Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
AAAAAAAAAA Login to view |
Description |
Wbphed/Ae/Rsd/N Ie T 06/25 26 02
|
Organisation | PHE | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 29108 |
Tender Value | |
Place | Rampurhat, Birbhum |
Link |
AAAAAAAAAA Login to view |
Start Date | June 24, 2025 00:25 |
End Date |
22/07/2025 ( 28 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
AAAAAAAAAA
Login to viewEoi for empanelment of architects for various construction works in dr. b.r.ambedkar nit,jalandhar
Read moreReconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode
Reconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode
Read moreLandslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreSupply, installation and commissioning of active led display system at brahmaputra auditorium hall, assam water centre, including buyback of existing 25 numbers of 55 inch led-backlit lfd lcd panels
Supply, installation and commissioning of active led display system at brahmaputra auditorium hall, assam water centre, including buyback of existing 25 numbers of 55 inch led-backlit lfd lcd panels
Read moreAAAAAAAAAA
Login to viewDevelopment of&#x0d the approach&#x0d connectivity&#x0d towards the&#x0d filter media&#x0d stack yard and&#x0d the drainage&#x0d system along the&#x0d bisa-lakshmitala&#x0d area at&#x0d southern&#x0d alignment&#x0d within igwtp
Read moreAAAAAAAAAA
Login to viewSupplying and laying of 1100 mm diameter ms rising main from&#x0d heera marble and granite to hemanta mukhopadhyay metro&#x0d station (j-1 to j-3).
Read moreWbphed/ee/md/niet_21 (2nd call) of 2025-2026, sl. no.18
Augmentation of boundary wall of head work site of gazole zone-ii pipe water supply scheme at gazole dev. block under malda division, phe dte. in the district of malda. (2nd call)
Read moreWbphed/ee/md/niet_22 (3rd call) of 2025-2026, sl.no.08
Design, supplying, fabrication, erection and commissioning including 3 (three) months trial run of 35m3hr. capacity pressure type iron elimination plant with construction of blower room and backwash water disposal at head work site of akalpur
Read moreof your Industry type