Tender Details
Particulars | Details |
---|---|
Title |
Rehabilitation Of Railway Over Bridge At Rayagada From Ch.202.175 To Km.202.790 And Nagavali River Bridge From Km.192.797 To Km.193.050 Of Nh 326 Under Item Rate Contract In The State Of Odisha
|
Description |
Rehabilitation Of Railway Over Bridge At Rayagada From Ch.202.175 To Km.202.790 And Nagavali River Bridge From Km.192.797 To Km.193.050 Of Nh 326 Under Item Rate Contract In The State Of Odisha
|
Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
Tender Id | 2024_MoRTH_838551_1 |
Reference Number |
15 /CCE NH, SOUTH of 2024-25 |
Tender Fee | 12000 |
EMD | 6.36 Lakh |
Tender Value | |
Place | Rayagada |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=881382 |
Start Date | December 09, 2024 16:30 |
End Date |
30/12/2024 ( Expired 111 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for ae for supervision of rehabilitation and up-gradation from design ch km 35.300 to km 65.740 of nh-166g (gaganbawada to kale) to 2lps in the state of maharashtra on epc mode
Consultancy services for ae for supervision of rehabilitation and up-gradation from design ch km 35.300 to km 65.740 of nh-166g (gaganbawada to kale) to 2lps in the state of maharashtra on epc mode.
Read moreRenewal of the wearing surface of the road pavement from km 368.147 to km 421.196 of dindigul - samayanallur section of nh-44 in the state of tamil nadu on item rate basis at the risk and cost of concessionaire
Renewal of the wearing surface of the road pavement from km 368.147 to km 421.196 of dindigul - samayanallur section of nh-44 in the state of tamil nadu on item rate basis at the risk and cost of concessionaire
Read moreConstruction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Read morePerformance based maintenance contract (pbmc) estimate from km. 59/000 to 59/921 , 0/000 to 1/600 (temple link) of nh- 316 badadanda, puri and from km. 59/921 to 90/200 (puri-konark link) and from km. 0/000 to 28/500 (puri-satapada link) in odisha
Performance based maintenance contract (pbmc) estimate from km. 59/000 to 59/921 , 0/000 to 1/600 (temple link) of nh- 316 badadanda, puri and from km. 59/921 to 90/200 (puri-konark link) and from km. 0/000 to 28/500 (puri-satapada link) in odisha
Read moreReconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Reconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreIe for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode
Ie for development of 4 lane economic corridor from before mayurakshi bridge approach to moregram section km 180.000 to km 230.957 of nh 116a (package 5) in the state of west bengal under bharatmala pariyojana on hybrid annuity mode
Read moreIe services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham
Ie services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham
Read moreShort term maintenance contract (stmc) estimate from km. 35.00 to km. 38.00, from km. 45.00 to 50.00 km. and from km. 60.00 to 65.00 of nh 326a in the state of odisha for the year 2024-25.
Short term maintenance contract (stmc) estimate from km. 35.00 to km. 38.00, from km. 45.00 to 50.00 km. and from km. 60.00 to 65.00 of nh 326a in the state of odisha for the year 2024-25.
Read moreMonsoon preparedness works and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iv from chauntra at km. 140.625 to padhar at km. 180.000 in the state of himachal pradesh on item rate percentage
Monsoon preparedness works and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iv from chauntra at km. 140.625 to padhar at km. 180.000 in the state of himachal pradesh on item rate percentage
Read moreof your Industry type