Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling Stone Slab Tile Flooring Laid In Cement Mortar Including Plain Cement Concrete At Roof
|
| Description |
|
| Organisation | Department of Defence Research & Development | Ministry of Defence |
| Tender Id | GEM/2023/B/3990453 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | September 21, 2023 20:14 |
| End Date |
Expired
05/10/2023
Expired 1107 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|---|
| 1 | NIRMAN INTERIORS | - | 05-10-2023 12:59:12 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 2 | Sri Ram water proofing | - | 04-10-2023 16:45:15 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 3 | VNEXT WORKS PRIVATE LIMITED | - | 05-10-2023 09:24:28 | Registered with designated Agency / Authority | MII MSE | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | VNEXT WORKS PRIVATE LIMITED(MSE,MII) | Item Categories : Dismantling stone slab tile flooring laid in cement mortar including plain cement concrete at roof | 1594980.00 | L1 |
| 2 | NIRMAN INTERIORS (MSE,MII) | Item Categories : Dismantling stone slab tile flooring laid in cement mortar including plain cement concrete at roof | 1637600.00 | L2 |
| 3 | Sri Ram water proofing (MSE,MII) | Item Categories : Dismantling stone slab tile flooring laid in cement mortar including plain cement concrete at roof | 1924300.00 | L3 |
Readymade bituminous pothhole patching mix as per is 217 cutback bitumen, is 14982 anti - stripping agent,coarse sand,stone screen chipping,stone aggregate,cc kerbstone,red sand stone for kerb stone,sfrc drain slab cover rectangular slab,sfrc drain slab cover rectangular slab,frp gully grating cover without frame,frp gully grating cover without frame,tactile tile,paver block,delhi quartz stone,circular 560 mm dia manhole cover with frame
Readymade bituminous pothhole patching mix as per is 217 cutback bitumen, is 14982 anti - stripping agent,coarse sand,stone screen chipping,stone aggregate,cc kerbstone,red sand stone for kerb stone,sfrc drain slab cover rectangular slab,sfrc drain slab cover rectangular slab,frp gully grating cover without frame,frp gully grating cover without frame,tactile tile,paver block,delhi quartz stone,circular 560 mm dia manhole cover with frame
Read moreDismantling old plaster,dismantling tile work,supplying and fixing movable,providing and applying gypsum-based punning,providing and applying white cement,providing and applying priming,wall painting with acrylic,providing and laying ceramic glazed floor tiles,providing and laying in position cement concrete,dismantling and removing existing wooden flooring,providing and fixing wooden sub-base floor,providing and fixing 4.5 mm thick pvc vinyl flooring,supplying and fixing movable badminton posts
Dismantling old plaster,dismantling tile work,supplying and fixing movable,providing and applying gypsum-based punning,providing and applying white cement,providing and applying priming,wall painting with acrylic,providing and laying ceramic glazed floor tiles,providing and laying in position cement concrete,dismantling and removing existing wooden flooring,providing and fixing wooden sub-base floor,providing and fixing 4.5 mm thick pvc vinyl flooring,supplying and fixing movable badminton posts
Read moreCement pointing flat brick flooring on 750 no.(t-1 to t-3)houses roof in bbmb colony talwara township(phase-1)
Cement pointing flat brick flooring on 750 no (t-1 to t-3)houses roof in bbmb colony talwara township(phase-1)
Read moreRepair to kerb stone, paver blocks and chequered tile flooring, hard standing parking shed and other misc work at west side of lehl marg under ge south binnaguri
As per tender document
Read moreRepair to interlocking paver block, kerb stone, parking tile, roof sheet and other certain misc works for area-i under aor of age b/r (west) under ge (west) colaba mumbai
Repair to interlocking paver block, kerb stone, parking tile, roof sheet and other certain misc works for area-i under aor of age b/r (west) under ge (west) colaba mumbai
Read moreProviding of plain cement concrete (pcc) pavement flooring for stretcher way from op block to the mch, building in the premises of government general hospital, khammam in khammam district
Providing of plain cement concrete (pcc) pavement flooring for stretcher way from op block to the mch, building in the premises of government general hospital, khammam in khammam district
Read moreWpc solid door or window frames,wpc solid laminated board 24 mm thick,stainless steel hinges 100 mm bright finish,pvc nahani trap 110 mm plain with grating,stainless steel continuous piano hinges 40 mm width,granite stone flooring 18 mm thick mirror polished,pre-painted galvalume gi corrugated steel sheet zero point zero five mm thick,plain polycarbonate multiwall roof sheets 10 mm thick uv coated,insulation board false ceiling 10 mm thick 600 into 600 mm,cp brass stop cock concealed,kota stone window cill 20 to 25 mm thick,extra for kota stone oblique sandstone window cill single length up to 2 m,extra for pre finished nosing in kota stone oblique sandstone window cill
Wpc solid door or window frames,wpc solid laminated board 24 mm thick,stainless steel hinges 100 mm bright finish,pvc nahani trap 110 mm plain with grating,stainless steel continuous piano hinges 40 mm width,granite stone flooring 18 mm thick mirror polished,pre-painted galvalume gi corrugated steel sheet zero point zero five mm thick,plain polycarbonate multiwall roof sheets 10 mm thick uv coated,insulation board false ceiling 10 mm thick 600 into 600 mm,cp brass stop cock concealed,kota stone window cill 20 to 25 mm thick,extra for kota stone oblique sandstone window cill single length up to 2 m,extra for pre finished nosing in kota stone oblique sandstone window cill
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreSteel reinforcement for r.c.c. work including straightening cutting bending placing in position and binding all complete above plinth level thermo mechanically treated bars of grade fe500d or more.,half brick masonry with common burnt clay fps non modular bricks of class designation above plinth level up to floor v level cement mortar 1 is to 4 where 1 cement and 4 coarse sand,stainless steel cramps,two track two panels sliding with aluminium channel for roller track wool pile nylon rollers with ss 304 using r4 series with frame,providing and fixing 19 mm thick both side balancing lamination factory pressed bwp grade marine ply,providing and fixing 2mm thick 16 to 19mm wide pvc edge binding tape of approved quality for cupboard,double charge vitrified tile polished finish of size of tile 600 x 600 mm,finishing walls with premium acrylic smooth exterior paint with silicone additives of required shade,providing and applying white cement based putty of average thickness 1 mm,wiring for light point fa
Steel reinforcement for r.c.c. work including straightening cutting bending placing in position and binding all complete above plinth level thermo mechanically treated bars of grade fe500d or more.,half brick masonry with common burnt clay fps non modular bricks of class designation above plinth level up to floor v level cement mortar 1 is to 4 where 1 cement and 4 coarse sand,stainless steel cramps,two track two panels sliding with aluminium channel for roller track wool pile nylon rollers with ss 304 using r4 series with frame,providing and fixing 19 mm thick both side balancing lamination factory pressed bwp grade marine ply,providing and fixing 2mm thick 16 to 19mm wide pvc edge binding tape of approved quality for cupboard,double charge vitrified tile polished finish of size of tile 600 x 600 mm,finishing walls with premium acrylic smooth exterior paint with silicone additives of required shade,providing and applying white cement based putty of average thickness 1 mm,wiring for light point fa
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreof your Industry type