Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Road Work From Nh 31 Salempur Road To Sobantha Dalit Basti. (Length 800 M)
|
| Description |
Construction Of Road Work From Nh 31 Salempur Road To Sobantha Dalit Basti. (Length 800 M)
|
| Organisation | Director Cum Chief Engineer RED | State Govt. and UT |
| Tender Id | 2026_REDUP_1144739_1 |
|
Reference Number |
16/RED/Cir Aza/Tender/26-27/dt 07.04.2026-26 |
| Tender Fee | 3068 |
| EMD | 71000 |
| Tender Value | - |
| Place | Ballia |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2139108 |
| Start Date | May 02, 2026 23:30 |
| End Date |
Expired
11/05/2026
Expired 157 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Gambhirsingh pur ke purab dalit basti ke samne nale par laghu setu ka nirman karya
Gambhirsingh pur ke purab dalit basti ke samne nale par laghu setu ka nirman karya
Read moreWiper blade having length 800+/- 5 mm for three-phase locomotives
Wiper blade having length 800+/- 5 mm for three-phase locomotives
Read moreShort term maintenance to nh-17(new) / nh-31(old) for the year 2026-27 from (i) km 816/012 to km 829/000 (length 13.094 km) (ii) km 844/000 to km 858/000 (length 12.506 km) (total length of the project 25.600 km) under abhayapuri const. division
Short term maintenance to nh-17(new) / nh-31(old) for the year 2026-27 from (i) km 816/012 to km 829/000 (length 13.094 km) (ii) km 844/000 to km 858/000 (length 12.506 km) (total length of the project 25.600 km) under abhayapuri const. division
Read moreStrengthening of kuchwahi basti road (nh-75 ext.old part) road length- 2.00 km., under pwd sub division. sidhi, distt-sidhi pwd road and bridges sor w.e.f. 11.04.2025
Strengthening of kuchwahi basti road (nh-75 ext.old part) road length- 2.00 km., under pwd sub division. sidhi, distt-sidhi pwd road and bridges sor w.e.f. 11.04.2025
Read moreStrengthening of kubari basti road (nh-75 ext.old part) road length- 1.71 km., under pwd sub division. sidhi, distt-sidhi pwd road and bridges sor w.e.f. 11.04.2025
Strengthening of kubari basti road (nh-75 ext.old part) road length- 1.71 km., under pwd sub division. sidhi, distt-sidhi pwd road and bridges sor w.e.f. 11.04.2025
Read moreWard no. 03 construction of an underground drain and cc road from dalit basti up to the paved road.
Ward no. 03 construction of an underground drain and cc road from dalit basti up to the paved road.
Read moreConsultancy services for authority engineer during operation and maintenance period of chhapra -hajipur section of nh-31 (old nh-19) from km.143.200 to km.209.940 in the state of bihar (total length km. 66.74).
Consultancy services for authority engineer during operation and maintenance period of chhapra -hajipur section of nh-31 (old nh-19) from km.143.200 to km.209.940 in the state of bihar (total length km. 66.74).
Read moreConsultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Consultancy services for dpr preparation for oti of budhar-umaria (nh-43), ponda nala-shahdol bypass and chilman chowk-dindori-mandla road (nh-543), and dindori-mandla road nh-45 junction and nh-543 junction dindori-kabirchabutra road (nh-45)
Read moreSpecial repair work of nh 35 from (bargarh more to nh-135b near dabhaura) on nh-135bb (length 8.00 km) in the state of madhya pradesh
Special repair work of nh 35 from (bargarh more to nh-135b near dabhaura) on nh-135bb (length 8.00 km) in the state of madhya pradesh
Read moreConstruction of service roads at anjanpeer in chhapra - hajipur section of nh-19 (new nh -31) in the state of bihar (3rd call).
Construction of service roads at anjanpeer in chhapra - hajipur section of nh-19 (new nh -31) in the state of bihar (3rd call).
Read moreof your Industry type