Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
To Catch Destitute Animals From The Municipal Corporation Area And Release Them In The Nandishalas By The Corporation Under Mc Sonipat.
|
Description |
To Catch Destitute Animals From The Municipal Corporation Area And Release Them In The Nandishalas By The Corporation Under Mc Sonipat.
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2024_HRY_352113_1 |
Reference Number |
JOB NO. MCS/CSI/SPL 6 |
Tender Fee | 2180 |
EMD | 5000 |
Tender Value | |
Place | MC Sonepat |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=448667 |
Start Date | June 04, 2024 00:00 |
End Date |
12/06/2024 ( Expired 367 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreAppointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreAAAAAAAAAA
Login to viewDevelopment and widening of mahatma gandhi road from charial khal to ashabari more in ward.no-143 and 142 under br-xvi
Read moreRepair to bituminous roads and road furniture in technical and domestic area at dappar under age i dappar
Repair to bituminous roads and road furniture in technical and domestic area at dappar under age i dappar
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreAAAAAAAAAA
Login to viewDi of 400
 kv silchar-imphal
 (from loc no 64 to
 67) and 400
 kv silchar-melriat
 transmission lines
 (from
 loc65 and 68,70 and 72,and
 122 and 125) of power
 grid corporation of
 india on supervision
 basis under nhidcl.
Read moreIndependent engineer services during o and m stage of four-lane zirakpur-parwanoo section of nh-05 (old nh-22) from km. 39.960 to km. 67.550 including pinjore- kalka-parwanoo bypass in the states of pb, hr and hp under nhdp phase-iii a on bot basis
Independent engineer services during o and m stage of four-lane zirakpur-parwanoo section of nh-05 (old nh-22) from km. 39.960 to km. 67.550 including pinjore- kalka-parwanoo bypass in the states of pb, hr and hp under nhdp phase-iii a on bot basis
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreSpecial repairs to road at equipment park 500 m and special repairs to roads in the unit area med regt under ge west at jalandhar
Special repairs to road at equipment park 500 m and special repairs to roads in the unit area med regt under ge west at jalandhar
Read moreof your Industry type