Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Independent Engineer Services For Access Controlled Highway Of 4 Lane With Paved Shoulders From Walajapet Ranipet To Tn Ap Border Of Nh 40 In Tamil Nadu On Ham Under Nh(o) (Project Length 28.021 Km)
|
| Description |
Independent Engineer Services For Access Controlled Highway Of 4 Lane With Paved Shoulders From Walajapet Ranipet To Tn Ap Border Of Nh 40 In Tamil Nadu On Ham Under Nh(o) (Project Length 28.021 Km)
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2024_NHAI_209144_1 |
|
Reference Number |
TNDIV-21018/17/2024-Tamil Nadu Division-Part(1) |
| Tender Fee | 5000 |
| EMD | 0 |
| Tender Value | - |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=228705 |
| Start Date | September 24, 2024 17:45 |
| End Date |
Expired
09/01/2025
Expired 644 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Onm of nh30 old nh221 from ibrahimpatnam circle km.0.000) to ap telangana border km.70.190 of two lane with paved shoulders n four lane with paved shoulders in the state of andhra pradesh
Onm of nh30 old nh221 from ibrahimpatnam circle km.0.000) to ap telangana border km.70.190 of two lane with paved shoulders n four lane with paved shoulders in the state of andhra pradesh
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreUpgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
Upgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
Read moreWidening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)
Widening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)
Read moreUpgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode.
Upgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode.
Read moreUpgradation to 2 lane with paved shoulders of naliya narayan sarovar section from design km 220.773 to km 288.987 of nh 41 in the state of gujarat on epc mode.
Upgradation to 2 lane with paved shoulders of naliya narayan sarovar section from design km 220.773 to km 288.987 of nh 41 in the state of gujarat on epc mode.
Read moreUpgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Upgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Read moreUpgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.
Upgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.
Read moreBalance work of rehabilitation and up-gradation to 2 lane road with paved shoulders configuration for pacharal mandangad mhapral rajewadi section of nh-965dd upto junction of nh-66 ch 22700 m to ch 75100 m and ambadave connector spur connecting
Balance work of rehabilitation and up-gradation to 2 lane road with paved shoulders configuration for pacharal mandangad mhapral rajewadi section of nh-965dd upto junction of nh-66 ch 22700 m to ch 75100 m and ambadave connector spur connecting
Read moreConsultancy services for authoritys engineer for upgradation to 2 -lane with paved shoulders from km. 220.773 to 288.987 (naliya-narayan sarovar stretch) of nh-41 in the state of gujarat on epc mode
Consultancy services for authoritys engineer for upgradation to 2 -lane with paved shoulders from km. 220.773 to 288.987 (naliya-narayan sarovar stretch) of nh-41 in the state of gujarat on epc mode
Read moreof your Industry type