Tender Details
Particulars | Details |
---|---|
Title |
Package No.Ap05 Pxilb05 Construction Of High Level Bridge Across Chandravankavagu On R/F Sarivella To Venkatapuram At 0/480 Km Of Chintur Mandal.Est Rs 265.00/136.00 Lakhs(balance Work ) In 1st Call.
|
Description |
Package No.Ap05 Pxilb05 Construction Of High Level Bridge Across Chandravankavagu On R/F Sarivella To Venkatapuram At 0/480 Km Of Chintur Mandal.Est Rs 265.00/136.00 Lakhs(balance Work ) In 1st Call.
|
Organisation | National Rural Road Development Agency (NRRDA) |
Tender Id | 2023_ENCPR_129472_1 |
Reference Number |
NIT 38/PMGSYIII/2023-24, Dt 7.11.2023 of SE PRKKD |
Tender Fee | 0 |
EMD | 1.83 Lakh |
Tender Value | |
Place | O/oSuperintending Engineer, PR circle,kakinada |
Link | https://pmgsytenders.gov.in |
Start Date | December 04, 2023 22:30 |
End Date |
11/12/2023 ( Expired 517 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreConstruction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor
Construction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor
Read moreConstruction and routine maintenance of road from 1. premtala to mulyarampara including one long span bridge (length-2.06 km)(package no. tr-03-170) (link no. l024) under dasda block (2nd call). dnit no 13/eo/pmgsy-i (balance work)/trrda/2024-25
Pmgsy i balance works
Read moreConstruction and routine maintenance of road from aa road masli to west karamchena 20 card length 3.119 km, package no. tr 04 206, link no. l040 under manu block 2nd call. dnit no 0 i eo pmgsy i balance work trrda 2024 25
Pmgsy-i balance works
Read moreConstruction of new 4 lane with paved shoulder access controlled coastal highway from rameshwar to puri (km.0 to km. 47.340) on hybrid annuity mode in the state of odisha (package i)
Construction of new 4 lane with paved shoulder access controlled coastal highway from rameshwar to puri (km.0 to km. 47.340) on hybrid annuity mode in the state of odisha (package i)
Read moreConstruction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra
Construction of road junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra
Read moreConstruction of high level bridge over chappi river in km. 8th of sh-119 from nh 52 km. 403/502 unhel via bhalta ratlai karal gaon bhumara mundla karodiya sunel
Construction of high level bridge over chappi river in km. 8th of sh-119 from nh 52 km. 403/502 unhel via bhalta ratlai karal gaon bhumara mundla karodiya sunel
Read moreof your Industry type