| Particulars | Details |
|---|---|
| Title |
Urgent Rectification And Raising Works Of Parakkadavu Main Canal B N Ch 19 450 Km To 19 600 Km General Civil Work
|
| Description |
Rectification And Raising
|
| Organisation | Irrigation Department | State Govt. and UT |
| Tender Id | 2025_Irrig_790378_1 |
|
Reference Number |
IRR/PII/TR/1775/2025_5_1_1/11 |
| Tender Fee | 555 |
| EMD | 5712 |
| Tender Value | - |
| Place | Karukutty |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1302491 |
| Start Date | August 23, 2025 22:30 |
| End Date |
Expired
01/09/2025
Expired 354 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
General-rm - 2026-27 -rc1- one year running contract for various pwd roads under roads section koduvally ( given to maintenance wing)in kozhikode district 3 road stretches for a length of 8.80 km-running contract (rc1)-general civil work
General-rm - 2026-27 -rc1- one year running contract for various pwd roads under roads section koduvally ( given to maintenance wing)in kozhikode district 3 road stretches for a length of 8.80 km-running contract (rc1)-general civil work
Read moreSupplying all materials at site including pipes, specials, labors, tools and tackles etc. for laying and jointing of ms pipe for conveying main as per latest is specification. lowering of ms pipes and specials in trenches up to a depth of 3 m below gl. laying and jointing the same inside the trench/ over the ground by means of electric arch welding (spirally welded) using standard electrodes as per latest is specification including earth work in excavation in all kind of soil so as to give one m
Supplying all materials at site including pipes, specials, labors, tools and tackles etc. for laying and jointing of ms pipe for conveying main as per latest is specification. lowering of ms pipes and specials in trenches up to a depth of 3 m below gl. laying and jointing the same inside the trench/ over the ground by means of electric arch welding (spirally welded) using standard electrodes as per latest is specification including earth work in excavation in all kind of soil so as to give one meter average cover over the pipe with disposal of excavated earth within initial lead and lift with disinfection of pipes, testing of pipes against 60 m water head etc. to protect against corrosion pipes are given epoxy lining or hot applied coal tar/ asphalt lining or rich cement mortar lining at works or in the field by the centrifugal process. the outer coating for pipe may be in cement sand guniting or hot applied coal- tar asphaltic enamel reinforced with fibre glass fabric yarn as per cpheeo manual of water supply and treatment all complete job as per standard specification. 600 mm dia (minimum thickness- 6.40 mm)
Read moreGeneral crds kkty pmc2 recti 24 25 rectification of parakkadavu main canal between ch 22 100km to 22 500km general civil work
Rectification works of canal
Read moreGeneral-kyip acp (plan ) 2023-24-rectification works to rbmc by raising the height of canal b/w ch 06/200 to 06/400 km -general civil work
Rectification works to rbmc by raising the height of canal
Read moreGeneral crds kkty pmc 24 25 rising of parakkadavu main canal bw ch 19 200km to 19 300km general civil work
Rectification of canal
Read moreGeneral kyip acp plan 2025 26 rectification works to left bank main canal between ch 9 600 and 9 800 km general civil work
Rectification of canal
Read moreGeneral iip crds rectification to lbmc rectification works to lbmc between ch 1 300 km and 1 400 km general civil work ( re tender)
Rectification works of canal
Read moreGeneral irr pii kkty 2024 25 urgent rectification work to the breach threat portion of parakkadavu main canal between ch 28 840km to 28 860 km general civil work
Emergency rectification work of canal
Read morePothundy project 2023 - 24 - rectification works between ch. 0/450 km and 0/500 km of lb main canal
Rectification works of lb main canal
Read moreGeneral kip(lb) rectification worksurgent rectification work of lb main canal between ch 44600m to 44850mgeneral civil work
General kip lb rectification works urgent rectification work of lb main canal between ch 44600m to 44850mgeneral civil work