| Title |
Lot 02 Work Of Restoration Of Falling Shutter, Crust, Inspection Gallery Of Dhukwan Weir And Relaying Of Damaged Boulder Pitching Of Afflux Dam.
|
| Description |
Lot 02 Work Of Restoration Of Falling Shutter, Crust, Inspection Gallery Of Dhukwan Weir And Relaying Of Damaged Boulder Pitching Of Afflux Dam.
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_UPIDC_849712_2 |
|
Reference Number |
04/SE-IV/2023-24 |
| Tender Fee | 7400 |
| EMD | 9.16 Lakh |
| Tender Value | - |
| Place | OFFICE OF THE SUPERINTENDING ENGINEER, IVth CIRCLE |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | October 18, 2023 15:30 |
| End Date |
Expired
26/10/2023
Expired 1082 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair of damaged u/s boulder pitching of baigul dam between km. 7.500 to 7.800
Repair of damaged u/s boulder pitching of baigul dam between km. 7.500 to 7.800
Read moreR/m work of 3 weir gates and 1 h/r gate and falling shutter at head works site of dahuajore weir scheme.
R/m work of 3 weir gates and 1 h/r gate and falling shutter at head works site of dahuajore weir scheme.
Read moreR/m work of 3 nos. weir (c/r) gates and 1 no. h/r gate and falling shutter at head works site of dahuajore weir scheme
R/m work of 3 nos. weir (c/r) gates and 1 no. h/r gate and falling shutter at head works site of dahuajore weir scheme
Read moreConstruction of protection wall and stone pitching near open gallery and construction of drain at picnic spot of upper kolab dam.
Construction of protection wall and stone pitching
Read moreConstruction of stone boulder pitching, rock toe and toe drain between ch.km.2.400 to 2.600 and km 4.200 to 4.600 of kabrai dam.
Construction of stone boulder pitching, rock toe and toe drain between ch.km.2.400 to 2.600 and km 4.200 to 4.600 of kabrai dam.
Read moreConstruction of balanced work of earthen dam including stone pitching in ch 40 m to 610 m and balanced excavation and construction of waste weir approach and tail channel
Construction of balanced work of earthen dam including stone pitching in ch 40 m to 610 m and balanced excavation and construction of waste weir approach and tail channel
Read moreRestoration dry stone pitching and embankment u/s side of dam ,near h.r. and constructing retaining wall near tail channel of waste weir at lore m. i. scheme, tal - kankavli, dist- sindhudurg
Restoration dry stone pitching and embankment u/s side of dam ,near h.r. and constructing retaining wall near tail channel of waste weir at lore m. i. scheme, tal - kankavli, dist- sindhudurg
Read moreRenovation of falling shutter gate, u/s gate with repairing of their hoisting arrangement, embedded parts, changing of rubber seal and new hoist bridge, foot bridge and operation room of u/s gate and maintenance three years of fuljhar weir scheme.
Renovation of falling shutter gate, u/s gate with repairing of their hoisting arrangement, embedded parts, changing of rubber seal and new hoist bridge, foot bridge and operation room of u/s gate and maintenance three years of fuljhar weir scheme.
Read moreof your Industry type