Tender Details

Particulars Details
Title
Construction Work Of Interlocking Road/Drain From Mewaram House To Sundar House And From Pitam House To Bhagwandas House In Moh Fazalpur.
Description
Construction Work Of Interlocking Road/Drain From Mewaram House To Sundar House And From Pitam House To Bhagwandas House In Moh Fazalpur.
Organisation Directorate of Local Bos UP | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 2360
EMD 1.78 Lakh
Tender Value
Place Gajraula
Link

AAAAAAAAAA

Login to view
Start Date July 11, 2025 22:30
End Date

17/07/2025 ( 4 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Widening and strengthening of stretch from hansdiha(design ch 92.380 km)to chopamore(design km 129.370)of nh-133 to 4lane with paved shoulder in the state of jharkhand. on epc mode for the fy 2025-26

Widening and strengthening of stretch from hansdiha(design ch 92.380 km)to chopamore(design km 129.370)of nh-133 to 4lane with paved shoulder in the state of jharkhand. on epc mode for the fy 2025-26

Read more
Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode

Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode

Read more
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more

Construction to 2-lane with paved shoulder of tura bypass ing from existing km&#x0d 57.500 of nh-127b and ending at existing km 108.750 of nh- 217 (length-29.030 km) on hybrid annuity mode in the state of meghalaya.

Read more
Construction of major bridge, minor bridge service roads,rcc drain, culverts and bus bay between km 367.200 to km 450.170 talgaon . kalmath .zarap section on nh.66 in the state of maharashtra on epc mode

Construction of major bridge, minor bridge service roads,rcc drain, culverts and&#x0d bus bay between km 367.200 to km 450.170 talgaon . kalmath .zarap section on nh.66 in&#x0d the state of maharashtra on epc mode

Read more
Performance based maint contracts esti of initial rectification wk, routine maint wk and periodic maint wks bet km 1.957 to km 65.0 design length 56.618 km km 133.020 to km 137.330 design length 4.316 km chinyal

Pbmc estimate bet km 1.957 to km 65.00, km 133.020 to km 137.330 on rishikesh dharasu road and km 110.860 to km 123.080 on gangotri dharasu road on nh 34 in uttarakhand state (total length 73.192 km) for 5 year maintenance period

Read more
Rehabilitation and upgradation for kopargaon to savli vihir section from km. 354.000 to km.362.663 total length 8.663 of nh 752 g to 4l.ps in the state of maharashtra. repairs of bad patches and dis at the risk and cost of the contractor as p

Rehabilitation and upgradation for kopargaon to savli vihir section from km. 354.000 to km.362.663 total length 8.663 of nh 752 g to 4l.ps in the state of maharashtra. repairs of bad patches and dis at the risk and cost of the contractor as p

Read more
Consultancy services for preparation of feasibility report and detailed project report for construction of greenfield 4 lane of shimla (near tara devi) to shalaghat (near village kolaka) section of nh-205 (old nh-88) from km 0.000 to km 28.800)

Consultancy services for preparation of feasibility report and detailed project report for construction of greenfield 4 lane of shimla (near tara devi) to shalaghat (near village kolaka) section of nh-205 (old nh-88) from km 0.000 to km 28.800) (tent

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise