Tender Details
Particulars | Details |
---|---|
Title |
Work Related To Installation Of High Gate To Pr Trafic Of Heavy Vehicles On Hindon River Bridge At Km 35 On Meerut Baraut (Sh No 119) In The Financial Year 2024 25 In Baghpat District.
|
Description |
Work Related To Installation Of High Gate To Pr Trafic Of Heavy Vehicles On Hindon River Bridge At Km 35 On Meerut Baraut (Sh No 119) In The Financial Year 2024 25 In Baghpat District.
|
Organisation | Cheif Engineer Meerut Zone PWD Meerut | State Govt. and UT |
Tender Id | 2025_CEMRT_1010691_1 |
Reference Number |
354/3A Date 29-01-2025 |
Tender Fee | 944 |
EMD | 2.29 Lakh |
Tender Value | |
Place | EE PD PWD BAGHPAT |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1819033 |
Start Date | March 01, 2025 19:30 |
End Date |
07/03/2025 ( Expired 45 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of hl rcc bridge (5x26.50m) in km 19 (kinjer) of nh 33 (old nh 110, km 71) in the district of arwal in the state of bihar for the year 2024 25 under nh divison gaya on epc mode
Construction of hl rcc bridge (5x26.50m) in km 19 (kinjer) of nh33 (old nh 110, km 71) in the district of arwal in the state of bihar for the year 2024 25 under nh divison gaya on epc mode
Read moreConstruction of h. l. bridge over river mahanadi at 25th km on narsinghpur baliput road in the district of cuttack for the year 2024-25
Construction of h. l. bridge over river mahanadi at 25th km on narsinghpur baliput road in the district of cuttack for the year 2024-25
Read moreConstruction of major bridge on pench river at on kothurna salai chargaon nawegaon neurwada bondri khumari lendazari road (sh-337) in km. 20/200 in taluka parseoni district nagpur (fourth call)
Construction of major bridge on pench river at on kothurna salai chargaon nawegaon neurwada bondri khumari lendazari road (sh-337) in km. 20/200 in taluka parseoni district nagpur (fourth call)
Read moreWork construction of bridge on aglad river in km 1 of satagard bend to gherachak dangasari ghuttu motor road in block jaunpur constituency dhanaulti district, t.g. under state sector (first phase work, design drawing, vetting, dpr preparation etc
Work construction of bridge on aglad river in km 1 of satagard bend to gherachak dangasari ghuttu motor road in block jaunpur constituency dhanaulti district, t.g. under state sector (first phase work, design drawing, vetting, dpr preparation etc
Read moreConstruction of foundation work at bridge over river hindon at sh-119 (meerut-baraut road in km-35) in dist. baghpat
Construction of foundation work at bridge over river hindon at sh-119 (meerut-baraut road in km-35) in dist. baghpat
Read moreConstruction of bridge(super structure) on kali river meerut-badaun marg (sh-18) urban area km-72 to 78 shikarpur bypass district bulandshahr
Construction of bridge(super structure) on kali river meerut-badaun marg (sh-18) urban area km-72 to 78 shikarpur bypass district bulandshahr
Read moreRenovation to the floor protection of the bridge over river angi at 13th km on b.m semla to p.s leading dabugam road in kosagumuda block of nabarangpur district (such as sheet piling cutoff, rigid and flexible apron etc.) for the year 2024-25
Renovation to the floor protection of the bridge over river angi at 13th km on b.m semla to p.s leading dabugam road in kosagumuda block of nabarangpur district (such as sheet piling cutoff, rigid and flexible apron etc.) for the year 2024-25
Read moreSinking of 5.50 mtr external diameter well work at bridge over river hindon at sh 119 meerut baraut road in km 35 in dist baghpat
Sinking of 5.50 mtr external diameter well work at bridge over river hindon at sh 119 meerut baraut road in km 35 in dist baghpat
Read morePeriodical maintenance on pali anupali road km 0/00 to 5/00 (sh providing and laying 25 mm. thick bituminous concrete single layer and hot applied thermoplastic in km. 3/00 to 5/000) amp for the year 2025-26 vr
Periodical maintenance on pali anupali road km 0/00 to 5/00 (sh providing and laying 25 mm. thick bituminous concrete single layer and hot applied thermoplastic in km. 3/00 to 5/000) amp for the year 2025-26 vr
Read moreConstruction of approaches to newly constructed major bridge in km 26th of nh-218 on gawai river in the state of jharkhnad for the year 2024-25
Construction of approaches to newly constructed major bridge in km 26th of nh-218 on gawai river in the state of jharkhnad for the year 2024-25
Read moreof your Industry type