Tender Details
Particulars | Details |
---|---|
Title |
Nhidcl/Ro Agt/T/Or/2023 24/731
|
Description |
Ordinary Repair Works 
Of Kumarghat To 
Kailashahar Section Of 
Nh208 From Existing 
Bypassed Ch 0000 
To 0800 Ch. 
18500 To 18700 
Ch.19100 To 
19500 Total 
Length 1.400 Km In 
The State Of Tripura In 
Fy 2023 24 2nd Call
|
Organisation | National Highways and Infrastructure Development Corporation | Central Govt. Ministry/Department |
Tender Id | 2024_NHIDC_789111_1 |
Reference Number |
NHIDCL/RO-Agt/T/OR/2023-24/731 |
Tender Fee | 11800 |
EMD | 41000 |
Tender Value | |
Place | Tripura |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=833093 |
Start Date | January 30, 2024 14:30 |
End Date |
09/02/2024 ( Expired 465 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Develop. of 6lane gf pkg-iia s from ch.23.325 to design ch. 32.090 around kanpur city (length 8.765 kms) in the state of uttar pradesh on epc mode (2nd call)
Develop. of 6lane gf pkg-iia s from ch.23.325 to design ch. 32.090 around kanpur city (length 8.765 kms) in the state of uttar pradesh on epc mode (2nd call)
Read moreIe services for supervision of 4-lane pathalgaon-kunkuri cg/jh border section of nh-43 ing from end point of nh-130a design ch. 00.000 to ch. 104.250 as part of raipur-dhanbad economic corridor under bmp (lot-5/pkg7) in chhattisgarh 2nd call
Ie services for supervision of 4-lane pathalgaon-kunkuri cg/jh border section of nh-43 ing from end point of nh-130a design ch. 00.000 to ch. 104.250 as part of raipur-dhanbad economic corridor under bmp (lot-5/pkg7) in chhattisgarh 2nd call
Read moreRehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Read moreRoutine maintenance including incident management for operation and maintenance of hyderabad-bangalore section-3 from km 377.000 to km 462.164 of nh 44 (total length 85.164 km) in the state of andhra pradesh
Routine maintenance including incident management for operation and maintenance of hyderabad-bangalore section-3 from km 377.000 to km 462.164 of nh 44 (total length 85.164 km) in the state of andhra pradesh
Read moreDevelopment of 4-laning of jagtial karimnagar section of nh-563 from ch.0.000 km (existing chainage 90-500 on nh-63) to ch.58.866 km (near sh-1 ch.170.400 km) at karimnagar bypass end (length 58.866 km) under nh (o) on ham in the state of telangana
Development of 4-laning of jagtial karimnagar section of nh-563 from ch.0.000 km (existing chainage 90-500 on nh-63) to ch.58.866 km (near sh-1 ch.170.400 km) at karimnagar bypass end (length 58.866 km) under nh (o) on ham in the state of telangana
Read more2nd call of strengthening and overlay of the existing jenjra to gopalpur section of nh 149b including construction of 3.5 m wide service road on bhs in chhuri town, part of up- gradation of champa-korba-chhuri-katghora section of nh-149b (package-2)
2nd call of strengthening ando verlay of the existing jenjra to gopalpur section of nh 149b including construction of 3.5 m wide service road on bhs in chhuri town, part of up- gradation of champa-korba-chhuri-katghora section of nh-149b package-2
Read moreStrengthening overlaying of four laning of chas-ramgarh section of nh-23 from km. 0.000 to km.21.110 and two laning (from existing ch. km. 55.900 design chainage 53.600 to km. 78.125 total length 43.335 km. on item rate percentage basis
Strengthening overlaying of four laning of chas-ramgarh section of nh-23 from km. 0.000 to km.21.110 and two laning (from existing ch. km. 55.900 design chainage 53.600 to km. 78.125 total length 43.335 km. on item rate percentage basis
Read morePreparation of dpr 2nd call for 4 laning of project from existing two lane with paved shoulder of bijapur gulbarga humnabad section of nh50 and 4 6 laning of project from tamilnadu karnataka border to bangalore section of nh948 in the state of karnat
Preparation of dpr 2nd call for 4 laning of project from existing two lane with paved shoulder of bijapur gulbarga humnabad section of nh50 and 4 6 laning of project from tamilnadu karnataka border to bangalore section of nh948 in the state of karnat
Read moreDevelopment of office premises with paver block to mitigate water logging and cover slab for existing drain at administrative building, malda located at rabindra avenue in the district of malda (2nd call)
Development of office premises with paver block to mitigate water logging and cover slab for&#x0d existing drain at administrative building, malda located at rabindra avenue in the district of&#x0d malda (2nd call)
Read moreConstruction of 4 lane with paved shoulders bypass to nalgonda town from design km 0.000 to km 14.000 length 14.00km existing ch km 18 710 to 28 685 of nakrekal to nagarjuna sagar section of nh 565 in the state of telangana on epc mode under annual
Construction of 4 lane with paved shoulders bypass to nalgonda town from design km 0.000 to km 14.000 length 14.00km existing ch km 18 710 to 28 685 of nakrekal to nagarjuna sagar section of nh 565 in the state of telangana on epc mode under annual
Read moreof your Industry type