Tender Details

Particulars Details
Title
Construction Of Cc Road From Tubel Of Narsingh To Till The Place Of Kali Mai Via Yadav Basti, Gram Sabha Amethi Pitch Road. (Length 650 M)
Description
Construction Of Cc Road From Tubel Of Narsingh To Till The Place Of Kali Mai Via Yadav Basti, Gram Sabha Amethi Pitch Road. (Length 650 M)&Amp#X0d
Organisation Director Cum Chief Engineer RED | State Govt. and UT
Tender Id 2025_REDUP_1044678_1
Reference
Number
99/RED/Cir Aza/Tender/25-26/dt 15.05.2025-1
Tender Fee 3082
EMD 73500
Tender Value
Place Azamgarh
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1896014
Start Date May 31, 2025 16:30
End Date

16/06/2025 ( Expired 19 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Consultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)

Consultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)

Read more
Construction of road kibithu kundao from km 0.000 to km 52.000 design length 0.000 to 19.557 kms green field alignment to nhsl specifications under project udayak in anjaw district of arunachal pradesh state on epc mode

Construction of road kibithu kundao from km 0.000 to km 52.000&#x0d design length 0.000 to 19.557 kms green field alignment to nhsl&#x0d specifications under project udayak in anjaw district of arunachal&#x0d pradesh state on epc mode&#x0d

Read more
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Read more
Construction of cc road from verma crane service to navab ali house in ambedkar ward betul

Construction of cc road from verma crane service to navab ali house in ambedkar ward betul

Read more
Construction of pcc road from main road to golerman saket house, harijan basti hi paschim ward no.31

Construction of pcc road from main road to golerman saket house, harijan basti hi paschim ward no.31

Read more
Construction of cc road at chuna bhatta and ashish singh to yadav ji house in ward no. 01 (councilor fund)

Construction of cc road at chuna bhatta and ashish singh to yadav ji house in ward no. 01 (councilor fund)

Read more
Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode

Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode

Read more
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Read more
Construction work of cc road from kunwar pal house to temple in harharpur majra palpur village (ujhani)

Construction work of cc road from kunwar pal house to temple in harharpur majra palpur village (ujhani)

Read more
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise