Tender Details

Particulars Details
Title
Contract For Repair Of Effluent Drain Channels, Pit Area And Providing Stainless Steel Lining (Phase 2) In Wtp At Rcf Thal
Description
Contract For Repair Of Effluent Drain Channels, Pit Area And Providing Stainless Steel Lining (Phase 2) In Wtp At Rcf Thal
Organisation Rashtriya Chemicals and Fertilizers Ltd. | Central Govt. Ministry/Department
Tender Id 2025_RCFL_887343_1
Reference
Number
TH/CC/86510/25/D24-12(I)/396
Tender Fee 0
EMD 75000
Tender Value -
Place RCF Thal, Alibag
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=932694

Start Date November 27, 2025 18:00
End Date
Expired 11/12/2025

Expired 253 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of rcc drain with rcc culvert and sump room for conveyance system and construction of boundary wall at igc aurangabad (phase-i)

Construction of rcc drain with rcc culvert and sump room for conveyance system and construction of boundary wall at igc aurangabad (phase-i)

Read more
Drain repair, slab casting for existing drain & chamber, filling of brick bats, local sand, gsb etc. in water logged/low land area, repairing and patch work of existing road & pavement and other miscellaneous work in all wards of nagar panchayat, punpun, patna

Drain repair, slab casting for existing drain & chamber, filling of brick bats, local sand, gsb etc. in water logged/low land area, repairing and patch work of existing road & pavement and other miscellaneous work in all wards of nagar panchayat, punpun, patna

Read more
Repair renovation painting white washing providing and fixing repair of sanitary works complete in all respect at hsvp staff qtr. no. 5 b f.f in vill. abheypur in ia ph i panchkula

Repair renovation painting white washing providing and fixing repair of sanitary works complete in all respect at hsvp staff qtr. no. 5 b f.f in vill. abheypur in ia ph i panchkula

Read more
Providing staff for running of electrical enquiry in residential and non residential buildings at nabha estate shimla-4 for the year 2026-27 w.e.f 22.09.2026 to 21.09.2027

Providing staff for running of electrical enquiry in residential and non residential buildings at nabha estate shimla-4 for the year 2026-27 w.e.f 22.09.2026 to 21.09.2027

Read more
Construction of a rcc drain and pcc road from awadhesh raut's house to vishal kumar's house in badal gali, mohalla nauwagadhi (2) pcc road repair work from amitabh sinha's house to ramakrishna ashram turn in the upper lane of mohalla brahmini ghat gaya ji under ward no.-39

Construction of a rcc drain and pcc road from awadhesh raut's house to vishal kumar's house in badal gali, mohalla nauwagadhi (2) pcc road repair work from amitabh sinha's house to ramakrishna ashram turn in the upper lane of mohalla brahmini ghat gaya ji under ward no.-39

Read more
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.

Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.

Read more
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.

Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.

Read more
Ward no.-36 under (1) construction of pcc road and rcc drain from the house of nagendra dhani prasad ji at geval bigha shiv temple, via the house of late arun sinha ji, up to the house of bablu ji.(2) road repair work from main road at gewal bigha baulipar to divyanshi enterprises

Ward no.-36 under (1) construction of pcc road and rcc drain from the house of nagendra dhani prasad ji at geval bigha shiv temple, via the house of late arun sinha ji, up to the house of bablu ji.(2) road repair work from main road at gewal bigha baulipar to divyanshi enterprises

Read more
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.

Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.

Read more
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.

Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise