Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Transporting Of 12/13 Mtrs. Tubular Pipe Pole To Be Used For Di Of 11 Kv Overhead Line As Well As 3.3 Kv Overhead Line Of Amal. Joyrampur Colliery Under Lodna Area.
|
| Description |
Transporting Of 12/13 Mtrs. Tubular Pipe Pole To Be Used For Di Of 11 Kv Overhead Line As Well As 3.3 Kv Overhead Line Of Amal. Joyrampur Colliery Under Lodna Area.
|
| Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
| Tender Id | 2025_BCCL_341118_1 |
|
Reference Number |
BCCL/LA/EnM/F-19/25-26/030 |
| Tender Fee | 0 |
| EMD | 576 |
| Tender Value | - |
| Place | Lodna Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=353607 |
| Start Date | August 08, 2025 15:30 |
| End Date |
Expired
20/08/2025
Expired 419 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing of damaged steel tubular poles of various heights used for lighting purpose and overhead power line erection
Repairing of damaged steel tubular poles of various heights used for lighting purpose and overhead power line erection
Read moreAnnual maintenance of different 11 kv ht incoming and differernt 3.3 kv ht outgoing overhead power lines of jocp for a period of 12 months alongwith the renovation of lightning protection system of main substation, laiyo substation and mines at
Annual maintenance of different 11 kv ht incoming and differernt 3.3 kv ht outgoing overhead power lines of jocp for a period of 12 months along with the renovation of lightning protection system of main substation, laiyo substation and mines at
Read moreDay-to-day work of dismantling, erection, and maintenance of 11 kv, 3.3 kv, and lt overhead lines, including dismantling and erection of light fittings mounted on poles, structures, and high mast towers, etc., at the surface area of ananta ocp, ja.
Day-to-day work of dismantling, erection, and maintenance of 11 kv, 3.3 kv, and lt overhead lines, including dismantling and erection of light fittings mounted on poles, structures, and high mast towers, etc., at the surface area of ananta ocp, ja.
Read moreTransporting of 120 lbs rail pole 12/13 mtrs to be used for di of 11 kv overhead line at amal. joyrampur colliery under lodna area.
Transporting of 120 lbs rail pole 12/13 mtrs to be used for di of 11 kv overhead line at amal. joyrampur colliery under lodna area.
Read moreErection and commissioning of 11 kv overhead line from bagdigi colliery to joyrampur ocp patch-d of amal. joyrampur under lodna area.
Erection and commissioning of 11 kv overhead line from bagdigi colliery to joyrampur ocp patch-d of amal. joyrampur under lodna area.
Read moreErection and commissioning of 11 kv overhead line from jealgora section-ii to bhuidhibanth colony (approx.length 200 mtrs) of amal. joyrampur colliery under lodna area.
Erection and commissioning of 11 kv overhead line from jealgora section-ii to bhuidhibanth colony (approx.length 200 mtrs) of amal. joyrampur colliery under lodna area.
Read moreRepairing of 11 kv overhead line of joyrampur from 3 pit sub-station to 5 pit sub-station of amal. joyrampur colliery under lodna area.
Repairing of 11 kv overhead line of joyrampur from 3 pit sub-station to 5 pit sub-station of amal. joyrampur colliery under lodna area.
Read moreErection of 20 nos. pipe pole and 950 mtrs overhead conductor of 3 wire 3.3 kv from sub-station at 6 no. bararee to pumping site at d-patch of amal. joyrampur colliery under lodna area.
Erection of 20 nos. pipe pole and 950 mtrs overhead conductor of 3 wire 3.3 kv from sub-station at 6 no. bararee to pumping site at d-patch of amal. joyrampur colliery under lodna area.
Read moreErection and commissioning of 11 kv overhead line (approx length 350 meter) at bagdigi colliery of amal. joyrampur colliery under lodna area.
Erection and commissioning of 11 kv overhead line (approx length 350 meter) at bagdigi colliery of amal. joyrampur colliery under lodna area.
Read moreRepairing of 01(one) no. dol starter 3.3 kv 400 amps mine line make controlling of joyrampur patch pump-motor system of amal. joyrampur under lodna area( htsd and local id.no. bccl/joy/3.3 kv/400 a/01 )
Repairing of 01(one) no. dol starter 3.3 kv 400 amps mine line make controlling of joyrampur patch pump-motor system of amal. joyrampur under lodna area( htsd and local id.no. bccl/joy/3.3 kv/400 a/01 )
Read moreof your Industry type