Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling Stone Slab Flooring Laid In Cement Mortar Including Stacking Of Serviceable Material An
|
| Description |
|
| Organisation | NA | Ministry of Water Resources River Development and Ganga Rejuvenation |
| Tender Id | GEM/2023/B/4062880 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | October 11, 2023 16:44 |
| End Date |
Expired
23/10/2023
Expired 1086 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
CHANDRAYAAN BUILDCON
1845928.56
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|---|
| 1 | CHANDRAYAAN BUILDCON | - | 22-10-2023 19:21:00 | Central / State PSUs | MII MSE | Qualified |
| 2 | CUEZONE INFRA PRIVATE LIMITED | - | 23-10-2023 09:18:53 | Start-up | MII MSE | Qualified |
| 3 | FINE FAY ENGINEERING SERVICE | - | 23-10-2023 11:20:49 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 4 | FOURF INTERNATIONAL | - | 20-10-2023 10:37:05 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 5 | rajesh v k | - | 22-10-2023 21:53:15 | MSE | MII MSE | Disqualified |
| 6 | WOOD N CANE | - | 21-10-2023 18:09:42 | Registered with designated Agency / Authority | MII N/A | Disqualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | CHANDRAYAAN BUILDCON(MSE,MII) | Item Categories : Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material an | 1845928.56 | L1 |
| 2 | FINE FAY ENGINEERING SERVICE (MSE,MII) | Item Categories : Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material an | 1922340.00 | L2 |
| 3 | CUEZONE INFRA PRIVATE LIMITED (MSE,MII) | Item Categories : Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material an | 2247060.00 | L3 |
| 4 | FOURF INTERNATIONAL (MSE,MII) | Item Categories : Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material an | 2537450.00 | L4 |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead | NA | BOQ Item | 938 | ₹ 346825.500 |
| Providing and laying vitrified floor tiles in different sizes thickness to be specified by the manufacturer with water absorption less than 0.08 Percentage | NA | BOQ Item | 672 | ₹ 982692.480 |
| Cement plaster skirting up to 30 cm height with cement mortar 1 cement 3 coarse sand finished with a floating coat of neat cement 18 mm thick | NA | BOQ Item | 58 | ₹ 32614.560 |
| Providing and laying polished Granite stone flooring in required design and patterns in linear as well as curvilinear portions of building all complete as per the architectural drawings | NA | BOQ Item | 149 | ₹ 381924.250 |
| Chequerred precast cement concrete tiles | NA | BOQ Item | 91 | ₹ 101871.770 |
Supply and stacking coarse sand, bricks cd-75, stone agg. 20mm, precast rcc slab, rcc manhole and gully grating at mpl. store in ward no. 14/clz.
Supply and stacking coarse sand, bricks cd-75, stone agg. 20mm, precast rcc slab, rcc manhole and gully grating at mpl. store in ward no. 14/clz.
Read moreProviding and laying cement concrete flooring iron profile sheeting. cpvc pipelines sink etc in cauvery hostel academic campus cutn for the installation of an ro plant
Providing and laying cement concrete flooring iron profile sheeting. cpvc pipelines sink etc in cauvery hostel academic campus cutn for the installation of an ro plant
Read morePrcc slab for drain 1000x500mm,cement opc 43 grade,instant curing bituminous ready coldmix,prcc slab for drain 1200x500mm,prcc slab for drain1500x500mm,precast rcc manhole cover with frame ehd35 560mm,precast rcc manhole cover with frame hd20 560mm,paver block 60mm thick 300x150 m30,kerb stone m25,stone aggregate 20mm or 10mm nominal size,coarse sand,fine sand
Prcc slab for drain 1000x500mm,cement opc 43 grade,instant curing bituminous ready coldmix,prcc slab for drain 1200x500mm,prcc slab for drain1500x500mm,precast rcc manhole cover with frame ehd35 560mm,precast rcc manhole cover with frame hd20 560mm,paver block 60mm thick 300x150 m30,kerb stone m25,stone aggregate 20mm or 10mm nominal size,coarse sand,fine sand
Read moreDismantling old plaster,dismantling tile work,supplying and fixing movable,providing and applying gypsum-based punning,providing and applying white cement,providing and applying priming,wall painting with acrylic,providing and laying ceramic glazed floor tiles,providing and laying in position cement concrete,dismantling and removing existing wooden flooring,providing and fixing wooden sub-base floor,providing and fixing 4.5 mm thick pvc vinyl flooring,supplying and fixing movable badminton posts
Dismantling old plaster,dismantling tile work,supplying and fixing movable,providing and applying gypsum-based punning,providing and applying white cement,providing and applying priming,wall painting with acrylic,providing and laying ceramic glazed floor tiles,providing and laying in position cement concrete,dismantling and removing existing wooden flooring,providing and fixing wooden sub-base floor,providing and fixing 4.5 mm thick pvc vinyl flooring,supplying and fixing movable badminton posts
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr