Tender Details

Particulars Details
Title
Supply &Amp Application Of Composite High Voltage Insulation Coating On Betwa River Girder Bridge In Vglj Mkp &Amp Vglj Cnb Section, Sank River Girder Bridge &Amp Asan River Girder Bridge In Vglj Dho Section Of Jhansi Division
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 83813524
Reference
Number
JHS-TD-TENDER-2025-05
Tender Fee 0
EMD 3.47 Lakh
Tender Value -
Place Allahabad
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/092025/83813524/viewNitPdf_5083937.pdf

Start Date August 30, 2025 22:02
End Date
Expired 24/09/2025

Expired 387 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Dnit for construction of 180.0 m (04 span 45.0 m each) steel composite girder bridge over satluj river at km 3/000 on link road chandpur bela in district roopnagar (work code sasn 2026-75)

Dnit for construction of 180.0 m (04 span 45.0 m each) steel composite girder bridge over satluj river at km 3/000 on link road chandpur bela in district roopnagar (work code sasn 2026-75)

Read more
Ssi, design and const of 55 m major pmt bridge with open foundation and psc box girder superstructure proposed over pareng khola river at km 23.980,excluding approaches on road chalsa-jaldhaka-bindu-barrage under 87 rcc/764tf under (p) swtk state wb

Ssi, design and const of 55 m major pmt bridge with open foundation and psc box girder superstructure proposed over pareng khola river at km 23.980,excluding approaches on road chalsa-jaldhaka-bindu-barrage under 87 rcc/764tf under (p) swtk state wb

Read more
Ssi, design and constr of 60 m major pmt bridge with open foundation and psc box girder superstructure proposed over jhalong khola river at km 23.20, excluding approaches on road chalsa-jaldhaka-bindu-barrage under 87 rcc/764tf (p) swtk in state w b

Ssi, design and constr of 60 m major pmt bridge with open foundation and psc box girder superstructure proposed over jhalong khola river at km 23.20, excluding approaches on road chalsa-jaldhaka-bindu-barrage under 87 rcc/764tf (p) swtk in state w b

Read more
Construction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway

Construction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway

Read more
Construction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway

Construction of foundation, substructure and superstructure of important bridge no. 18 comprising 4 x 30.5 m + 3 x 45.70 m + 2 x 30.50 m + 2 x 45.70 m + 4 x 30.50 m open web girder spans, including pile foundation and 800 m approaches, for single-line railway track conforming to rdso 25 t axle load standard and substructure designed for 32.5 t loading over river barakar between barakar and kumardubi stations from km 229/30 to km 230/16 (f/hwh), of eastern railway

Read more
Construction of road from tsarak dho to ralakung , including 1 x 60 mtr span steel girder bridge on river zanskar at tsarak dho and 1x30mtr span steel girder bridge at palam chowk near ralakung village by way of design / supply / fabrication

Construction of road from tsarak dho to ralakung , including 1 x 60 mtr span steel girder bridge on river zanskar at tsarak dho and 1x30mtr span steel girder bridge at palam chowk near ralakung village by way of design / supply / fabrication

Read more
C/o rcc girder bridge over lorr river (16.50 m)

Sub structure, super structure earth work, , etc

Read more
C/o rcc bridge with bug girder span 1x55m over drum river

Jungle clearance, foundation, substructure, superstructure, river training work

Read more
Construction of submersible bridge on tarsama garhi road near sangam of kunwari river and asan river near tarsama village dist. morena

Construction of submersible bridge on tarsama garhi road near sangam of kunwari river and asan river near tarsama village dist. morena

Read more
Construction of rcc girder bridge span 20m at chainage 3260 over bungku river

Foundation, sub structure , super structure, protection work, bridge approach and logo

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise