Tender Details
Particulars | Details |
---|---|
Title |
Balance Work Of Track Linking And Associated P.Way Works Between Hinauta Ramban (Km 1200) Baghai Road Turki Road (Km 1218) Including P.Way Works In Yards In Connection With Satna Rewa Doubling Work
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 76385708 |
Reference Number |
DYCEC1REWA-10-2024 |
Tender Fee | 0 |
EMD | 3.74 Lakh |
Tender Value | |
Place | Jabalpur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/082024/76385708/viewNitPdf_4651018.pdf |
Start Date | July 25, 2024 21:11 |
End Date |
21/08/2024 ( Expired 274 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of balance road work in connection with civil and structural works for 5th stream alumina refinery of national aluminium company limited at damanjodi, orissa and related facilities at vishakhapatnam port, ap
Construction of balance road work in connection with civil and structural works for 5th stream alumina refinery of national aluminium company limited at damanjodi, orissa and related facilities at vishakhapatnam port, ap
Read moreEstimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Read moreGeneral- fdr (sr) works-construction of cc drain in between 6/700 to 6/900 and reconstruction of culvert at mulloorkkara varavoor road km 6/895-general civil work
General- fdr (sr) works-construction of&#x0d cc drain in between 6/700 to 6/900 and&#x0d reconstruction of culvert at mulloorkkara&#x0d varavoor road km 6/895-general civil work
Read moreBalance work for providing street light arrangement, in connection with upgradation of road network at eastern side of dock basin of haldia dock complex, smpk and comprehensive maintenance of complete arrangement for 05years.
Balance work for providing street light arrangement, in connection with upgradation of road network at eastern side of dock basin of haldia dock complex, smpk and comprehensive maintenance of complete arrangement for 05years.
Read moreSouth central railway construction organization-engineering, procurement and construction (epc) contract for doubling of track between manyamkonda station (excl)& perur station(incl) from km 128.200 to km 156.700(28.500 km) including electrification & signaling works in connection with doubling of mahabubnagar-dhone section in the state of telangana.
For complete deion and other details, please refer to tender
Read moreConstruction of balance new service road mnb culverts drain vup-lvup-svup and its work km 656.000-km725.185 of rewa katni jabalpur section (p-1) and from km 725.185-km774.068 and km793.065-km813.257 (p-2) of nh-30 in the state of mp on epc mode
Construction of balance new service road mnb culverts drain vup-lvup-svup and its work km 656.000-km725.185 of rewa katni jabalpur section (p-1) and from km 725.185-km774.068 and km793.065-km813.257 (p-2) of nh-30 in the state of mp on epc mode
Read moreProviding bc works to puthentheru vellachal road km 0/000 to km 4/400 and road raising and other improvement work to athanikkal theyyala road between 0/000 to 0/600 km, vailathur kozhichena road between 0/000 to 0/200 km in tanur lac
General rp work 2025_26 providing bc works to puthentheru vellachal road km 0/000 to km 4/400 and road raising and other improvement work to athanikkal theyyala road between 0/000 to 0/600 km, vailathur kozhichena road between 0/000 to 0/200 km in ta
Read morePreparation of detailed project report in connection with up gradation of the road from bungkulung to ambotia fatak for length of 16.50 km along with road safety and protective works
Preparation of detailed project report in connection with up gradation of the road from bungkulung to ambotia fatak for length of 16.50 km along with road safety and protective works
Read moreExecution of earthwork in formation, construction of minor bridges, blanketing, p. way linking works including supply of p-way fittings, track ballast, psc sleeper and points and crossings in connection with construction of railway infrastructure for
Execution of earthwork in formation, construction of minor bridges, blanketing, p. way linking works including supply of p-way fittings, track ballast, psc sleeper and points and crossings in connection with construction of railway infrastructure for
Read moreExecution of earthwork in formation, construction of minor bridges, blanketing, p. way linking works including supply of p. way fittings, track ballast, psc sleeper and points and crossings, construction of ei building in connection with construction
Execution of earthwork in formation, construction of minor bridges, blanketing, p. way linking works including supply of p. way fittings, track ballast, psc sleeper and points and crossings, construction of ei building in connection with construction
Read moreof your Industry type