Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Replacement Of Steel Framed S By Aluminium Framed S At Control Floor Of Ecr Building, Ktps
|
| Description |
Replacement Of Steel Framed S By Aluminium Framed S At Control Floor Of Ecr Building, Ktps
|
| Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
| Tender Id | 2025_WBPDC_895490_1 |
|
Reference Number |
WBPDCL/KTPS/NIT/E3511/25-26 |
| Tender Fee | 0 |
| EMD | 11999 |
| Tender Value | - |
| Place | KTPS,Mecheda,PurbaMedinipur |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2019344 |
| Start Date | September 12, 2025 16:30 |
| End Date |
Expired
22/09/2025
Expired 386 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair replacement of floor tiles
Repair replacement of floor tiles joinery, false ceiling and certain other b/r connected work in sncos mess, airmen institute and living in accn in domestic area at afs yelahanka
Read moreReplacement of 03 nos. control and relay replacement of 03 nos control and relay panel
Replacement of 03 nos. control and relay replacement of 03 nos control and relay panel
Read moreTggenco-ktps vii stage/paloncha - supply of smart positioner for hwl and mefcv hydraulic control valves
Tggenco-ktps vii stage/paloncha - supply of smart positioner for hwl and mefcv hydraulic control valves
Read moreTggenco-ktps vii stage/paloncha - supply of rotork make snap acting relays and volume boosters for various control valves
Tggenco-ktps vii stage/paloncha - supply of rotork make snap acting relays and volume boosters for various control valves
Read moreWork contract for rolling shutter and railing work and providing and fixing of aluminium door and wpc solid board partition in new ecr building at atps, chachai.
Work contract for rolling shutter and railing work and providing and fixing of aluminium door and wpc solid board partition in new ecr building at atps, chachai.
Read moreSpecial repair/renovation of existing 11 kv sub station along with replacement of main electrical control panels, floor panels and lt cables etc. district hospital bathinda
Special repair/renovation of existing 11 kv sub station along with replacement of main electrical control panels, floor panels and lt cables etc. district hospital bathinda
Read moreRepairs and renovation of ground floor, 1st floor of old apvvp-2 rcc framed structure building in the premises of dm and hs campus koti, hyderabad. sub work: supply of furniture items (2nd call)
Repairs and renovation of ground floor, 1st floor of old apvvp-2 rcc framed structure building in the premises of dm and hs campus koti, hyderabad. sub work: supply of furniture items (2nd call)
Read moreRepair replacement of existing wooden cabin by aluminium work at candm building pps 1.
Repair replacement of existing wooden cabin by aluminium work at candm building pps 1.
Read moreReplacement of old damaged panel by way of supply , installation, testing and commissioning of floor mounted power distribution electric control panel for boiler house at govt. bone and joint hospital, srinagar.
Replacement of old damaged panel by way of supply , installation, testing and commissioning of floor mounted power distribution electric control panel for boiler house at govt. bone and joint hospital, srinagar.
Read moreComposite works of construction of office building (2b plus g plus 12 stories) for delhi pollution control committee with rcc framed structure design including water supply, sanitary installation, internal etc..
Composite works of construction of office building (2b plus g plus 12 stories) for delhi pollution control committee with rcc framed structure design including water supply, sanitary installation, internal etc..
Read moreof your Industry type