Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Lane,R/Wall From Shabir Ahmad Khatana To Mir Mohd Khatana,Nazir Ahmad At Rabitar Bajipathri Watakulo
|
| Description |
Construction Of Lane,R/Wall From Shabir Ahmad Khatana To Mir Mohd Khatana,Nazir Ahmad At Rabitar Bajipathri Watakulo
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_RDPR_230188_19 |
|
Reference Number |
NIT_151 REW BUDGAM OF 2023-24 |
| Tender Fee | 200 |
| EMD | 5800 |
| Tender Value | |
| Place | Executive Engineer REW Budgam |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | September 18, 2023 14:30 |
| End Date |
Expired
25/09/2023
Expired 1034 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConstruction of lane,r/wall from shabir ahmad khatana to mir mohd khatana,nazir ahmad at rabitar bajipathri watakulo
Construction of lane,r/wall from shabir ahmad khatana to mir mohd khatana,nazir ahmad at rabitar bajipathri watakulo
Read moreConstruction of lane from nazir ahmad mir to lo ali mohd at avendgund
Construction of lane from nazir ahmad mir to lo ali mohd at avendgund
Read moreConstruction of lane from nazir ahmad mir to lo ali mohd at avendgund
Construction of lane from nazir ahmad mir to lo ali mohd at avendgund
Read moreConstruction of lane from nazir ahmad mir to lo ali mohd at avendgund
Construction of lane from nazir ahmad mir to lo ali mohd at avendgund
Read moreConstruction of lane from nazir ahmad mir to lo ali mohd at avendgund
Construction of lane from nazir ahmad mir to lo ali mohd at avendgund
Read moreof your Industry type