Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fdr Work At Gopalnagar Maharani (Gm Road) (L 20.00 Km) Under Mungiakami Rd Block/Sh Paver Block, C.C Block, Pucca Drain And Palasiding Work Etc. During The Year 2024 25
|
| Description |
Fdr Work At Gopalnagar Maharani (Gm Road) (L 20.00 Km) Under Mungiakami Rd Block/Sh Paver Block, C.C Block, Pucca Drain And Palasiding Work Etc. During The Year 2024 25
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2024_CEPWD_52120_1 |
|
Reference Number |
32/EE/TLM/PWD(RandB)/2024-25 |
| Tender Fee | 1000 |
| EMD | 48538 |
| Tender Value | |
| Place | Mungiakami |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=52989 |
| Start Date | September 03, 2024 21:30 |
| End Date |
Expired
12/09/2024
Expired 657 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Fdr work at gopalnagar-maharani (gm road) (l-20.00 km) under mungiakami r.d. block/ sh- patch gsb, wbm-3, c.c. block and pucca drain work etc. during the year 2024-25
Fdr work at gopalnagar-maharani (gm road) (l-20.00 km) under mungiakami r.d. block/ sh- patch gsb, wbm-3, c.c. block and pucca drain work etc. during the year 2024-25
Read moreFdr work at 41 miles nh-08 to sukhdev para tsr camp (l-3.50 km) under mungiakami rd block/sh- toe wall, c.c block, pucca drain and palasiding work etc. during the year 2024-25, gr-ii
Fdr work at 41 miles nh-08 to sukhdev para tsr camp (l-3.50 km) under mungiakami rd block/sh- toe wall, c.c block, pucca drain and palasiding work etc. during the year 2024-25, gr-ii
Read moreFdr work at uttar maharani bazar to asharamkobra (l-0.40 km) under mungiakami rd block/sh- brick bats wire crates, c.c block and construction of embankment etc. at ch.0.390 km during the year 2024-25
Fdr work at uttar maharani bazar to asharamkobra (l-0.40 km) under mungiakami rd block/sh- brick bats wire crates, c.c block and construction of embankment etc. at ch.0.390 km during the year 2024-25
Read moreProtection work at uttar maharani bazar to asharamkobra (l-0.45 km) under mungiakami rd block/sh- brick bats wirecrates, c.c block and construction of embankment etc. at ch. 0.390 km during the year 2024-25
Protection work at uttar maharani bazar to asharamkobra (l-0.45 km) under mungiakami rd block/sh- brick bats wirecrates, c.c block and construction of embankment etc. at ch. 0.390 km during the year 2024-25
Read morePeriodical repair of road from gopalnagar to maharani road (l-7.484 km) portion from 2.00 km to 7.40 km during the year 2024-25./sh- pucca drain, patch metalling, carpeting etc.(2nd call
Periodical repair of road from gopalnagar to maharani road (l-7.484 km) portion from 2.00 km to 7.40 km during the year 2024-25./sh- pucca drain, patch metalling, carpeting etc.(2nd call
Read moreFdr work at 41 miles nh-08 to sukhdev para tsr camp (l-3.50 km) under mungiakami rd block/sh- retaining wall, earthwork filling and c.c block etc. during the year 2024-25, gr-i
Fdr work at 41 miles nh-08 to sukhdev para tsr camp (l-3.50 km) under mungiakami rd block/sh- retaining wall, earthwork filling and c.c block etc. during the year 2024-25, gr-i
Read moreFdr. of various roads under dasda sub division,pwd rnb during the year 2024 25 sh brick soling, bats filling, bamboo palasiding, jungle clearing and surface drain etc. l 20.00 km
Fdr. of various roads under dasda sub division,pwd rnb during the year 2024 25 sh brick soling, bats filling, bamboo palasiding, jungle clearing and surface drain etc. l 20.00 km
Read moreMtc. of road from 1)gopalnagar to maharani road (l-7.50 km) portion from 3.50 km to 7.33 km 2)gm road to golabari-ghilatali road via nayanpur road (l-1.25 km) during the year 2023-24. / sh- pucca drain, patch metalling, carpetting etc
Mtc. of road from 1)gopalnagar to maharani road (l-7.50 km) portion from 3.50 km to 7.33 km 2)gm road to golabari-ghilatali road via nayanpur road (l-1.25 km) during the year 2023-24. / sh- pucca drain, patch metalling, carpetting etc
Read moreMtc / fdr of road from kalachara-gagan mouja road to mansing para (l-0.355 km) under satchand block in pwd(randb), sabroom division during the year 2024-25
Sh- paver block, retaining wall, toe wall, pucca drain and unlined surface drain etc.(2nd call)
Read moreMtc. of road sanicherra to kherengjuri (link no. t-05 (p-1) under pwd (randb) sub-division kadamtala (l 7.972 km)
Protection work by c.c. block, sand cement bag, road side pucca drain, earth work etc during the year 2023-24
Read moreof your Industry type