 01, 2025 15:00 |
End Date |
11/04/2025 ( Expired 10 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Offloading work to outside agency towards denting and repairing of operator cabin doors in 08 nos electric drills of dudhichua project
Offloading work to outside agency towards denting and repairing of operator cabin doors in 08 nos electric drills of dudhichua project
Read moreS/ f of 03 nos. water cooler with access, rep / exte of l.t. line, pole painting, tighte of over head line guardi repair of led street light, repa of 2 nos. high mast with old led flood light driver and inte elect in mandi office at nmy khalilabad
S/ f of 03 nos. water cooler with access, rep / exte of l.t. line, pole painting, tighte of over head line guardi repair of led street light, repa of 2 nos. high mast with old led flood light driver and inte elect in mandi office at nmy khalilabad
Read moreRepairing of led flood light for high mast 30 mtr. 03 nos. and repairing of led street light sf of led street light and cable laying main switch sf steel tubular pole 05 nos and reairing of lt line pole painting etc works at nmy meerut.
Repairing of led flood light for high mast 30 mtr. 03 nos. and repairing of led street light sf of led street light and cable laying main switch sf steel tubular pole 05 nos and reairing of lt line pole painting etc works at nmy meerut.
Read moreFabrication of steel racks 23 nos. in west section (15nos.) and coal section (08 nos.) and repairing of mast support, footstep, cabin repairing and complete painting of idm-30(2) drill.
Fabrication of steel racks 23 nos. in west section (15nos.) and coal section (08 nos.) and repairing of mast support, footstep, cabin repairing and complete painting of idm-30(2) drill.
Read moreDismantling, repairing and fitment of plummer block, yoke assly oscillation bush yoke centre and bush yoke material filling and finishing work of eyes and bush fitment work, mast supporting frame fabrication work in drill 840 of kdh project.
Dismantling, repairing and fitment of plummer block, yoke assly oscillation bush yoke centre and bush yoke material filling and finishing work of eyes and bush fitment work, mast supporting frame fabrication work in drill 840 of kdh project.
Read moreDenting and fitment of safety glasses of operator cabin in shovel and drills of east, west and coal section of jayant project.
Denting and fitment of safety glasses of operator cabin in shovel and drills of east, west and coal section of jayant project.
Read moreReplacement of complete under carriage both side and repairing and denting of operator cabin plate, damaged portion of cat walk cover repair of drill idm 30 sl. no. -1315 of bokaro ocp
Replacement of complete under carriage both side and repairing and denting of operator cabin plate, damaged portion of cat walk cover repair of drill idm 30 sl. no. -1315 of bokaro ocp
Read moreDisassembling, repairing, and assembling of complete pumps, model 10uph4 (kirloskar), sct 200/58-2 (kirloskar), and est 250200 (wilo), for non-monsoon operations in the coal section of dudhichua project.
Disassembling, repairing, and assembling of complete pumps, model 10uph4 (kirloskar), sct 200/58-2 (kirloskar), and est 250200 (wilo), for non-monsoon operations in the coal section of dudhichua project.
Read moreOffloading the work of repair and maintenance of air conditioning system fitted in operators cabin of 03 nos. epiroc idm 30 drill machines (sl no. 201306791 , 201306804 and 201306807 respectively ) of krishnashila project for period of 365 days.
Offloading the work of repair and maintenance of air conditioning system fitted in operators cabin of 03 nos. epiroc idm 30 drill machines (sl no. 201306791 , 201306804 and 201306807 respectively ) of krishnashila project for period of 365 days.
Read moreRepairing and complete overhauling of 2 nos dsm-3 kirloskar make pump for water supply to crusher and water tanker filling respectively and 2 nos dsm-4 pump assembly for water supply in hospital colony phase -ii w.r.t konar exp ,bnk area.
Repairing and complete overhauling of 2 nos dsm-3 kirloskar make pump for water supply to crusher and water tanker filling respectively and 2 nos dsm-4 pump assembly for water supply in hospital colony phase -ii w.r.t konar exp ,bnk area.
Read moreof your Industry type