Tender Details
Particulars | Details |
---|---|
Title |
Patch Repair Work Of Village Roads On Both Side Of Rath Kalpi Madaripur Road (Sh 130) Ch 29.350 To 51.350 Year 2025 26
|
Description |
Patch Repair Work Of Village Roads On Both Side Of Rath Kalpi Madaripur Road (Sh 130) Ch 29.350 To 51.350 Year 2025 26
|
Organisation | Chief Engineer Jhansi Zone PWD Jhansi UP | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 944 |
EMD | 2 Lakh |
Tender Value | |
Place | Orai |
Link |
AAAAAAAAAA Login to view |
Start Date | May 23, 2025 19:30 |
End Date |
29/05/2025 ( 4 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreWbpwd(r)/se/ chc/nit-01/ 25-26/1 / kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from rayagiri village (design ch.125.000) to tangad palle village (design ch. 160.000) length of 35.000 km in telangana under nh(o) on epc mode (package-v)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from rayagiri village (design ch.125.000) to tangad palle village (design ch. 160.000) length of 35.000 km in telangana under nh(o) on epc mode (package-v)
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)
Read moreCa no ge(u)/chm-35/2025-26 repair to tiling, flooring, joinery, sanitary fittings, aluminium joinery, gi tubing, false ceiling, periodical services of dialysis etc at second floor to fifth floor and terrace at ch under ge (u) chandimandir
Ca no ge(u)/chm-35/2025-26 repair to tiling, flooring, joinery, sanitary fittings, aluminium joinery, gi tubing, false ceiling, periodical services of dialysis etc at second floor to fifth floor and terrace at ch under ge (u) chandimandir
Read moreLaying of paver block and cement concrete work both side of road on removed encroachment place from 60 feet road palhar nagar to ambikapuri in ward no. 14 under zone no. 16
Laying of paver block and cement concrete work both side of road on removed encroachment place from 60 feet road palhar nagar to ambikapuri in ward no. 14 under zone no. 16
Read moreR and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
R and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
Read moreIn ward no 17 buddh nagar construction work of interlocking road and both side drain house of munnu singh to plot of thakur sahab
In ward no 17 buddh nagar construction work of interlocking road and both side drain house of munnu singh to plot of thakur sahab
Read moreFor special repair of various rural link road in mc samana compaction eareth work to 20mm thick open graded pc with seal coat and const. of culvert side drain and road structures with 5 year maintenance under nabard loan mc mb funds, distt patiala.
For special repair of various rural link road in mc samana compaction eareth work to 20mm thick open graded pc with seal coat and const. of culvert side drain and road structures with 5 year maintenance under nabard loan mc mb funds, distt patiala.
Read moreof your Industry type