Tender Details

Particulars Details
Title
Balance Work Of In Up M/L Newly Constructed )Between Bdc Mug Including Bdc Mug Station Yard And Bdc Nh Branch Line With Other Ancillary Works Under Sse/P.Way/Bdc And Balance Work In Connection With Handing Over &Amp Taking Over Of 3rd Line Between Mug Khn From Km. 45/9 11 To Km 54/9 11 (8.94 Km) [Works Portion]
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 78265567
Reference
Number
244_2024-25
Tender Fee 0
EMD 4 Lakh
Tender Value -
Place Kolkata
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/112024/78265567/viewNitPdf_4762351.pdf

Start Date November 05, 2024 00:25
End Date
Expired 27/11/2024

Expired 689 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Cladding work over fractured hill between ab#6 to ab#9, construction of boulder trap beside penstock and repair of stair from ab#5 to valve house at sewa -ii power station (cw-748)

Cladding work over fractured hill between ab#6 to ab#9, construction of boulder trap beside penstock and repair of stair from ab#5 to valve house at sewa -ii power station (cw-748)

Read more
(i) construction of new lhs in lieu of lc gate no. 18/4 at km 88/7-9 in bdc - kwae section under aen/kwae. (ii)construction of lhs in lieu of lc gate no. 18/6/c/e at km 89/21-23 and 89/24-22 (dn) in between station ptae-agae in bb loop under aen/kwae.(iii) construction of new lhs in lieu of lc gate no. 18/7/c/e at km 91/7-9 in bdc - kwae section under aen/kwae

(i) construction of new lhs in lieu of lc gate no. 18/4 at km 88/7-9 in bdc - kwae section under aen/kwae. (ii)construction of lhs in lieu of lc gate no. 18/6/c/e at km 89/21-23 and 89/24-22 (dn) in between station ptae-agae in bb loop under aen/kwae.(iii) construction of new lhs in lieu of lc gate no. 18/7/c/e at km 91/7-9 in bdc - kwae section under aen/kwae

Read more
Construction of 2-lane end-to-end robs with reinforced earth wall (re wall) approaches, psc girder viaducts and rdso s camel back truss girder over the railway portion including lhs in lieu of level crossing nos. 245/b1 [km 630/9-10 between mankapur-jhilahi] and 318 spl [km 742/3-4 between jahangirabad-barabanki] in lucknow division of north eastern railway

Construction of 2-lane end-to-end robs with reinforced earth wall (re wall) approaches, psc girder viaducts and rdso s camel back truss girder over the railway portion including lhs in lieu of level crossing nos. 245/b1 [km 630/9-10 between mankapur-jhilahi] and 318 spl [km 742/3-4 between jahangirabad-barabanki] in lucknow division of north eastern railway

Read more
Jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material suppl

Jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material suppl

Read more
P.way maintenance of newly handed over gauge con section between jjp-mhrl.

For complete deion and other details, please refer to tender

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise