Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 11 Kv Line Using Acsr Raccoon For Interlinking Kuntar And Bellur Feeder Through Ballakkad Minchipadavu Under Electrical Section, Mulleriya
|
Description |
Construction Of 11 Kv Line Using Acsr Raccoon For Interlinking Kuntar And Bellur Feeder Through Ballakkad Minchipadavu Under Electrical Section, Mulleriya
|
Organisation | Kerala State Electricity Board | State Govt. and UT |
Tender Id | 2025_KSEB_752785_1 |
Reference Number |
53/24-25/EE/PMU/KSD dtd 18-03-2025 |
Tender Fee | 1888 |
EMD | 19400 |
Tender Value | |
Place | Mulleria |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1221006 |
Start Date | March 22, 2025 14:30 |
End Date |
05/04/2025 ( Expired 16 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Long term rectification of morth identified blackspots by construction of lvup vup n fob under the project maharashtra karnataka border sangareddy section of nh65from km.352.188 to km.497.174 in the state of karnataka and telangana
Long term rectification of morth identified blackspots by construction of lvup vup n fob under the project maharashtra karnataka border sangareddy section of nh65from km.352.188 to km.497.174 in the state of karnataka and telangana
Read morePreparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Preparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreFor construction of excise and taxation head office building phase ii urban estate patiala civil work public health work and electrical work mc patiala. distt patiala work code pta 25051
For construction of excise and taxation head office building phase ii urban estate patiala civil work public health work and electrical work mc patiala. distt patiala work code pta 25051
Read moreConstruction of 4x250 mva, 33/400 kv x-mers, bays for four nos 400 kv tl for pps-i alongwith 400 kv, 1x125 mvar, shunt reactor (bus type) and 4x250 mva, 33/400 kv x-mers, bays for three nos 400 kv tl for pps-ii at village ramsar chhota,pugal, bikaner
Construction of 4x250 mva, 33/400 kv x-mers, bays for four nos 400 kv tl for pps-i alongwith 400 kv, 1x125 mvar, shunt reactor (bus type) and 4x250 mva, 33/400 kv x-mers, bays for three nos 400 kv tl for pps-ii at village ramsar chhota,pugal, bikaner
Read moreManning for operation and maintenance of 185 mld narmada water supply project comprising hirani pumping station, khatpura pumping station, ahmadpur 132 kv pumping station, 6.6kv line from khatpura to hirani, 6.6kv line from khatpura to bpt, 33kv subs
Manning for operation and maintenance of 185 mld narmada water supply project comprising hirani pumping station, khatpura pumping station, ahmadpur 132 kv pumping station, 6.6kv line from khatpura to hirani, 6.6kv line from khatpura to bpt, 33kv subs
Read moreConstruction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Read moreProviding lying and jointing of lateral sewer line with construction of manhole adjoining area of prn south zone 3 of swarn vihar stp under jurisdiction phe-i jda jaipur
Providing lying and jointing of lateral sewer line with construction of manhole adjoining area of prn south zone 3 of swarn vihar stp under jurisdiction phe-i jda jaipur
Read moreProviding lying and jointing of lateral sewer line with construction of manhole adjoining area of prn north zone 7 for nevta stp under jurisdiction phe i jda jaipur
Providing lying and jointing of lateral sewer line with construction of manhole adjoining area of prn north zone 7 for nevta stp under jurisdiction phe i jda jaipur
Read moreTermination of the lilo of 220 kv sherpur jhajra at 120 mw vyasi hep ujvnl for direct at 400 kv substation sherpur pgcil with a line length of apx 2.5 km partially o h approx. 1.5 km with multi-circuit towers and partially with ug apx length 1 km
Termination of the lilo of 220 kv sherpur jhajra at 120 mw vyasi hep ujvnl for direct at 400 kv substation sherpur pgcil with a line length of apx 2.5 km partially o h approx. 1.5 km with multi-circuit towers and partially with ug apx length 1 km
Read moreof your Industry type