Tender Details
Particulars | Details |
---|---|
Title |
Handloom Wool Blankets As Per Is 894,Wall Clocks As Per Is 12510
|
Description |
|
Organisation | Bhakra Beas Managemet Board | Ministry of Power |
Tender Id | GEM/2025/B/6043840 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | March 11, 2025 19:35 |
End Date |
21/03/2025 ( Expired 73 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Structural stores of svl bkr as per ts,roofing and wall stores of svl bkr as per ts,construction ma
Read more
Structural stores as per ts,roofing and wall as per ts,construction materials as per ts,electrical
Read more
Construction of new operational boundary wall in place of old, damaged load bearing boundary wall and raising of boundary wall as per bcas standard including provision of precast slab below ground level as required at mbb airport, agartala
Construction of new operational boundary wall in place of old, damaged load bearing boundary wall and raising of boundary wall as per bcas standard including provision of precast slab below ground level as required at mbb airport, agartala
Read moreConstruction of cc drain ward no. 26 sindhi dharmshala to sajawat handloom shahdol as per nit and estimate.
Construction of cc drain ward no. 26 sindhi dharmshala to sajawat handloom shahdol as per nit and estimate.
Read moreUnder operation kanyakalp, the composite pre-secondary school was on duty to complete the remaining work of tiling of classrooms, boundary wall and toilets as per the saturated parameters.
Under operation kanyakalp, the composite pre-secondary school was on duty to complete the remaining work of tiling of classrooms, boundary wall and toilets as per the saturated parameters.
Read moreSupply, dismantling, fabrication, erection of furnace rear wall panel tubes and hydraulic test for ibr repairing work of 110 tph, isgec make, water tube travelling grate boiler as per ibr at hbl plant lauriya
Supply, dismantling, fabrication, erection of furnace rear wall panel tubes and hydraulic test for ibr repairing work of 110 tph, isgec make, water tube travelling grate boiler as per ibr at hbl plant lauriya
Read moreBoundary wall, fencing and c.c. road construction work as per requirement at various places in the central area from achhnera road to ludhawai toll plaza under the jurisdiction of executive engineer ii in the authority area. (annual)
Boundary wall, fencing and c.c. road construction work as per requirement at various places in the central area from achhnera road to ludhawai toll plaza under the jurisdiction of executive engineer ii in the authority area. (annual)
Read moreConstruction of boundary wall at ward no 05 vinoba nagar main road ratlam as per nit and estimate
Construction of boundary wall at ward no 05 vinoba nagar main road ratlam as per nit and estimate
Read moreof your Industry type