Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Strengthening Of 19 Xd Tandem Belt Conveyor By Fabrication Of Fixed Unit Of Loop Take Up, Installing Gear Coupling, Also Strengthening Of 65 L Belt Conveyor By Installation Of Discharge Drum Of 65 L Belt Conveyor At 3n4 Incline, J.P.Colly.
|
| Description |
Strengthening Of 19 Xd Tandem Belt Conveyor By Fabrication Of Fixed Unit Of Loop Take Up, Installing Gear Coupling, Also Strengthening Of 65 L Belt Conveyor By Installation Of Discharge Drum Of 65 L Belt Conveyor At 3n4 Incline, J.P.Colly.
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_ECL_310644_1 |
|
Reference Number |
ECL/GM/JNR/EnM/A2/24-25/37 dated 12.06.2024 |
| Tender Fee | 0 |
| EMD | 4300 |
| Tender Value | |
| Place | JHANJRA UNDERGROUND |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=321879 |
| Start Date | June 18, 2024 16:30 |
| End Date |
Expired
28/06/2024
Expired 706 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Strengthening of 74al belt conveyor by fabrication of fixed unit of loop take up, installing gear coupling at 3n4 incline, j.p.colly.
Strengthening of 74al belt conveyor by fabrication of fixed unit of loop take up, installing gear coupling at 3n4 incline, j.p.colly.
Read moreReplacement of two nos. out of order gear coupling and fixed-unit drum at incline 2nd belt conveyor at 3n4 incline, j.p.colly.
Replacement of two nos. out of order gear coupling and fixed-unit drum at incline 2nd belt conveyor at 3n4 incline, j.p.colly.
Read moreStrengthening of 15xd tandem belt conveyor at lhcm-1, r-viia seam, 3n4 incline, j.p.colly.
Strengthening of 15xd tandem belt conveyor at lhcm-1, r-viia seam, 3n4 incline, j.p.colly.
Read moreStrengthening of 1000mm wide 19xd belt conveyor in lhcm-2 section of r-vii seam at 3n4 incline, j.p.colly.
Strengthening of 1000mm wide 19xd belt conveyor in lhcm-2 section of r-vii seam at 3n4 incline, j.p.colly.
Read moreInstallation of gear coupling, installation of top bottom rollers, striking plate of 1000mm wide 19xd belt conveyor in lhcm-2 section of r-vii seam at 3n4 incline, j.p.colly.
Installation of gear coupling, installation of top bottom rollers, striking plate of 1000mm wide 19xd belt conveyor in lhcm-2 section of r-vii seam at 3n4 incline, j.p.colly.
Read moreStrengthening of 72l belt conveyor at lhcm-1, r-viia seam, 3n4 incline, j.p.colly
Strengthening of 72l belt conveyor at lhcm-1, r-viia seam, 3n4 incline, j.p.colly
Read moreReplacement of one no. drive drum, one no. fixed unit drum and one no. discharge drum at 15xd tandem belt conveyor of lhcm-1, r-viia seam at 3n4 incline, j.p.colliery.
Replacement of one no. drive drum, one no. fixed unit drum and one no. discharge drum at 15xd tandem belt conveyor of lhcm-1, r-viia seam at 3n4 incline, j.p.colliery.
Read moreInstallation of one no. drive drum, one no. driven drum and one no. loop take-up drum at 80l belt conveyor of lhcm-1, r-viia seam at 3n4 incline, j.p.colliery
Installation of one no. drive drum, one no. driven drum and one no. loop take-up drum at 80l belt conveyor of lhcm-1, r-viia seam at 3n4 incline, j.p.colliery
Read moreInstallation of 150kw gear box, 200kw motor with all electricals in 19xd tandem belt, tsu at 38l substation, acbs at 19xd,-8d belt conveyors at 3n4 incline ug of jhanjra project colliery
Installation of 150kw gear box, 200kw motor with all electricals in 19xd tandem belt, tsu at 38l substation, acbs at 19xd,-8d belt conveyors at 3n4 incline ug of jhanjra project colliery
Read moreStrengthening of -11d(2nd) and -11d 3rd belt conveyor at lhcm 1, r viia seam, 3n4 incline, j.p.colly.
Strengthening of -11d(2nd) and -11d 3rd belt conveyor at lhcm 1, r viia seam, 3n4 incline, j.p.colly.
Read moreof your Industry type