Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Balance Work Of In Up M/L Newly Constructed )Between Bdc Mug Including Bdc Mug Station Yard And Bdc Nh Branch Line With Other Ancillary Works Under Sse/P.Way/Bdc And Balance Work In Connection With Handing Over &Amp Taking Over Of 3rd Line Between Mug Khn From Km. 45/9 11 To Km 54/9 11 (8.94 Km) [Works Portion]
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 78265567 |
|
Reference Number |
244_2024-25 |
| Tender Fee | 0 |
| EMD | 4 Lakh |
| Tender Value | - |
| Place | Kolkata |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/112024/78265567/viewNitPdf_4762351.pdf |
| Start Date | November 05, 2024 00:25 |
| End Date |
Expired
27/11/2024
Expired 689 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Cladding work over fractured hill between ab#6 to ab#9, construction of boulder trap beside penstock and repair of stair from ab#5 to valve house at sewa -ii power station (cw-748)
Cladding work over fractured hill between ab#6 to ab#9, construction of boulder trap beside penstock and repair of stair from ab#5 to valve house at sewa -ii power station (cw-748)
Read more(i) construction of new lhs in lieu of lc gate no. 18/4 at km 88/7-9 in bdc - kwae section under aen/kwae. (ii)construction of lhs in lieu of lc gate no. 18/6/c/e at km 89/21-23 and 89/24-22 (dn) in between station ptae-agae in bb loop under aen/kwae.(iii) construction of new lhs in lieu of lc gate no. 18/7/c/e at km 91/7-9 in bdc - kwae section under aen/kwae
(i) construction of new lhs in lieu of lc gate no. 18/4 at km 88/7-9 in bdc - kwae section under aen/kwae. (ii)construction of lhs in lieu of lc gate no. 18/6/c/e at km 89/21-23 and 89/24-22 (dn) in between station ptae-agae in bb loop under aen/kwae.(iii) construction of new lhs in lieu of lc gate no. 18/7/c/e at km 91/7-9 in bdc - kwae section under aen/kwae
Read moreConstruction of 2-lane end-to-end robs with reinforced earth wall (re wall) approaches, psc girder viaducts and rdso s camel back truss girder over the railway portion including lhs in lieu of level crossing nos. 245/b1 [km 630/9-10 between mankapur-jhilahi] and 318 spl [km 742/3-4 between jahangirabad-barabanki] in lucknow division of north eastern railway
Construction of 2-lane end-to-end robs with reinforced earth wall (re wall) approaches, psc girder viaducts and rdso s camel back truss girder over the railway portion including lhs in lieu of level crossing nos. 245/b1 [km 630/9-10 between mankapur-jhilahi] and 318 spl [km 742/3-4 between jahangirabad-barabanki] in lucknow division of north eastern railway
Read moreJeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material suppl
Jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material suppl
Read more(i)balance work in up m/l (newly constructed) between bdc-mug including bdc-mug station yard and bdc-nh branch line with other ancillary work under aden/bdc & (ii) balance work in connection with handing over & taking over of 3rd line between mug-khn from km. 45/9-11 to km 54/9-11 (8.94 km) [p.way portion]
For complete deion and other details, please refer to tender
Read moreP.way maintenance work (p.way) of sse/p.way/pda under aen/bdc between khn and plae km 55/00 to 90/800
For complete deion and other details, please refer to tender
Read moreP.way maintenance work (p.way) of sse/p.way/pda under aen/bdc between khn and plae km 55/00 to 90/800
For complete deion and other details, please refer to tender
Read moreP.way maintenance work under sse/p.way/tbae under aen/ndae between bdc-kwae b. b. loop km 2/00 to 46/00.
For complete deion and other details, please refer to tender
Read moreP.way maintenance of newly handed over gauge con section between jjp-mhrl.
For complete deion and other details, please refer to tender
Read moreGadag-hotgi doubling project: balance left over works between gadag - wandal stations (composite work).
For complete deion and other details, please refer to tender
Read moreof your Industry type