Tender Details

Particulars Details
Title
Design Engineering Procurement Supply Construction And Commissioning Of Cumulative 7.5 Mw Grid Connecter Solar Power Plant With 5 Years Comprehensive Maintenance
Description
Design Engineering Procurement Supply Construction And Commissioning Of Cumulative 7.5 Mw Grid Connecter Solar Power Plant With 5 Years Comprehensive Maintenance
Organisation Directorate of Local Bos UP | State Govt. and UT
Tender Id 2025_DOLBU_1093144_1
Reference
Number
22-11-2025/NAGAR NIGAM LIGHT/08-12-2025/01
Tender Fee 29500
EMD 72.7 Lakh
Tender Value -
Place AGRA
Link
View Original Tender Notice

https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2008913

Start Date November 22, 2025 19:00
End Date
Expired 08/12/2025

Expired 309 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Reconditioning of 4 mw solar power plant installed at nmpa with 5 years comprehensive operation and maintenance contract

Reconditioning of 4 mw solar power plant installed at nmpa with 5 years comprehensive operation and maintenance contract

Read more
Selection of developer for design, engineering, supply, financing, procurement, installation, testing, commissioning, operation and maintenance of a grid connected 3 mw ac solar pv power plant integrated with a 1 mw 4 mwh battery energy storage sys

Selection of developer for design, engineering, supply, financing, procurement, installation, testing, commissioning, operation and maintenance of a grid connected 3 mw ac solar pv power plant integrated with a 1 mw 4 mwh battery energy storage sys

Read more
Comprehensive maint of 1.7 mw solar power plant at af stn tughlakabad under ge (af) tughlakabad

Comprehensive maint of 1.7 mw solar power plant at af stn tughlakabad under ge (af) tughlakabad

Read more
Design, fabrication and sitc of motorized sliding trolley gate including all inclusive comprehensive maintenance contract at srinagar international airport

Design, fabrication and sitc of motorized sliding trolley gate including all inclusive comprehensive maintenance contract at srinagar international airport

Read more
Design engineering, manufacture procurement, testing, supply, installation and commissioning of grid connected solar pv power plant of cumulative array capacity 315 kwp at calcutta pavlov hospital, kolkata,

Supply, installation and commissioning of grid connected solar pv power plant of cumulative array capacity 315 kwp at calcutta pavlov hospital, kolkata, west bengal, including 5 years comprehensive maintenance on turkey basis.

Read more
Design, engineering, supply, installation, testing and commissioning of environmental telemonitoring system in under ground mines of sccl with 03 years comprehensive annual maintenance contract after 02 years comprehensive warranty.

Design, engineering, supply, installation, testing and commissioning of environmental telemonitoring system in under ground mines of sccl with 03 years comprehensive annual maintenance contract after 02 years comprehensive warranty.

Read more
Survey, design, fabrication, supply, installation, testing and commissioning of total 34.33 kwp of on grid connected rooftop solar pvpower plant including comprehensive maintenance contract (cmc) for 3 years

Survey, design, fabrication, supply, installation, testing and commissioning of total 34.33 kwp of on grid connected rooftop solar pvpower plant including comprehensive maintenance contract (cmc) for 3 years

Read more
Survey, design, fabrication, supply, installation, testing and commissioning of total 10.00 kwp of on grid connected rooftop solar pvpower plant including comprehensive maintenance contract (cmc) for 3 years

Survey, design, fabrication, supply, installation, testing and commissioning of total 10.00 kwp of on grid connected rooftop solar pvpower plant including comprehensive maintenance contract (cmc) for 3 years

Read more
Providing fully comprehensive maintenance of 6 nos. of lifts, d.g. set and hydrant lines installed in ph-i, wadala truck terminal for three years

Providing fully comprehensive maintenance of 6 nos. of lifts, d.g. set and hydrant lines installed in ph-i, wadala truck terminal for three years

Read more
Development of 3 mw green hydrogen electrolyzers and refueling station with comprehensive operation and maintenance for a period of 7 years including two years guarantee period

Development of 3 mw green hydrogen electrolyzers and refueling station with comprehensive operation and maintenance for a period of 7 years including two years guarantee period

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise