Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Annual Contract Of Providing Assistance In Fire Protection System And To Carry Out The Routine Work And Other Associated Work Of Fire Fighting System Operation Of Unit 1to 4 (4 X 250 Mw) Stage I, Phase I And Ii, Ctpp, Chhabra
|
Description |
Annual Contract Of Providing Assistance In Fire Protection System And To Carry Out The Routine Work And Other Associated Work Of Fire Fighting System Operation Of Unit 1to 4 (4 X 250 Mw) Stage I, Phase I And Ii, Ctpp, Chhabra
|
Organisation | RRVUN - CMD | State Govt. and UT |
Tender Id | 2024_RRVUN_410559_1 |
Reference Number |
579/2024-25/ SE (F and S/Security/AB)/CTPP |
Tender Fee | 2680 |
EMD | 1.25 Lakh |
Tender Value | |
Place | CTPP, RVUNL, CHHABRA |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=739155 |
Start Date | August 02, 2024 18:30 |
End Date |
16/08/2024 ( Expired 324 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Biennial electrical maintenance contract under chp, stage-i (2x300 mw ) stage ii (2x 500 mw) and upcoming unit-5 (660mw) along with several piecemeal jobs at sgtpp , wbpdcl.
Biennial electrical maintenance contract under chp, stage-i (2x300 mw ) stage ii (2x 500 mw) and upcoming unit-5 (660mw) along with several piecemeal jobs at sgtpp , wbpdcl.
Read moreLot i package civil works package for 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir
Lot i civil works comprising of hrt including adits, surge shaft including adits, pressure shaft including adits, underground p/h cavern, bus ducts, underground transformer cavern, underground dt gate operation cavern and others as per scope of work.
Read moreRate contract for supply, erection, testing and commissioning of 11kv ct/pt combined metering unit alongwith trivector meter and 3 phase 4 wire prodigy meter at various distribution transformers under electric division-i parade jammu
Rate contract for supply, erection, testing and commissioning of 11kv ct/pt combined metering unit alongwith trivector meter and 3 phase 4 wire prodigy meter at various distribution transformers under electric division-i parade jammu
Read moreSupply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl
Supply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl
Read moreProcurement of spares of oil supply unit installed at hpbp system of 2x210 mw and 2x250 mw units of stage-i and ii at ghtp, lehra mohabbat
Procurement of spares of oil supply unit installed at hpbp system of 2x210 mw and 2x250 mw units of stage-i and ii at ghtp, lehra mohabbat
Read moreSupply, installation and commissioning work of complete restoration of auto control system, alarm system and interlock protection of emulsifier system for gt, st, uat and mot rooms for unit no. i,ii,iii and iv at sgtps, mppgcl, birsinghpur.
Supply, installation and commissioning work of complete restoration of auto control system, alarm system and interlock protection of emulsifier system for gt, st, uat and mot rooms for unit no. i,ii,iii and iv at sgtps, mppgcl, birsinghpur.
Read moreWork contract for filling of empty hydrogen cylinders and assistance in various operation and cleaning of compressor, generating unit, rectifier and other auxiliaries during shift at hydrogen plant no.ii and hydrogen plant 3 stps sarni
&#x0d work contract for filling of empty hydrogen cylinders and assistance in various operation and cleaning of compressor, generating unit, rectifier and other auxiliaries during shift at hydrogen plant no.ii and hydrogen plant 3 stps sarni
Read moreTtps mech ii tm i unit iii inspection overhauling and commissioning of butterfly valve actuators for manual operation in condenser system during annual overhaul 2025 26
Ttps mech ii tm i unit iii inspection overhauling and commissioning of butterfly valve actuators for manual operation in condenser system during annual overhaul 2025 26
Read moreSitc of fire fighting system as per nbc part 4 2016 and additional civil work required for obtaining occupancy certificate at gh 11 in pu south campus sector 25 chandigarh
Sitc of fire fighting system as per nbc part 4 2016 and additional civil work required for obtaining occupancy certificate at gh 11 in pu south campus sector 25 chandigarh
Read moreNctps i se m ii ahp dn unit i ii iii outsourcing of operation and maintenance of pdfac system for a period of 60 days or until completion of quantity (58000 mt) whichever is earlier
Nctps i se m ii ahp dn unit i ii iii outsourcing of operation and maintenance of pdfac system for a period of 60 days or until completion of quantity (58000 mt) whichever is earlier
Read moreof your Industry type