Tender Details
Particulars | Details |
---|---|
Title |
Annual Contract Of Providing Assistance In Fire Protection System And To Carry Out The Routine Work And Other Associated Work Of Fire Fighting System Operation Of Unit 1to 4 (4 X 250 Mw) Stage I, Phase I And Ii, Ctpp, Chhabra
|
Description |
Annual Contract Of Providing Assistance In Fire Protection System And To Carry Out The Routine Work And Other Associated Work Of Fire Fighting System Operation Of Unit 1to 4 (4 X 250 Mw) Stage I, Phase I And Ii, Ctpp, Chhabra
|
Organisation | RRVUN - CMD | State Govt. and UT |
Tender Id | 2024_RRVUN_410559_1 |
Reference Number |
579/2024-25/ SE (F and S/Security/AB)/CTPP |
Tender Fee | 2680 |
EMD | 1.25 Lakh |
Tender Value | |
Place | CTPP, RVUNL, CHHABRA |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=739155 |
Start Date | August 02, 2024 18:30 |
End Date |
16/08/2024 ( Expired 250 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Work of hammering and poking of coal bunker in all three shift during rainy season in unit 1,2,3 and 4 of ph-i n ph-ii at sstpp, mppgcl, dongalia, dist. khandwa
Work of hammering and poking of coal bunker in all three shift during rainy season in unit 1,2,3 and 4 of ph-i n ph-ii at sstpp, mppgcl, dongalia, dist. khandwa
Read moreSupply of various conveyor rollers and frames installed at chp and ahp stage i phase i and ii ctpp chhabra
Supply of various conveyor rollers and frames installed at chp and ahp stage i&#x0d phase i and ii ctpp chhabra
Read moreAmc for statcon make battery chargers installed for dc system of unit-i to iv, 400kv switchyard phase -i and ii, plcc of phase-i and ii and silo area phase-i, ctpp.
Amc for statcon make battery chargers installed for dc system of unit-i to iv, 400kv switchyard phase -i and ii, plcc of phase-i and ii and silo area phase-i, ctpp.
Read moreSupply of pvc v-bar, drift eliminator blade, nozzles, grp grid and associated items of induced draft, cross flow cooling tower, 4x250mw, stage-i, phase-ii, ctpp, rvunl, chhabra
Supply of pvc v-bar, drift eliminator blade, nozzles, grp grid and associated items of induced draft, cross flow cooling tower, 4x250mw, stage-i, phase-ii, ctpp, rvunl, chhabra
Read moreAnnual contract for providing cup lock metallic scaffolding in side and outside the boiler during annual overhauling of unit 1 to 4, ctpp, rvunl, chhabra
Annual contract for providing cup lock metallic scaffolding in side and outside the boiler during annual overhauling of unit 1 to 4, ctpp, rvunl, chhabra
Read moreEmandmrt- inspection of hydrogen sealing assembly system (seal and seal rings) inner oil catchers generator and exciter bearings no 5, 6 and 7 and hydrogen and exciter coolers of 250 mw unit 9 of ktps-v stage during annual overhaul period 2025-26.
Emandmrt- inspection of hydrogen sealing assembly system (seal and seal rings) inner oil catchers generator and exciter bearings no 5, 6 and 7 and hydrogen and exciter coolers of 250 mw unit 9 of ktps-v stage during annual overhaul period 2025-26.
Read moreAnnual comprehensive servicing and prive maintenance of pumps and pipeline network alongwith fire fighting system at phase i and ii of coochbehar industrial park,wbiidc,chakchaka,
Annual comprehensive servicing and prive maintenance of pumps and pipeline network alongwith fire fighting system at phase i and ii of coochbehar industrial park,wbiidc,chakchaka,district- coochbehar-736156
Read moreWork contract for hammering of coal bunker chutes raw coal feeder of unit no 1 to 4 ph i ii for the period of 2 months rainy season at sgtps mppgcl birsinghpur
Work contract for hammering of coal bunker chutes raw coal feeder of unit no 1 to 4 ph i ii for the period of 2 months rainy season at sgtps mppgcl birsinghpur
Read moreAnnual contract for routine operation in shift and r/c/b maintenance work of 6.6 kv swgr of main plant area, maintenance of spbd, cable laying and termination work, o and m of lift and elevators of unit- i to iv, ctpp chhabra.
Annual contract for routine operation in shift and r/c/b maintenance work of 6.6 kv swgr of main plant area, maintenance of spbd, cable laying and termination work, o and m of lift and elevators of unit- i to iv, ctpp chhabra.
Read moreRound the clock operation and maintenance of water system ph i ii and iii 150 kld sewage treatment plant stp and associated equipment at iuac
Round the clock operation and maintenance of water system ph i ii and iii 150 kld sewage treatment plant stp and associated equipment at iuac
Read moreof your Industry type