Tender Details

Particulars Details
Title
Final Location Survey Of Mathura Dholpur 4th Line (107 Km).
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 77479511
Reference
Number
CEN00AGC1724
Tender Fee 0
EMD 1.1 Lakh
Tender Value -
Place Allahabad
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/102024/77479511/viewNitPdf_4719318.pdf

Start Date September 18, 2024 22:29
End Date
Expired 18/10/2024

Expired 727 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Conducting final location survey, traffic survey, including collection of field details for geotechnical investigation, preparation of gads & other drawings and preparation of survey report & estimate etc for the work of bg line in connection with new railway line between dhamtari-gurur-balod (80 km).

Conducting final location survey, traffic survey, including collection of field details for geotechnical investigation, preparation of gads & other drawings and preparation of survey report & estimate etc for the work of bg line in connection with new railway line between dhamtari-gurur-balod (80 km).

Read more
Conducting final location survey for construction of new bg railway line, gauge conversion, doubling, multi-tracking & traffic surveys over western railway under the jurisdiction of chief administrative officer / construction / ccg / western railway, mumbai.

Conducting final location survey for construction of new bg railway line, gauge conversion, doubling, multi-tracking & traffic surveys over western railway under the jurisdiction of chief administrative officer / construction / ccg / western railway, mumbai.

Read more
Preparation of land plans and land acquisition proposals including joint measurement survey, compensation assessment and land transfer, and preparation and processing of forest land diversion and wildlife clearance proposals for nagda-mathura 3rd & 4th line project of west central railway

Preparation of land plans and land acquisition proposals including joint measurement survey, compensation assessment and land transfer, and preparation and processing of forest land diversion and wildlife clearance proposals for nagda-mathura 3rd & 4th line project of west central railway

Read more
Carrying out final location survey, geotechnical studies, design, preparation of drawings & other preliminary activities for preparing detailed estimate on actual realistic cost in connection with new line between anupgarh to bikaner (131.750km) and spur line from rojhri to khajuwala (54.875 km) of bikaner division of north western railway.

Carrying out final location survey, geotechnical studies, design, preparation of drawings & other preliminary activities for preparing detailed estimate on actual realistic cost in connection with new line between anupgarh to bikaner (131.750km) and spur line from rojhri to khajuwala (54.875 km) of bikaner division of north western railway.

Read more
Rate contract for carrying out final location survey (geotechnical studies, design & preparation of drawing) and other preliminary activities for preparation of dpr (including electrical, signal, operating/ traffic works and preparation of epc bid package) in connection with survey for new line, bye-pass line, doubling/multitracking, flyover etc. in e.c.railway including providing facilitation to competent authority for land acquisition (cala) for land acquisition work to the railway proje

Rate contract for carrying out final location survey (geotechnical studies, design & preparation of drawing) and other preliminary activities for preparation of dpr (including electrical, signal, operating/ traffic works and preparation of epc bid package) in connection with survey for new line, bye-pass line, doubling/multitracking, flyover etc. in e.c.railway including providing facilitation to competent authority for land acquisition (cala) for land acquisition work to the railway proje

Read more
Conducting detailed survey including preliminary investigation, net level survey, taking longitudinal sections and cross sections along the alignment and detailed final survey including preparation of designs, drawings and estimates of distributory network including minors or sub-minors or field channels by conducting detailed block level survey for an extent 35,220 acres to identify a minimum net ayacut of 29,937 acres by proposing a ph at pragallapalli village, dummugudem mandal of bhadradri

Conducting detailed survey including preliminary investigation, net level survey, taking longitudinal sections and cross sections along the alignment and detailed final survey including preparation of designs, drawings and estimates of distributory network including minors or sub-minors or field channels by conducting detailed block level survey for an extent 35,220 acres to identify a minimum net ayacut of 29,937 acres by proposing a ph at pragallapalli village, dummugudem mandal of bhadradri kothagudem district on left bank of sitamma sagar multi purpose project.(2nd call)

Read more
Re-location of sub- station at chhinda ocm and repairing of sub- station at rawanwara, repairing of celling at survey office (sethia) under rwa-cda of pench area.

Re-location of sub- station at chhinda ocm and repairing of sub- station at rawanwara, repairing of celling at survey office (sethia) under rwa-cda of pench area.

Read more
Repairing and maintenance of 168 nos. tubewells at different location of borough - viii, ix and x including supply, fitting and fixing necessary accessories / materials within kulti borough office under asansol municipal corporation. 4th call

Repairing and maintenance of 168 nos. tubewells at different location of borough - viii, ix and x including supply, fitting and fixing necessary accessories / materials within kulti borough office under asansol municipal corporation. 4th call

Read more
Survey, supply, installation testing and commissioning (sitc) of grid connected solar pv power plant (200 kw ) on rooftop / on ground or suitable location in the premises of different stages of nagthat pumping w/s scheme

Survey, supply, installation testing and commissioning (sitc) of grid connected solar pv power plant (200 kw ) on rooftop / on ground or suitable location in the premises of different stages of nagthat pumping w/s scheme

Read more
Survey, supply, installation testing and commissioning (sitc) of grid connected solar pv power plant (210 kw ) on rooftop / on ground or suitable location in the premises of different stages of akri barjula pumping w/s scheme

Survey, supply, installation testing and commissioning (sitc) of grid connected solar pv power plant (210 kw ) on rooftop / on ground or suitable location in the premises of different stages of akri barjula pumping w/s scheme

Read more
Click Here to Download Dockets
of your Industry type