Tender Details
About Tender
📡 Procurement Bid: Flexible Rf Cables For Defence Use 🛡️ The Department Of Defence Research & Development, Ministry Of Defence, Is Seeking Bids For The Supply Of Flexible Rf Cables With Specific Lengths: 1. Flexible Rf Cable 1: 560mm 📶 2. Flexible Rf Cable 2: 470mm 📶 3. Flexible Rf Cable 3: 260mm 📶 Bid Submission Deadline: 14/05/2024, 9:00 Am ⏳ Interested Suppliers Must Provide Detailed Technical Specifications, Pricing, And Delivery Schedules To Meet The Stringent Requirements Of The Defence Sector. Keywords: Flexible Rf Cables, Defence Procurement, Rf Cables, Ministry Of Defence, Government Tender, Bid SubmissionParticulars | Details |
---|---|
Title |
Flexible Rf Cable 1, Length 560mm,Flexible Rf Cable 2, Length 470mm,Flexible Rf Cable 3, Length 260
|
Description |
|
Organisation | Department of Defence Research & Development | Ministry of Defence |
Tender Id | GEM/2024/B/4879185 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | April 22, 2024 20:17 |
End Date |
14/05/2024 ( Expired 391 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Prototype 1,prototype 2,prototype 3,prototype 4,prototype 5,bulk 1,bulk 2,bulk 3,bulk 4,bulk 5
Read more
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreImplementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreUpgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Read moreCable marker 1 point 5 sqmm 0 to 9,cable marker 1 point 5 sqmm a to z,cable marker 2 point 5 sqmm 0
Read more
Access control system_item 1,access control system_item 2,access control system_item 3,access contr
Read more
Title 1,title 2,title 3,title 4,title 5,title 6,title 7,title 8,title 9,title 10,title 11,title 12,
Read more
of your Industry type