Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Installation Of Crash Barrier, Parapets, Delinators, Sign Boards Etc. On Devalthal Kanalichina Motor Road (16.00 Km) Of Block Kanalichina District Pithoragarh Under Road Safety.
|
| Description |
Installation Of Crash Barrier, Parapets, Delinators, Sign Boards Etc. On Devalthal Kanalichina Motor Road (16.00 Km) Of Block Kanalichina District Pithoragarh Under Road Safety.
|
| Organisation | Government of Uttarkhand |
| Tender Id | 2023_pwd_61626_1 |
|
Reference Number |
4142/984C(Yata A)-03/2023 Dated 24-07-2023 |
| Tender Fee | 5900 |
| EMD | 4.65 Lakh |
| Tender Value | |
| Place | SE 3rd Circle PWD Pithoragarh |
| Link |
View Original Tender Notice
https://uktenders.gov.in |
| Start Date | August 03, 2023 14:30 |
| End Date |
Expired
28/08/2023
Expired 1015 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Protection work on naini-saini devat kumdar to kanari motor road in pithoragarh constituency of pithoragarh district under honrable cm announcement number 521/2025.
Protection work on naini-saini devat kumdar to kanari motor road in pithoragarh constituency of pithoragarh district under honrable cm announcement number 521/2025.
Read moreRedevelopment of central verge on various roads under division wr-2 delhi during 2025-26. (sh providing and fixing of precast crash barrier/jersey barrier at central verge on vishal cinema road, shiv mandir road, road no. 28, shivaji college road
Redevelopment of central verge on various roads under division wr-2 delhi during 2025-26. (sh providing and fixing of precast crash barrier/jersey barrier at central verge on vishal cinema road, shiv mandir road, road no. 28, shivaji college road
Read moreConstruction of approach road and protection work on bisuhi river of gosaiganj-bheti-mahrua-dostpur road (main district road) at km-13 under katehari assembly in district ambedkar nagar on sbd mode.
Construction of approach road and protection work on bisuhi river of gosaiganj-bheti-mahrua-dostpur road (main district road) at km-13 under katehari assembly in district ambedkar nagar on sbd mode.
Read moreConstruction of 120m length pedestrian bridge to connect malana village with km 06 of arakot chinwa balcha motor road under vikaskhand mori in district uttarkashi
Construction of 120m length pedestrian bridge to connect malana village with km 06 of arakot chinwa balcha motor road under vikaskhand mori in district uttarkashi
Read moreDevelopment and repair work between km 1 to 8 of talla ramgarh ratighat (arvindon sarni) motor road in bhimtal assembly constituency of nainital district. under state sector
Development and repair work between km 1 to 8 of talla ramgarh ratighat (arvindon sarni) motor road in bhimtal assembly constituency of nainital district. under state sector
Read moreConstruction of 1 (one) no. sbdtw scheme (150 mm x 100 mm) including installation of pump motor sets and laying of distribution system etc. at south baraiya under gourangabazar g.p. under rajnagar r.d. block during the year 2025-26 (ffc fund).
Construction of 1 (one) no. sbdtw scheme (150 mm x 100 mm) including installation of pump motor sets and laying of distribution system etc. at south baraiya under gourangabazar g.p. under rajnagar r.d. block during the year 2025-26 (ffc fund).
Read moreRenewal bv b.c. and construction of footpath work on the internal roads of shankaracharya chowk, devpura chowk, chandracharya chowk, aryanagar chowk and the road from barrier to gugal temple in district haridwar under kumbh mela 2027
Renewal bv b.c. and construction of footpath work on the internal roads of shankaracharya chowk, devpura chowk, chandracharya chowk, aryanagar chowk and the road from barrier to gugal temple in district haridwar under kumbh mela 2027
Read moreUrgent resurfacing of damaged road stretches from ch 12.40 km to ch22.00km on major district road for a length of 3.0 km under mandrem constituency in pernem taluka (retender 1st call)
Urgent resurfacing of &#x0d damaged road stretches &#x0d from ch 12.40 km to &#x0d ch22.00km on major &#x0d district road for a length &#x0d of 3.0 km under &#x0d mandrem constituency &#x0d in pernem taluka &#x0d (retender 1st call)
Read moreRenewal work by sdbc in km 6 to 8 and 10 to 13 of selaqui-bhauwala-dunga-nanda ki chowki motor road in sahaspur constituency of dehradun district under annual repair 2026-27.
Renewal work by sdbc in km 6 to 8 and 10 to 13 of selaqui-bhauwala-dunga-nanda ki chowki motor road in sahaspur constituency of dehradun district under annual repair 2026-27.
Read moreConstruction of 46 mtr span through type steel truss girder motorable bridge at km 4th rd 400- 450 on bhaga to lalesa marel road under package no. jk14-556, regular pmgsy (batch-i, 2017-18), block reasi, district reasi
Construction of 46 mtr span through type steel truss girder motorable bridge at km 4th rd 400- 450 on bhaga to lalesa marel road under package no. jk14-556, regular pmgsy (batch-i, 2017-18), block reasi, district reasi
Read moreof your Industry type