Tender Details

Particulars Details
Title
Installation Of 150k W Gear Box, 200k W Motor With All Electricals In 19 Xd Tandem Belt, Tsu At 38 L Substation, Ac Bs At 19 Xd, 8 D Belt Conveyors At 3n4 Incline Ug Of Jhanjra Project Colliery
Description
Installation Of 150k W Gear Box, 200k W Motor With All Electricals In 19 Xd Tandem Belt, Tsu At 38 L Substation, Ac Bs At 19 Xd, 8 D Belt Conveyors At 3n4 Incline Ug Of Jhanjra Project Colliery
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_ECL_317078_1
Reference
Number
ECL/GM/JNR/EnM/A2/24-25/60 dated 05.09.2024
Tender Fee 0
EMD 3400
Tender Value -
Place JHANJRA UNDERGROUND
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=328611

Start Date September 14, 2024 16:30
End Date
Expired 24/09/2024

Expired 709 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Transportation, installation, necessary fabrication, commissioning, trail run including extension of 80ltandem belt conveyor (8d to 19d) in rviia seam of 3n4 incline under jhanjra area.

Transportation, installation, necessary fabrication, commissioning, trail run including extension of 80ltandem belt conveyor (8d to 19d) in rviia seam of 3n4 incline under jhanjra area.

Read more
Transportation, installation, necessary fabrication, commissioning, trail run including extension of 80ltandem belt conveyor (8d to 19d) in rviia seam of 3n4 incline under jhanjra area.

Transportation, installation, necessary fabrication, commissioning, trail run including extension of 80ltandem belt conveyor (8d to 19d) in rviia seam of 3n4 incline under jhanjra area.

Read more
Transportation, installation, necessary fabrication, commissioning, trail run including extension of 80ltandem belt conveyor (8d to 19d) in rviia seam of 3n4 incline under jhanjra area

Transportation, installation, necessary fabrication, commissioning, trail run including extension of 80ltandem belt conveyor (8d to 19d) in rviia seam of 3n4 incline under jhanjra area

Read more
Strengthening of 1000mm wide 19xd belt conveyor in lhcm-2 section of r-vii seam at 3n4 incline, j.p.colly.

Strengthening of 1000mm wide 19xd belt conveyor in lhcm-2 section of r-vii seam at 3n4 incline, j.p.colly.

Read more
Strengthening of 1000mm wide -8d belt conveyor in lhcm-2 section of r-vii seam at 3n4 incline, j.p.colly.

Strengthening of 1000mm wide -8d belt conveyor in lhcm-2 section of r-vii seam at 3n4 incline, j.p.colly.

Read more
Rubber lagging 20 mm thick at site of different belt conveyors of mic and 3n4 incline, jhanjra project colliery.

Rubber lagging 20 mm thick at site of different belt conveyors of mic and 3n4 incline, jhanjra project colliery.

Read more
Transportation and placing of three nos complete 6.6kv/550v ug substations at 75l /(9d-8d) ,(18xd- 19xd)/45l in rvii seam and 78l/(-11d)-(-10d) in rviia seam in 3n4 incline unit,jpc

Transportation and placing of three nos complete 6.6kv/550v ug substations at 75l /(9d-8d) ,(18xd- 19xd)/45l in rvii seam and 78l/(-11d)-(-10d) in rviia seam in 3n4 incline unit,jpc

Read more
Replacement of two nos belt conveyor motor at 74al, -8l belt conveyor, two nos er running at 65l,72l belt conveyor at 3n4 incline ug of jhanjra project colliery

Replacement of two nos belt conveyor motor at 74al, -8l belt conveyor, two nos er running at 65l,72l belt conveyor at 3n4 incline ug of jhanjra project colliery

Read more
Heightening, proper grading aligning of foot stool structure of 1000mm wide 19xd t belt conveyor in lhcm-2 section of r-vii seam at 3n4 incline, j.p.colly

Heightening, proper grading aligning of foot stool structure of 1000mm wide 19xd t belt conveyor in lhcm-2 section of r-vii seam at 3n4 incline, j.p.colly

Read more
Strengthening of 19xd tandem belt conveyor by fabrication of fixed unit of loop take up, installing gear coupling, also strengthening of 65l belt conveyor by installation of discharge drum of 65l belt conveyor at 3n4 incline, j.p.colly.

Strengthening of 19xd tandem belt conveyor by fabrication of fixed unit of loop take up, installing gear coupling, also strengthening of 65l belt conveyor by installation of discharge drum of 65l belt conveyor at 3n4 incline, j.p.colly.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise